BROWN SW "211"

Operated by BRP ENERGY, LLC (P-5 41519) in the GEASLIN (WOLFCAMP) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 221050District 7CField 34300700CondensateGasSaveExport
Value, all time
$1.8 M
Aug 2006 – May 2026
Value, last 12 filed months
$4 k
at the published price for each month
Months reported
238
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 169 leases and 169 wells, and the rule below applies to all of them.

Discovered
1995-05-19
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2001-07-24.

The Commission's schedule remark for this field reads: 8000FT AS SHOWN ON THE LOG OF THE GEASLIN 198 LEASE, WELL NO. 1.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition102 bbl$6,801
GasProduction340,845 Mcf$1,795,352
Total$1,802,154

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.3436, -101.8852. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.34361, -101.88516 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,493 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,493 ft.

Completions filed
Aug 2006
1 of 1 wells

1 well

42-44331149437,493 ftAug 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (238)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

238 months

May 202600106.413.05$0
Apr 20260798.932.87$20
Mar 20260089.753.15$0
Feb 20260963.503.75$34
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 2025014858.593.93$581
Oct 20250059.383.30$0
Sep 202504362.743.08$132
Aug 2025125363.933.01$827
Jul 2025026666.743.32$882
Jun 2025033166.483.13$1,036
May 2025016460.553.23$530
Apr 20250062.363.54$0
Mar 2025010267.704.27$435
Feb 2025147570.884.34$2,133
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 2024020169.052.20$442
Oct 2024228071.372.28$782
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 2024039378.082.63$1,035
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 202409680.301.55$148
Feb 2024526976.091.78$860
Jan 2024134273.023.30$1,201
Dec 2023045871.262.61$1,196
Nov 2023134677.892.81$1,049
Oct 2023021585.443.09$664
Sep 2023025689.042.74$700
Aug 20230080.522.67$0
Jul 2023531174.852.64$1,196
Jun 2023023168.962.26$522
May 2023032670.622.23$726
Apr 202301878.122.24$40
Mar 2023141772.852.39$1,071
Feb 2023068375.112.47$1,684
Jan 20230976.533.39$30
Dec 202214376.415.73$323
Nov 202209985.005.65$559
Oct 2022252387.185.86$3,241
Sep 2022158484.888.16$4,852
Aug 2022163994.529.13$5,927
Jul 20220707101.587.54$5,332
Jun 20222536115.097.98$4,506
May 20221616109.378.43$5,304
Apr 20221654104.226.84$4,576
Mar 20221477108.885.08$2,530
Feb 2022153491.054.86$2,686
Jan 2022371081.844.54$3,467
Dec 2021148571.323.90$1,962
Nov 2021354377.435.24$3,076
Oct 2021052579.795.71$3,000
Sep 2021053969.865.35$2,884
Aug 2021054566.024.22$2,300
Jul 2021056370.783.98$2,242
Jun 2021258969.493.38$2,130
May 2021267363.483.02$2,158
Apr 2021026060.362.76$717
Mar 2021052861.302.72$1,435
Feb 2021333357.805.55$2,021
Jan 202101,10450.412.81$3,103
Dec 2020026844.642.68$717
Nov 2020466938.772.71$1,966
Oct 2020028936.972.48$716
Sep 202001,06337.091.99$2,116
Aug 2020139939.982.39$992
Jul 2020060638.371.83$1,106
Jun 2020091934.901.69$1,553
May 2020256916.921.81$1,066
Apr 2020042714.751.80$770
Mar 2020063530.341.86$1,179
Feb 2020037749.881.98$747
Jan 20200157.252.09$2
Dec 2019355759.012.30$1,461
Nov 2019038955.302.75$1,070
Oct 2019082553.472.42$1,995
Sep 2019368855.052.66$1,993
Aug 2019070153.112.30$1,615
Jul 2019387156.272.46$2,312
Jun 2019075552.782.49$1,881
May 2019063858.482.74$1,748
Apr 2019282762.632.75$2,400
Mar 2019087756.803.06$2,685
Feb 2019089350.852.79$2,493
Jan 2019162346.033.23$2,057
Dec 2018094946.594.19$3,972
Nov 2018194652.934.24$4,061
Oct 2018092161.443.40$3,130
Sep 2018490759.543.11$3,057
Aug 2018198559.403.07$3,080
Jul 2018089865.142.93$2,633
Jun 2018068760.183.08$2,114
May 2018293365.382.90$2,837
Apr 2018091463.842.90$2,651
Mar 2018281961.222.79$2,405
Feb 2018090161.782.77$2,492
Jan 201821,01862.874.01$4,207
Dec 201701,02357.272.92$2,989
Nov 2017275755.423.12$2,471
Oct 2017067349.292.98$2,008
Sep 2017387747.523.09$2,850
Aug 2017062545.373.00$1,878
Jul 2017084243.873.09$2,599
Jun 2017194542.493.09$2,960
May 201701,03045.373.26$3,361
Apr 201701,05847.933.21$3,398
Mar 201701,04246.772.98$3,109
Feb 2017087750.452.95$2,589
Jan 2017061749.413.42$2,109
Dec 2016080148.763.72$2,982
Nov 2016091942.492.64$2,430
Oct 2016099046.193.09$3,059
Sep 2016081141.553.10$2,515
Aug 2016095241.442.92$2,784
Jul 201601,09941.622.92$3,214
Jun 201601,06845.352.69$2,868
May 201601,09142.521.99$2,172
Apr 201631,12736.561.99$2,354
Mar 201601,15533.011.79$2,072
Feb 201601,10826.472.06$2,287
Jan 2016096527.352.36$2,282
Dec 201501,00432.362.00$2,009
Nov 201501,13538.792.17$2,460
Oct 201511,20643.552.43$2,970
Sep 201501,16242.992.76$3,205
Aug 201501,16240.162.87$3,338
Jul 201501,30548.152.95$3,843
Jun 201501,00656.152.88$2,900
May 201501,19455.212.96$3,529
Apr 201501,23549.822.71$3,343
Mar 201501,21342.892.93$3,560
Feb 201501,25944.662.98$3,747
Jan 201501,37443.433.10$4,260
Dec 2014059754.693.59$2,144
Nov 2014052270.464.25$2,219
Oct 2014081978.303.90$3,195
Sep 2014070086.164.05$2,832
Aug 201401,06089.394.04$4,277
Jul 201401,17296.564.18$4,898
Jun 201401,25198.164.74$5,926
May 201401,25794.734.73$5,941
Apr 201401,29195.944.81$6,209
Mar 201401,30795.895.06$6,609
Feb 201401,20097.406.19$7,430
Jan 201401,13890.404.86$5,532
Dec 201301,28691.824.35$5,600
Nov 201301,10588.853.74$4,131
Oct 201301,36897.423.78$5,170
Sep 201301,327104.113.72$4,933
Aug 201301,283104.253.52$4,520
Jul 201301,394102.523.72$5,183
Jun 201301,35494.403.93$5,326
May 201301,19994.834.15$4,975
Apr 201301,35293.964.28$5,790
Mar 201301,41293.623.91$5,525
Feb 201301,28491.233.42$4,391
Jan 201301,41391.603.42$4,832
Dec 201201,43586.773.42$4,908
Nov 201201,43586.953.62$5,202
Oct 201201,51089.383.40$5,134
Sep 201201,36894.672.92$3,992
Aug 201201,43892.662.91$4,182
Jul 201201,49585.133.02$4,516
Jun 201201,44579.822.52$3,640
May 201201,56191.612.49$3,884
Apr 201201,524101.652.00$3,043
Mar 201201,606105.052.22$3,569
Feb 201201,234101.102.57$3,172
Jan 201201,66698.092.73$4,555
Dec 201101,31296.873.24$4,251
Nov 201101,61495.723.31$5,344
Oct 2011092884.983.65$3,386
Sep 2011068783.623.99$2,738
Aug 201101,38983.404.15$5,763
Jul 201101,61494.144.52$7,291
Jun 201131,67892.904.64$8,064
May 201101,83798.134.40$8,092
Apr 201111,770105.964.33$7,776
Mar 201111,80896.364.06$7,432
Feb 2011087985.644.18$3,674
Jan 201101,84686.504.59$8,471
Dec 201011,79585.734.35$7,890
Nov 201001,82680.843.80$6,930
Oct 201021,93378.103.51$6,939
Sep 201011,89472.633.98$7,610
Aug 201011,85973.684.42$8,289
Jul 201002,02072.554.74$9,568
Jun 201001,48970.364.91$7,312
May 201012,00471.124.24$8,559
Apr 201002,11781.694.12$8,728
Mar 201002,22878.394.39$9,778
Feb 201011,55373.585.44$8,526
Jan 201001,65374.365.96$9,859
Dec 200912,05471.445.48$11,335
Nov 200902,29474.593.75$8,606
Oct 200901,20572.544.11$4,953
Sep 200901,93865.543.06$5,939
Aug 200912,32367.423.22$7,544
Jul 200901,57561.133.46$5,457
Jun 200902,22866.163.90$8,678
May 200912,18154.743.93$8,617
Apr 200902,54246.773.59$9,119
Mar 200902,68942.144.06$10,915
Feb 200922,67432.814.63$12,454
Jan 200902,83135.865.37$15,205
Dec 200802,67037.105.98$15,959
Nov 200802,50055.496.86$17,151
Oct 200802,97175.246.92$20,565
Sep 200801,483101.767.88$11,682
Aug 200803,160114.228.48$26,806
Jul 200803,217131.0811.39$36,640
Jun 200803,117131.3313.03$40,623
May 200802,690123.1711.57$31,135
Apr 200803,456110.3110.45$36,132
Mar 200803,643101.909.66$35,206
Feb 200803,59392.538.77$31,513
Jan 200803,83290.388.21$31,444
Dec 200703,96688.337.30$28,960
Nov 200703,96891.677.29$28,933
Oct 200704,31582.856.92$29,868
Sep 200704,45075.846.24$27,787
Aug 200704,93469.066.39$31,518
Jul 200705,15870.906.39$32,949
Jun 200705,23962.007.55$39,546
May 200705,76358.747.85$45,218
Apr 200706,00359.617.81$46,855
Mar 200706,77756.927.30$49,485
Feb 200706,82655.108.22$56,082
Jan 200708,14150.306.73$54,763
Dec 200608,39756.656.92$58,094
Nov 200609,47854.207.62$72,198
Oct 2006011,62554.906.01$69,910
Sep 2006214,43060.085.04$72,807
Aug 200601,05968.717.34$7,773

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $ 98.93 =         $0
Gas                    7 Mcf  × $  2.87 =        $20

────────────────────────────────────────────────────
Month total                                      $20

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/221050 is the state's own key, not one this site invented.