BROWN SW "211"

Operated by BRP ENERGY, LLC (P-5 41519) in the GEASLIN (WOLFCAMP) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 220297District 7CField 34300700CondensateGasSaveExport
Value, all time
$3.5 M
Jun 2006 – May 2026
Value, last 12 filed months
$31 k
at the published price for each month
Months reported
240
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 169 leases and 169 wells, and the rule below applies to all of them.

Discovered
1995-05-19
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2001-07-24.

The Commission's schedule remark for this field reads: 8000FT AS SHOWN ON THE LOG OF THE GEASLIN 198 LEASE, WELL NO. 1.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition185 bbl$13,326
GasProduction745,804 Mcf$3,503,417
Total$3,516,744

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.3456, -101.8806. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.34562, -101.88062 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,510 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,510 ft.

Completions filed
Jun 2006
1 of 1 wells

1 well

42-44331150447,510 ftJun 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (240)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

240 months

May 202600106.413.05$0
Apr 202607498.932.87$212
Mar 20265089.753.15$449
Feb 2026010463.503.75$390
Jan 2026068259.138.00$5,455
Dec 2025093256.664.41$4,113
Nov 2025068958.593.93$2,705
Oct 202571,37559.383.30$4,960
Sep 2025011162.743.08$342
Aug 202531,14863.933.01$3,653
Jul 202501,52766.743.32$5,062
Jun 202501,27066.483.13$3,973
May 202541,29860.553.23$4,438
Apr 20250062.363.54$0
Mar 2025054067.704.27$2,305
Feb 202562,59670.884.34$11,694
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 202401,83769.052.20$4,039
Oct 2024793971.372.28$2,642
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 2024035979.932.15$771
Jun 202401,32878.082.63$3,498
May 202401,82378.812.20$4,008
Apr 20240084.451.66$0
Mar 2024022780.301.55$351
Feb 202441,27276.091.78$2,573
Jan 202451,98073.023.30$6,894
Dec 202302,11671.262.61$5,524
Nov 202351,91177.892.81$5,755
Oct 202341,87885.443.09$6,140
Sep 202301,73589.042.74$4,745
Aug 202301680.522.67$43
Jul 202351,89074.852.64$5,367
Jun 202301,35068.962.26$3,049
May 202301,54370.622.23$3,437
Apr 202344478.122.24$411
Mar 202352,27372.852.39$5,804
Feb 202362,30975.112.47$6,144
Jan 202301,11176.533.39$3,764
Dec 2022316476.415.73$1,169
Nov 2022012985.005.65$728
Oct 202201,65387.185.86$9,693
Sep 202231,43884.888.16$11,994
Aug 202231,44494.529.13$13,463
Jul 202201,551101.587.54$11,698
Jun 202231,526115.097.98$12,518
May 202231,665109.378.43$14,369
Apr 202241,870104.226.84$13,203
Mar 202231,551108.885.08$8,200
Feb 202251,56491.054.86$8,054
Jan 202271,75681.844.54$8,541
Dec 202141,83271.323.90$7,428
Nov 2021102,12777.435.24$11,913
Oct 202101,84079.795.71$10,514
Sep 202101,88869.865.35$10,103
Aug 202101,90866.024.22$8,053
Jul 202101,70670.783.98$6,793
Jun 202171,82969.493.38$6,670
May 202172,08963.483.02$6,748
Apr 202101,98260.362.76$5,467
Mar 202102,38861.302.72$6,488
Feb 202141,99857.805.55$11,316
Jan 202102,51350.412.81$7,062
Dec 202001,63344.642.68$4,369
Nov 202041,99538.772.71$5,555
Oct 202002,21936.972.48$5,500
Sep 202001,90537.091.99$3,793
Aug 202011,93539.982.39$4,655
Jul 202002,23338.371.83$4,075
Jun 202001,94834.901.69$3,293
May 202022,05716.921.81$3,767
Apr 202002,16514.751.80$3,906
Mar 202002,67530.341.86$4,965
Feb 202001,67249.881.98$3,312
Jan 202021,65457.252.09$3,579
Dec 201901,95059.012.30$4,494
Nov 201901,11555.302.75$3,067
Oct 201902,06853.472.42$5,002
Sep 201931,81555.052.66$4,988
Aug 201902,08453.112.30$4,802
Jul 201902,13056.272.46$5,240
Jun 201902,07352.782.49$5,164
May 201902,20158.482.74$6,031
Apr 201912,15962.632.75$6,001
Mar 201902,16056.803.06$6,614
Feb 201902,03350.852.79$5,677
Jan 201902,29946.033.23$7,422
Dec 201812,46246.594.19$10,351
Nov 201812,39752.934.24$10,210
Oct 201802,45761.443.40$8,349
Sep 201842,45459.543.11$7,865
Aug 201802,60859.403.07$7,998
Jul 201802,68765.142.93$7,878
Jun 201802,39660.183.08$7,372
May 201822,69765.382.90$7,954
Apr 201802,65163.842.90$7,690
Mar 201812,77661.222.79$7,797
Feb 201802,33661.782.77$6,462
Jan 201802,51962.874.01$10,099
Dec 201742,73657.272.92$8,222
Nov 201702,77455.423.12$8,650
Oct 201702,49749.292.98$7,450
Sep 201732,78147.523.09$8,728
Aug 201702,59545.373.00$7,796
Jul 201722,61043.873.09$8,146
Jun 201702,08642.493.09$6,440
May 201702,71445.373.26$8,857
Apr 201702,51647.933.21$8,080
Mar 201702,34446.772.98$6,994
Feb 201702,25650.452.95$6,661
Jan 201702,24249.413.42$7,665
Dec 201602,35148.763.72$8,752
Nov 201602,20642.492.64$5,833
Oct 201602,68346.193.09$8,291
Sep 201602,27941.553.10$7,066
Aug 201602,62041.442.92$7,662
Jul 201602,56141.622.92$7,489
Jun 201602,80645.352.69$7,536
May 201612,97542.521.99$5,966
Apr 201602,70236.561.99$5,380
Mar 201602,95933.011.79$5,308
Feb 201602,91326.472.06$6,011
Jan 201602,69327.352.36$6,367
Dec 201502,91632.362.00$5,836
Nov 201502,94838.792.17$6,389
Oct 201513,12143.552.43$7,617
Sep 201503,10642.992.76$8,568
Aug 201503,22340.162.87$9,258
Jul 201503,04948.152.95$8,980
Jun 201502,27656.152.88$6,561
May 201502,57955.212.96$7,622
Apr 201502,89849.822.71$7,844
Mar 201502,82942.892.93$8,302
Feb 201502,75744.662.98$8,205
Jan 201502,48543.433.10$7,705
Dec 201402,76454.693.59$9,927
Nov 201402,69270.464.25$11,446
Oct 201403,10178.303.90$12,097
Sep 201402,80986.164.05$11,364
Aug 201402,81489.394.04$11,355
Jul 201402,80996.564.18$11,741
Jun 201402,77598.164.74$13,145
May 201402,89594.734.73$13,683
Apr 201403,08695.944.81$14,841
Mar 201403,31595.895.06$16,763
Feb 201403,04597.406.19$18,855
Jan 201403,26590.404.86$15,870
Dec 201303,38791.824.35$14,749
Nov 201303,07388.853.74$11,488
Oct 201303,41697.423.78$12,910
Sep 201303,270104.113.72$12,157
Aug 201303,291104.253.52$11,593
Jul 201303,349102.523.72$12,451
Jun 201303,43894.403.93$13,523
May 201303,47294.834.15$14,406
Apr 201303,33393.964.28$14,274
Mar 201303,47993.623.91$13,613
Feb 201303,24091.233.42$11,081
Jan 201303,52291.603.42$12,045
Dec 201203,62486.773.42$12,395
Nov 201203,42686.953.62$12,419
Oct 201203,67589.383.40$12,494
Sep 201203,64194.672.92$10,626
Aug 201203,71992.662.91$10,815
Jul 201203,83185.133.02$11,573
Jun 201203,24579.822.52$8,174
May 201203,60091.612.49$8,958
Apr 201203,601101.652.00$7,190
Mar 201203,788105.052.22$8,417
Feb 201203,617101.102.57$9,297
Jan 201203,76298.092.73$10,286
Dec 201103,83396.873.24$12,418
Nov 201103,93595.723.31$13,030
Oct 201103,95984.983.65$14,445
Sep 201103,23783.623.99$12,902
Aug 201114,12283.404.15$17,187
Jul 201103,79194.144.52$17,125
Jun 201103,77492.904.64$17,511
May 201104,12098.134.40$18,148
Apr 201114,017105.964.33$17,513
Mar 201114,17096.364.06$17,015
Feb 201103,88485.644.18$16,235
Jan 201114,23986.504.59$19,538
Dec 201003,97185.734.35$17,265
Nov 201014,15180.843.80$15,835
Oct 201004,30878.103.51$15,116
Sep 201014,11972.633.98$16,464
Aug 201004,37273.684.42$19,321
Jul 201014,44772.554.74$21,136
Jun 201014,33470.364.91$21,352
May 201004,47371.124.24$18,944
Apr 201004,32781.694.12$17,839
Mar 201004,59278.394.39$20,153
Feb 201004,13073.585.44$22,477
Jan 201004,77474.365.96$28,473
Dec 200904,74971.445.48$26,042
Nov 200904,49874.593.75$16,874
Oct 200914,84572.544.11$19,987
Sep 200904,75865.543.06$14,582
Aug 200904,97967.423.22$16,025
Jul 200915,11261.133.46$17,772
Jun 200914,91566.163.90$19,210
May 200915,31254.743.93$20,908
Apr 200915,39846.773.59$19,412
Mar 200925,98342.144.06$24,369
Feb 200904,38232.814.63$20,302
Jan 200904,68035.865.37$25,136
Dec 200805,11337.105.98$30,561
Nov 200804,37055.496.86$29,980
Oct 200805,27075.246.92$36,479
Sep 200802,807101.767.88$22,111
Aug 200805,215114.228.48$44,239
Jul 200805,147131.0811.39$58,621
Jun 200805,353131.3313.03$69,764
May 200804,829123.1711.57$55,892
Apr 200805,076110.3110.45$53,069
Mar 200804,960101.909.66$47,934
Feb 200805,09792.538.77$44,704
Jan 200805,83290.388.21$47,856
Dec 200706,03888.337.30$44,089
Nov 200705,99291.677.29$43,692
Oct 200706,49882.856.92$44,979
Sep 200706,46875.846.24$40,387
Aug 200706,95469.066.39$44,422
Jul 200706,98970.906.39$44,645
Jun 200706,47462.007.55$48,869
May 200706,33058.747.85$49,667
Apr 200706,27859.617.81$49,001
Mar 200706,73356.927.30$49,164
Feb 200706,41555.108.22$52,706
Jan 200707,48450.306.73$50,344
Dec 200608,15456.656.92$56,413
Nov 200609,81054.207.62$74,727
Oct 2006010,87954.906.01$65,424
Sep 2006011,63460.085.04$58,603
Aug 2006013,90568.717.34$102,062
Jul 2006017,43469.376.34$110,580
Jun 200613,00566.286.38$19,250

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $ 98.93 =         $0
Gas                   74 Mcf  × $  2.87 =       $212

────────────────────────────────────────────────────
Month total                                     $212

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/220297 is the state's own key, not one this site invented.