SHURLEY 147

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 219721District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$951 k
Jan 2006 – May 2026
Value, last 12 filed months
$737
at the published price for each month
Months reported
245
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-10-19168791
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,080 bbl$77,502
GasProduction137,486 Mcf$873,122
Total$950,624

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4704, -100.7233. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.47038, -100.72330 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,191 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,191 ft.

Completions filed
Jan 2006
1 of 1 wells

1 well

42-43537756207,191 ftJan 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (245)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

245 months

May 202600106.413.05$0
Apr 20260398.932.87$9
Mar 202601889.753.15$57
Feb 202601663.503.75$60
Jan 202601859.138.00$144
Dec 202502056.664.41$88
Nov 202501658.593.93$63
Oct 202501859.383.30$59
Sep 202501962.743.08$58
Aug 202502163.933.01$63
Jul 202502266.743.32$73
Jun 202502066.483.13$63
May 202502260.553.23$71
Apr 202502262.363.54$78
Mar 202502367.704.27$98
Feb 20250270.884.34$9
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220181.844.54$5
Dec 20210171.323.90$4
Nov 20210177.435.24$5
Oct 20210179.795.71$6
Sep 20210169.865.35$5
Aug 20210166.024.22$4
Jul 20210170.783.98$4
Jun 20210169.493.38$3
May 20211163.483.02$67
Apr 202102360.362.76$63
Mar 202104161.302.72$111
Feb 202103057.805.55$166
Jan 202104050.412.81$112
Dec 202004344.642.68$115
Nov 202004338.772.71$116
Oct 202004636.972.48$114
Sep 202004537.091.99$90
Aug 202004739.982.39$112
Jul 202004638.371.83$84
Jun 202004634.901.69$78
May 202004916.921.81$89
Apr 202015014.751.80$105
Mar 202015130.341.86$125
Feb 202025049.881.98$199
Jan 202025657.252.09$232
Dec 201965759.012.30$485
Nov 201985855.302.75$602
Oct 201956053.472.42$412
Sep 201905755.052.66$151
Aug 201956553.112.30$415
Jul 201997056.272.46$679
Jun 201977352.782.49$551
May 201908058.482.74$219
Apr 201929062.632.75$373
Mar 2019211556.803.06$466
Feb 2019519850.852.79$807
Jan 201901546.033.23$48
Dec 201801246.594.19$50
Nov 20180452.934.24$17
Oct 201806461.443.40$217
Sep 201808359.543.11$258
Aug 2018012259.403.07$374
Jul 201802465.142.93$70
Jun 2018013960.183.08$428
May 201801365.382.90$38
Apr 201802263.842.90$64
Mar 20180161.222.79$3
Feb 201806061.782.77$166
Jan 20180062.874.01$0
Dec 20170257.272.92$6
Nov 201707055.423.12$218
Oct 2017011949.292.98$355
Sep 2017012447.523.09$383
Aug 2017013545.373.00$406
Jul 2017016043.873.09$494
Jun 2017017442.493.09$537
May 20170545.373.26$16
Apr 20170047.933.21$0
Mar 201706546.772.98$194
Feb 2017011650.452.95$343
Jan 2017017749.413.42$605
Dec 2016018348.763.72$681
Nov 2016020242.492.64$534
Oct 2016023746.193.09$732
Sep 2016025041.553.10$775
Aug 2016028941.442.92$845
Jul 2016033041.622.92$965
Jun 2016031545.352.69$846
May 20160142.521.99$2
Apr 20160136.561.99$2
Mar 20160033.011.79$0
Feb 20160126.472.06$2
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150143.552.43$2
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20150256.152.88$6
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150142.892.93$3
Feb 20150044.662.98$0
Jan 20150343.433.10$9
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 201414478.303.90$250
Sep 201419586.164.05$470
Aug 201409989.394.04$399
Jul 201409896.564.18$410
Jun 201409998.164.74$469
May 201417494.734.73$445
Apr 201408995.944.81$428
Mar 20140295.895.06$10
Feb 20140397.406.19$19
Jan 20140790.404.86$34
Dec 20130991.824.35$39
Nov 201304888.853.74$179
Oct 20132597.423.78$214
Sep 20133429104.113.72$1,907
Aug 20132632104.253.52$2,435
Jul 20131455102.523.72$1,794
Jun 2013234794.403.93$1,554
May 2013117194.834.15$804
Apr 2013114293.964.28$702
Mar 2013110193.623.91$489
Feb 2013111291.233.42$474
Jan 2013113991.603.42$567
Dec 2012115186.773.42$603
Nov 2012113786.953.62$584
Oct 201219789.383.40$419
Sep 2012329394.672.92$1,139
Aug 2012154892.662.91$1,686
Jul 2012455685.133.02$2,020
Jun 2012454679.822.52$1,695
May 2012357891.612.49$1,713
Apr 20125576101.652.00$1,658
Mar 20124629105.052.22$1,818
Feb 20123578101.102.57$1,789
Jan 2012341598.092.73$1,429
Dec 2011346396.873.24$1,791
Nov 2011446395.723.31$1,916
Oct 2011338784.983.65$1,667
Sep 2011353283.623.99$2,371
Aug 2011356783.404.15$2,603
Jul 2011450794.144.52$2,667
Jun 2011463792.904.64$3,327
May 2011463498.134.40$3,185
Apr 20115743105.964.33$3,749
Mar 2011779896.364.06$3,912
Feb 2011570885.644.18$3,388
Jan 2011891486.504.59$4,886
Dec 2010769185.734.35$3,604
Nov 2010698380.843.80$4,216
Oct 2010481778.103.51$3,179
Sep 2010574872.633.98$3,340
Aug 2010481473.684.42$3,892
Jul 2010472672.554.74$3,729
Jun 2010470470.364.91$3,738
May 2010685271.124.24$4,035
Apr 2010885081.694.12$4,158
Mar 2010893278.394.39$4,717
Feb 2010688473.585.44$5,253
Jan 201091,01074.365.96$6,693
Dec 200971,05671.445.48$6,291
Nov 2009897774.593.75$4,262
Oct 2009698872.544.11$4,496
Sep 2009592965.543.06$3,175
Aug 200961,05567.423.22$3,800
Jul 2009111,08361.133.46$4,424
Jun 200941,05466.163.90$4,370
May 2009111,20454.743.93$5,329
Apr 2009896546.773.59$3,836
Mar 2009101,19242.144.06$5,260
Feb 200951,22532.814.63$5,839
Jan 2009121,47835.865.37$8,369
Dec 2008111,28437.105.98$8,083
Nov 2008111,48055.496.86$10,764
Oct 2008171,52775.246.92$11,849
Sep 2008121,593101.767.88$13,769
Aug 2008111,680114.228.48$15,508
Jul 200871,702131.0811.39$20,302
Jun 2008161,713131.3313.03$24,426
May 2008331,669123.1711.57$23,382
Apr 2008341,556110.3110.45$20,018
Mar 2008361,653101.909.66$19,643
Feb 200881,63292.538.77$15,054
Jan 200861,75090.388.21$14,902
Dec 200761,81888.337.30$13,805
Nov 2007101,81291.677.29$14,129
Oct 200751,70582.856.92$12,216
Sep 200751,37475.846.24$8,959
Aug 200761,74069.066.39$11,529
Jul 2007112,03270.906.39$13,760
Jun 200741,50462.007.55$11,601
May 2007421,69658.747.85$15,774
Apr 20071891,74959.617.81$24,918
Mar 2007702,00056.927.30$18,588
Feb 200781,87755.108.22$15,862
Jan 2007362,21150.306.73$16,684
Dec 200692,05856.656.92$14,748
Nov 200682,26654.207.62$17,695
Oct 2006132,90554.906.01$18,184
Sep 200683,11460.085.04$16,166
Aug 200673,47868.717.34$26,009
Jul 2006143,82569.376.34$25,232
Jun 2006144,40766.286.38$29,062
May 2006224,58366.016.42$30,898
Apr 2006175,40364.397.36$40,863
Mar 2006457,13156.707.08$53,060
Feb 200658,95557.597.75$69,699
Jan 200604,31060.598.93$38,503

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $ 98.93 =         $0
Gas                    3 Mcf  × $  2.87 =         $9

────────────────────────────────────────────────────
Month total                                       $9

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/219721 is the state's own key, not one this site invented.