SHURLEY 147

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 225711District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.1 M
Nov 2006 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
235
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-04-23174389
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,007 bbl$77,782
GasProduction180,244 Mcf$1,011,207
Total$1,088,989

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4677, -100.7271. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.46771, -100.72712 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,353 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,353 ft.

Completions filed
Nov 2006
1 of 1 wells

1 well

42-43537763217,353 ftNov 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (235)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

235 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202203101.587.54$23
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210263.483.02$6
Apr 20210860.362.76$22
Mar 202105361.302.72$144
Feb 202101457.805.55$78
Jan 202104650.412.81$129
Dec 202003744.642.68$99
Nov 202003738.772.71$100
Oct 202003336.972.48$82
Sep 2020015037.091.99$299
Aug 202006739.982.39$160
Jul 202006238.371.83$113
Jun 2020010334.901.69$174
May 2020013916.921.81$252
Apr 2020013514.751.80$244
Mar 2020014330.341.86$265
Feb 2020020849.881.98$412
Jan 2020027957.252.09$584
Dec 2019030559.012.30$703
Nov 2019034955.302.75$960
Oct 2019051253.472.42$1,238
Sep 2019053355.052.66$1,416
Aug 2019035453.112.30$816
Jul 201906856.272.46$167
Jun 201909452.782.49$234
May 2019010758.482.74$293
Apr 2019012162.632.75$333
Mar 201907756.803.06$236
Feb 2019014950.852.79$416
Jan 2019019546.033.23$630
Dec 2018025046.594.19$1,046
Nov 2018053652.934.24$2,271
Oct 2018039461.443.40$1,339
Sep 2018033259.543.11$1,032
Aug 2018013559.403.07$414
Jul 2018013565.142.93$396
Jun 201805460.183.08$166
May 2018020865.382.90$603
Apr 2018128463.842.90$888
Mar 2018130161.222.79$900
Feb 2018028861.782.77$797
Jan 2018133462.874.01$1,402
Dec 2017034657.272.92$1,011
Nov 2017037455.423.12$1,166
Oct 2017040849.292.98$1,217
Sep 2017041347.523.09$1,275
Aug 2017044345.373.00$1,331
Jul 2017047443.873.09$1,463
Jun 2017047442.493.09$1,463
May 2017149045.373.26$1,644
Apr 2017049347.933.21$1,583
Mar 2017055146.772.98$1,644
Feb 2017053050.452.95$1,565
Jan 2017060549.413.42$2,068
Dec 2016110248.763.72$428
Nov 2016064342.492.64$1,700
Oct 2016168946.193.09$2,175
Sep 2016168241.553.10$2,156
Aug 2016273241.442.92$2,224
Jul 2016073441.622.92$2,146
Jun 2016267545.352.69$1,904
May 2016281242.521.99$1,702
Apr 2016484736.561.99$1,833
Mar 2016489533.011.79$1,738
Feb 2016485326.472.06$1,866
Jan 2016695527.352.36$2,422
Dec 201541,03132.362.00$2,193
Nov 2015499838.792.17$2,318
Oct 201561,10743.552.43$2,948
Sep 201551,23442.992.76$3,619
Aug 201561,42640.162.87$4,337
Jul 2015171,63048.152.95$5,619
Jun 2015136656.152.88$1,111
May 2015130655.212.96$960
Apr 2015130249.822.71$867
Mar 2015231542.892.93$1,010
Feb 2015129444.662.98$920
Jan 2015233043.433.10$1,110
Dec 2014233254.693.59$1,302
Nov 2014133570.464.25$1,495
Oct 2014236178.303.90$1,565
Sep 2014235386.164.05$1,600
Aug 2014136389.394.04$1,554
Jul 2014137996.564.18$1,681
Jun 2014138298.164.74$1,908
May 2014240794.734.73$2,113
Apr 2014342495.944.81$2,327
Mar 2014138895.895.06$2,058
Feb 2014240197.406.19$2,678
Jan 2014346190.404.86$2,512
Dec 2013247291.824.35$2,239
Nov 2013348988.853.74$2,095
Oct 2013346297.423.78$2,038
Sep 20132457104.113.72$1,907
Aug 20132505104.253.52$1,987
Jul 20132516102.523.72$2,123
Jun 2013451994.403.93$2,419
May 2013356694.834.15$2,633
Apr 2013456593.964.28$2,796
Mar 2013357593.623.91$2,531
Feb 2013452991.233.42$2,174
Jan 2013663091.603.42$2,704
Dec 2012574286.773.42$2,972
Nov 2012676586.953.62$3,295
Oct 2012483689.383.40$3,200
Sep 2012586294.672.92$2,989
Aug 2012394892.662.91$3,035
Jul 2012596385.133.02$3,335
Jun 2012590879.822.52$2,686
May 201241,00991.612.49$2,877
Apr 20126882101.652.00$2,371
Mar 20126895105.052.22$2,619
Feb 20123914101.102.57$2,653
Jan 2012478498.092.73$2,536
Dec 2011483996.873.24$3,106
Nov 2011688895.723.31$3,515
Oct 2011491684.983.65$3,682
Sep 2011392483.623.99$3,934
Aug 2011691083.404.15$4,276
Jul 2011698494.144.52$5,010
Jun 201161,07192.904.64$5,527
May 201161,02798.134.40$5,113
Apr 201171,034105.964.33$5,222
Mar 201181,15396.364.06$5,449
Feb 2011693485.644.18$4,418
Jan 201191,15786.504.59$6,088
Dec 2010111,17685.734.35$6,056
Nov 2010101,17880.843.80$5,279
Oct 201071,26378.103.51$4,978
Sep 2010111,28872.633.98$5,924
Aug 2010101,41073.684.42$6,968
Jul 201081,41072.554.74$7,259
Jun 201071,18170.364.91$6,292
May 2010101,11571.124.24$5,433
Apr 2010111,11481.694.12$5,491
Mar 2010151,30278.394.39$6,890
Feb 2010151,47673.585.44$9,137
Jan 2010191,63674.365.96$11,170
Dec 2009181,71271.445.48$10,674
Nov 2009132,19374.593.75$9,197
Oct 20090072.544.11$0
Sep 20093065.543.06$197
Aug 200981,54567.423.22$5,512
Jul 200971,66361.133.46$6,189
Jun 200961,56066.163.90$6,473
May 200991,67854.743.93$7,080
Apr 2009101,39846.773.59$5,483
Mar 200991,64042.144.06$7,036
Feb 200971,58632.814.63$7,578
Jan 2009111,74635.865.37$9,772
Dec 2008111,79237.105.98$11,119
Nov 2008111,92255.496.86$13,796
Oct 2008132,07975.246.92$15,369
Sep 2008112,103101.767.88$17,685
Aug 200882,328114.228.48$20,662
Jul 2008102,487131.0811.39$29,636
Jun 2008242,360131.3313.03$33,909
May 2008202,641123.1711.57$33,031
Apr 2008182,526110.3110.45$28,395
Mar 2008192,710101.909.66$28,126
Feb 2008332,83592.538.77$27,918
Jan 2008333,18990.388.21$29,151
Dec 2007233,45888.337.30$27,282
Nov 2007413,68991.677.29$30,658
Oct 2007243,86682.856.92$28,749
Sep 2007182,32575.846.24$15,883
Aug 200761,66669.066.39$11,057
Jul 2007341,88270.906.39$14,433
Jun 200792,26562.007.55$17,655
May 2007224,08658.747.85$33,352
Apr 2007214,67759.617.81$37,757
Mar 2007215,27056.927.30$39,677
Feb 2007245,24555.108.22$44,415
Jan 2007256,67850.306.73$46,179
Dec 2006248,10156.656.92$57,406
Nov 200621,38554.207.62$10,659

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jul 2022 — as filed, then multipliedworked
Condensate             0 bbl  × $101.58 =         $0
Gas                    3 Mcf  × $  7.54 =        $23

────────────────────────────────────────────────────
Month total                                      $23

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/225711 is the state's own key, not one this site invented.