Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 219047District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.7 M
Feb 2006 – May 2026
Value, last 12 filed months
$9 k
at the published price for each month
Months reported
244
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-10-19168814
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1 bbl$92
GasProduction293,220 Mcf$1,677,720
Total$1,677,811

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.3214, -100.4599. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.32140, -100.45986 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,600 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,600 ft.

Completions filed
Feb 2006
1 of 1 wells

1 well

42-4353756816S6,600 ftFeb 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (244)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

244 months

May 20260185106.413.05$563
Apr 2026018298.932.87$522
Mar 2026019189.753.15$602
Feb 2026017863.503.75$668
Jan 2026018959.138.00$1,512
Dec 2025020056.664.41$883
Nov 2025019858.593.93$777
Oct 2025021159.383.30$697
Sep 2025020862.743.08$640
Aug 2025022063.933.01$663
Jul 2025022266.743.32$736
Jun 2025022166.483.13$691
May 2025021460.553.23$692
Apr 2025019062.363.54$673
Mar 2025020567.704.27$875
Feb 2025018570.884.34$803
Jan 2025021274.324.28$907
Dec 2024022068.993.12$687
Nov 2024021569.052.20$473
Oct 2024024871.372.28$566
Sep 2024024769.612.36$584
Aug 2024027175.632.06$559
Jul 2024028379.932.15$607
Jun 2024026378.082.63$693
May 2024024078.812.20$528
Apr 2024023084.451.66$382
Mar 2024023780.301.55$366
Feb 2024026576.091.78$473
Jan 2024030773.023.30$1,012
Dec 2023031271.262.61$815
Nov 2023030677.892.81$859
Oct 2023031485.443.09$969
Sep 2023029989.042.74$818
Aug 2023030880.522.67$823
Jul 2023030474.852.64$803
Jun 2023030668.962.26$691
May 2023035070.622.23$780
Apr 2023036578.122.24$817
Mar 2023038372.852.39$917
Feb 2023034975.112.47$861
Jan 2023038876.533.39$1,314
Dec 2022039776.415.73$2,274
Nov 2022039285.005.65$2,213
Oct 2022041087.185.86$2,404
Sep 2022040084.888.16$3,265
Aug 2022041394.529.13$3,770
Jul 20220420101.587.54$3,168
Jun 20220413115.097.98$3,295
May 20220438109.378.43$3,694
Apr 20220436104.226.84$2,981
Mar 20220464108.885.08$2,355
Feb 2022043491.054.86$2,109
Jan 2022050981.844.54$2,310
Dec 2021031871.323.90$1,240
Nov 2021030177.435.24$1,576
Oct 2021026379.795.71$1,503
Sep 2021029369.865.35$1,568
Aug 2021030466.024.22$1,283
Jul 2021031370.783.98$1,246
Jun 2021030769.493.38$1,038
May 2021031663.483.02$954
Apr 2021031560.362.76$869
Mar 2021032661.302.72$886
Feb 2021029657.805.55$1,642
Jan 2021033450.412.81$939
Dec 2020034944.642.68$934
Nov 2020034238.772.71$926
Oct 2020029736.972.48$736
Sep 2020028737.091.99$571
Aug 2020028339.982.39$675
Jul 2020025438.371.83$464
Jun 2020010734.901.69$181
May 20200116.921.81$2
Apr 20200214.751.80$4
Mar 20200030.341.86$0
Feb 20200249.881.98$4
Jan 20200357.252.09$6
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190153.472.42$2
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190156.272.46$2
Jun 20190052.782.49$0
May 20190258.482.74$5
Apr 201901262.632.75$33
Mar 201901556.803.06$46
Feb 2019029550.852.79$824
Jan 201901346.033.23$42
Dec 20180046.594.19$0
Nov 201801552.934.24$64
Oct 20180061.443.40$0
Sep 201808459.543.11$261
Aug 2018035659.403.07$1,092
Jul 2018043465.142.93$1,272
Jun 2018039260.183.08$1,206
May 2018035565.382.90$1,030
Apr 2018050763.842.90$1,471
Mar 2018050861.222.79$1,416
Feb 2018048261.782.77$1,333
Jan 2018034662.874.01$1,387
Dec 2017071457.272.92$2,086
Nov 2017064055.423.12$1,996
Oct 2017069249.292.98$2,065
Sep 2017061147.523.09$1,886
Aug 2017057945.373.00$1,740
Jul 2017057943.873.09$1,788
Jun 2017053542.493.09$1,652
May 2017051345.373.26$1,674
Apr 2017067147.933.21$2,155
Mar 2017063746.772.98$1,901
Feb 2017064550.452.95$1,904
Jan 2017055049.413.42$1,880
Dec 2016082248.763.72$3,060
Nov 2016048642.492.64$1,285
Oct 2016070346.193.09$2,172
Sep 2016058241.553.10$1,805
Aug 2016096141.442.92$2,810
Jul 2016074041.622.92$2,164
Jun 20160145.352.69$3
May 20160342.521.99$6
Apr 20160136.561.99$2
Mar 20160233.011.79$4
Feb 20160826.472.06$17
Jan 2016031827.352.36$752
Dec 2015075832.362.00$1,517
Nov 2015077538.792.17$1,680
Oct 2015084543.552.43$2,050
Sep 2015048742.992.76$1,343
Aug 201501,06340.162.87$3,053
Jul 2015025248.152.95$742
Jun 2015054856.152.88$1,580
May 2015063255.212.96$1,868
Apr 201505049.822.71$135
Mar 2015043342.892.93$1,271
Feb 20150144.662.98$3
Jan 2015027643.433.10$856
Dec 2014093254.693.59$3,347
Nov 2014076170.464.25$3,236
Oct 2014080178.303.90$3,125
Sep 2014087286.164.05$3,528
Aug 2014092489.394.04$3,728
Jul 2014059096.564.18$2,466
Jun 2014056398.164.74$2,667
May 2014084394.734.73$3,984
Apr 2014079595.944.81$3,823
Mar 2014088895.895.06$4,490
Feb 2014074397.406.19$4,601
Jan 2014082490.404.86$4,005
Dec 2013080791.824.35$3,514
Nov 2013076788.853.74$2,867
Oct 2013082797.423.78$3,126
Sep 20130865104.113.72$3,216
Aug 20130915104.253.52$3,223
Jul 20130934102.523.72$3,472
Jun 2013073094.403.93$2,871
May 2013093494.834.15$3,875
Apr 2013076293.964.28$3,263
Mar 2013026893.623.91$1,049
Feb 2013058291.233.42$1,990
Jan 2013160291.603.42$2,150
Dec 201201,51486.773.42$5,178
Nov 201201,52886.953.62$5,539
Oct 201201,51889.383.40$5,161
Sep 201201,51494.672.92$4,418
Aug 2012088092.662.91$2,559
Jul 2012094785.133.02$2,861
Jun 201201,29979.822.52$3,272
May 201201,52091.612.49$3,782
Apr 201201,763101.652.00$3,520
Mar 20120624105.052.22$1,387
Feb 20120100101.102.57$257
Jan 201201,04398.092.73$2,852
Dec 201101,09296.873.24$3,538
Nov 2011084495.723.31$2,795
Oct 201101,47184.983.65$5,367
Sep 201101,51883.623.99$6,050
Aug 201101,43483.404.15$5,950
Jul 201102,10594.144.52$9,509
Jun 201101,03292.904.64$4,788
May 201101,30398.134.40$5,739
Apr 201101,764105.964.33$7,644
Mar 201101,87096.364.06$7,587
Feb 2011068185.644.18$2,847
Jan 201101,10186.504.59$5,052
Dec 201001,68485.734.35$7,322
Nov 201001,67280.843.80$6,346
Oct 201001,66978.103.51$5,856
Sep 201001,65872.633.98$6,598
Aug 201001,57373.684.42$6,952
Jul 201001,64372.554.74$7,782
Jun 201001,63670.364.91$8,033
May 201001,85271.124.24$7,844
Apr 201001,34081.694.12$5,524
Mar 201001,87878.394.39$8,242
Feb 201001,85873.585.44$10,112
Jan 201001,82874.365.96$10,902
Dec 200902,07671.445.48$11,384
Nov 200902,11874.593.75$7,946
Oct 200901,88872.544.11$7,760
Sep 200902,06565.543.06$6,329
Aug 200901,80067.423.22$5,793
Jul 200902,03661.133.46$7,054
Jun 200902,05866.163.90$8,016
May 200901,99254.743.93$7,820
Apr 200901,67946.773.59$6,023
Mar 200901,89142.144.06$7,676
Feb 200901,83032.814.63$8,478
Jan 200902,29235.865.37$12,310
Dec 200802,31737.105.98$13,849
Nov 200802,33855.496.86$16,040
Oct 200802,16375.246.92$14,972
Sep 200802,696101.767.88$21,237
Aug 200802,213114.228.48$18,773
Jul 200801,903131.0811.39$21,674
Jun 200802,811131.3313.03$36,635
May 200802,917123.1711.57$33,762
Apr 200802,133110.3110.45$22,300
Mar 200802,525101.909.66$24,402
Feb 200802,71092.538.77$23,768
Jan 200802,91490.388.21$23,912
Dec 200702,99588.337.30$21,869
Nov 200702,81191.677.29$20,497
Oct 200703,15182.856.92$21,811
Sep 200703,00275.846.24$18,745
Aug 200702,89469.066.39$18,487
Jul 200703,22470.906.39$20,595
Jun 200703,46262.007.55$26,133
May 200703,75058.747.85$29,424
Apr 200703,68459.617.81$28,754
Mar 200704,40956.927.30$32,194
Feb 200704,30455.108.22$35,362
Jan 200705,17550.306.73$34,811
Dec 200605,46256.656.92$37,789
Nov 200606,24454.207.62$47,564
Oct 200604,55154.906.01$27,369
Sep 200603,83760.085.04$19,328
Aug 200607,13168.717.34$52,341
Jul 200608,42169.376.34$53,412
Jun 200608,64866.286.38$55,208
May 2006011,39866.016.42$73,232
Apr 2006011,19964.397.36$82,430
Mar 2006014,09356.707.08$99,820
Feb 200603,63457.597.75$28,168

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  185 Mcf  × $  3.05 =       $563

────────────────────────────────────────────────────
Month total                                     $563

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/219047 is the state's own key, not one this site invented.