CANYON RANCH

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 218471District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$794 k
Feb 2006 – May 2026
Value, last 12 filed months
$468
at the published price for each month
Months reported
244
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-09-18168314
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1 bbl$92
GasProduction140,444 Mcf$793,908
Total$794,000

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.3162, -100.4593. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.31615, -100.45926 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,617 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,617 ft.

Completions filed
Feb 2006
1 of 1 wells

1 well

42-435377321269S6,617 ftFeb 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (244)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

244 months

May 202608106.413.05$24
Apr 202601298.932.87$34
Mar 202601389.753.15$41
Feb 20260963.503.75$34
Jan 20260559.138.00$40
Dec 202501256.664.41$53
Nov 202501458.593.93$55
Oct 20250959.383.30$30
Sep 202501062.743.08$31
Aug 202501263.933.01$36
Jul 202501166.743.32$36
Jun 202501766.483.13$53
May 202501160.553.23$36
Apr 202501362.363.54$46
Mar 202501367.704.27$55
Feb 202501270.884.34$52
Jan 202501374.324.28$56
Dec 202401268.993.12$37
Nov 202401969.052.20$42
Oct 20240871.372.28$18
Sep 202401069.612.36$24
Aug 20240975.632.06$19
Jul 202401079.932.15$21
Jun 20240978.082.63$24
May 202401578.812.20$33
Apr 202401084.451.66$17
Mar 20240880.301.55$12
Feb 20240876.091.78$14
Jan 20240873.023.30$26
Dec 202301271.262.61$31
Nov 20230477.892.81$11
Oct 20230885.443.09$25
Sep 20230989.042.74$25
Aug 20230780.522.67$19
Jul 20230974.852.64$24
Jun 20230968.962.26$20
May 20230970.622.23$20
Apr 20230878.122.24$18
Mar 20230572.852.39$12
Feb 20230575.112.47$12
Jan 20230676.533.39$20
Dec 20220376.415.73$17
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220694.529.13$55
Jul 202200101.587.54$0
Jun 202203115.097.98$24
May 202204109.378.43$34
Apr 202209104.226.84$62
Mar 202209108.885.08$46
Feb 20220991.054.86$44
Jan 202201181.844.54$50
Dec 20210871.323.90$31
Nov 20210577.435.24$26
Oct 20210879.795.71$46
Sep 202101269.865.35$64
Aug 20210866.024.22$34
Jul 202101370.783.98$52
Jun 202101469.493.38$47
May 202106063.483.02$181
Apr 20210060.362.76$0
Mar 202101161.302.72$30
Feb 202101257.805.55$67
Jan 20210550.412.81$14
Dec 202004244.642.68$112
Nov 20200138.772.71$3
Oct 202001136.972.48$27
Sep 202005337.091.99$106
Aug 20200239.982.39$5
Jul 20200038.371.83$0
Jun 20200634.901.69$10
May 20200116.921.81$2
Apr 202002714.751.80$49
Mar 20200130.341.86$2
Feb 20200749.881.98$14
Jan 20200457.252.09$8
Dec 20190059.012.30$0
Nov 20190255.302.75$6
Oct 20190053.472.42$0
Sep 20190155.052.66$3
Aug 201905453.112.30$124
Jul 201901056.272.46$25
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190562.632.75$14
Mar 201902156.803.06$64
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180146.594.19$4
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 201803959.543.11$121
Aug 20180459.403.07$12
Jul 2018010265.142.93$299
Jun 201808060.183.08$246
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 2018020761.222.79$577
Feb 2018032261.782.77$891
Jan 2018032762.874.01$1,311
Dec 2017047957.272.92$1,399
Nov 2017049155.423.12$1,531
Oct 2017053449.292.98$1,593
Sep 2017059447.523.09$1,834
Aug 2017017645.373.00$529
Jul 2017017643.873.09$543
Jun 20170042.493.09$0
May 2017025345.373.26$826
Apr 20170447.933.21$13
Mar 2017044746.772.98$1,334
Feb 2017049950.452.95$1,473
Jan 2017016549.413.42$564
Dec 2016026448.763.72$983
Nov 2016063642.492.64$1,682
Oct 2016046146.193.09$1,425
Sep 2016030941.553.10$958
Aug 2016052141.442.92$1,524
Jul 2016019041.622.92$556
Jun 20160045.352.69$0
May 20160242.521.99$4
Apr 2016027236.561.99$542
Mar 2016058033.011.79$1,041
Feb 2016055526.472.06$1,145
Jan 2016059827.352.36$1,414
Dec 2015043932.362.00$879
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 2015014642.992.76$403
Aug 2015038940.162.87$1,117
Jul 2015056448.152.95$1,661
Jun 2015055656.152.88$1,603
May 2015057755.212.96$1,705
Apr 2015056049.822.71$1,516
Mar 2015057542.892.93$1,687
Feb 2015046644.662.98$1,387
Jan 2015057243.433.10$1,774
Dec 20140054.693.59$0
Nov 201405970.464.25$251
Oct 2014058578.303.90$2,282
Sep 2014058286.164.05$2,354
Aug 2014059889.394.04$2,413
Jul 2014063596.564.18$2,654
Jun 2014064998.164.74$3,074
May 2014072494.734.73$3,422
Apr 2014046495.944.81$2,231
Mar 2014066495.895.06$3,358
Feb 2014058197.406.19$3,598
Jan 2014036590.404.86$1,774
Dec 2013013191.824.35$570
Nov 2013067188.853.74$2,508
Oct 2013071697.423.78$2,706
Sep 20130705104.113.72$2,621
Aug 20130718104.253.52$2,529
Jul 20130709102.523.72$2,636
Jun 2013080894.403.93$3,178
May 2013077094.834.15$3,195
Apr 2013034793.964.28$1,486
Mar 2013074593.623.91$2,915
Feb 2013066191.233.42$2,261
Jan 2013166491.603.42$2,362
Dec 2012080386.773.42$2,746
Nov 2012076286.953.62$2,762
Oct 2012080689.383.40$2,740
Sep 2012076994.672.92$2,244
Aug 2012087192.662.91$2,533
Jul 2012057585.133.02$1,737
Jun 2012080079.822.52$2,015
May 2012042291.612.49$1,050
Apr 20120820101.652.00$1,637
Mar 20120992105.052.22$2,204
Feb 20120980101.102.57$2,519
Jan 2012031998.092.73$872
Dec 2011015396.873.24$496
Nov 2011097895.723.31$3,238
Oct 201101,11784.983.65$4,075
Sep 2011086583.623.99$3,448
Aug 2011025583.404.15$1,058
Jul 2011096994.144.52$4,377
Jun 2011097292.904.64$4,510
May 2011094098.134.40$4,141
Apr 20110923105.964.33$4,000
Mar 2011093696.364.06$3,798
Feb 2011022285.644.18$928
Jan 2011086086.504.59$3,946
Dec 2010083185.734.35$3,613
Nov 2010085680.843.80$3,249
Oct 2010088078.103.51$3,088
Sep 2010092372.633.98$3,673
Aug 2010072073.684.42$3,182
Jul 2010073272.554.74$3,467
Jun 2010069370.364.91$3,403
May 2010074471.124.24$3,151
Apr 2010049381.694.12$2,032
Mar 2010079678.394.39$3,493
Feb 2010082673.585.44$4,495
Jan 2010095674.365.96$5,702
Dec 2009099971.445.48$5,478
Nov 200901,04474.593.75$3,917
Oct 200901,08772.544.11$4,468
Sep 2009071865.543.06$2,200
Aug 200901,16167.423.22$3,737
Jul 200901,21661.133.46$4,213
Jun 200901,13266.163.90$4,409
May 200901,17454.743.93$4,609
Apr 200901,04746.773.59$3,756
Mar 2009085342.144.06$3,462
Feb 2009095132.814.63$4,406
Jan 200901,17735.865.37$6,322
Dec 2008071937.105.98$4,298
Nov 200801,50155.496.86$10,297
Oct 200801,23175.246.92$8,521
Sep 200801,477101.767.88$11,634
Aug 200801,399114.228.48$11,868
Jul 200801,299131.0811.39$14,795
Jun 200801,400131.3313.03$18,246
May 200801,487123.1711.57$17,211
Apr 200801,514110.3110.45$15,829
Mar 200801,700101.909.66$16,429
Feb 200801,23892.538.77$10,858
Jan 200801,40290.388.21$11,504
Dec 200701,10988.337.30$8,098
Nov 200701,12491.677.29$8,196
Oct 200701,05782.856.92$7,317
Sep 200701,10475.846.24$6,894
Aug 200701,12969.066.39$7,212
Jul 200701,05670.906.39$6,746
Jun 200701,30162.007.55$9,821
May 200701,40558.747.85$11,024
Apr 200701,54959.617.81$12,090
Mar 200701,81456.927.30$13,246
Feb 200701,92055.108.22$15,775
Jan 200702,02450.306.73$13,615
Dec 200601,96156.656.92$13,567
Nov 200602,16154.207.62$16,461
Oct 200602,39754.906.01$14,415
Sep 200602,94960.085.04$14,855
Aug 200602,83468.717.34$20,801
Jul 200602,65569.376.34$16,840
Jun 200603,28066.286.38$20,939
May 200603,61966.016.42$23,252
Apr 200604,65064.397.36$34,226
Mar 200606,14256.707.08$43,503
Feb 200606,16757.597.75$47,801

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                    8 Mcf  × $  3.05 =        $24

────────────────────────────────────────────────────
Month total                                      $24

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/218471 is the state's own key, not one this site invented.