Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 220709District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$960 k
May 2006 – May 2026
Value, last 12 filed months
$3 k
at the published price for each month
Months reported
241
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-11-20170199
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition648 bbl$48,507
GasProduction150,280 Mcf$911,496
Total$960,002

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4537, -100.7408. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.45371, -100.74078 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,145 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,145 ft.

Completions filed
May 2006
1 of 1 wells

1 well

42-43537724107,145 ftMay 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (241)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

241 months

May 202600106.413.05$0
Apr 202601098.932.87$29
Mar 202607289.753.15$227
Feb 202606663.503.75$248
Jan 202606859.138.00$544
Dec 202507156.664.41$313
Nov 202505858.593.93$228
Oct 202506359.383.30$208
Sep 202506962.743.08$212
Aug 202507363.933.01$220
Jul 202507266.743.32$239
Jun 202506466.483.13$200
May 202507560.553.23$242
Apr 202507462.363.54$262
Mar 202507767.704.27$329
Feb 202506870.884.34$295
Jan 202507574.324.28$321
Dec 202407668.993.12$237
Nov 202407369.052.20$160
Oct 202407671.372.28$173
Sep 202407769.612.36$182
Aug 202408075.632.06$165
Jul 202408379.932.15$178
Jun 202407478.082.63$195
May 202407178.812.20$156
Apr 202407284.451.66$119
Mar 202407080.301.55$108
Feb 202406376.091.78$112
Jan 202407673.023.30$251
Dec 202307571.262.61$196
Nov 202308077.892.81$225
Oct 202307485.443.09$228
Sep 202306089.042.74$164
Aug 202307280.522.67$192
Jul 202306774.852.64$177
Jun 202307468.962.26$167
May 202307670.622.23$169
Apr 202307878.122.24$175
Mar 202308072.852.39$191
Feb 202307475.112.47$182
Jan 202308276.533.39$278
Dec 202207976.415.73$453
Nov 202208285.005.65$463
Oct 202208387.185.86$487
Sep 202207784.888.16$629
Aug 202206894.529.13$621
Jul 2022083101.587.54$626
Jun 2022086115.097.98$686
May 2022087109.378.43$734
Apr 2022082104.226.84$561
Mar 2022082108.885.08$416
Feb 202204591.054.86$219
Jan 202205581.844.54$250
Dec 202109871.323.90$382
Nov 202109477.435.24$492
Oct 202109879.795.71$560
Sep 202109469.865.35$503
Aug 202109966.024.22$418
Jul 202109970.783.98$394
Jun 2021010369.493.38$348
May 202109663.483.02$290
Apr 2021010960.362.76$301
Mar 2021011261.302.72$304
Feb 2021019557.805.55$1,082
Jan 2021078450.412.81$2,203
Dec 2020013844.642.68$369
Nov 2020012938.772.71$349
Oct 2020014736.972.48$364
Sep 2020014537.091.99$289
Aug 2020018839.982.39$448
Jul 2020018238.371.83$332
Jun 20200534.901.69$8
May 20200316.921.81$5
Apr 20200714.751.80$13
Mar 20200230.341.86$4
Feb 20200349.881.98$6
Jan 20200957.252.09$19
Dec 201901859.012.30$41
Nov 201901055.302.75$28
Oct 201904553.472.42$109
Sep 20190155.052.66$3
Aug 20190153.112.30$2
Jul 20190156.272.46$2
Jun 20190252.782.49$5
May 20190558.482.74$14
Apr 201905762.632.75$157
Mar 201901056.803.06$31
Feb 20190250.852.79$6
Jan 20190346.033.23$10
Dec 201801846.594.19$75
Nov 2018017452.934.24$737
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180163.842.90$3
Mar 20180461.222.79$11
Feb 201801761.782.77$47
Jan 201808662.874.01$345
Dec 201708557.272.92$248
Nov 2017010955.423.12$340
Oct 201704349.292.98$128
Sep 20170147.523.09$3
Aug 20170445.373.00$12
Jul 20170643.873.09$19
Jun 20170342.493.09$9
May 20170345.373.26$10
Apr 2017013347.933.21$427
Mar 2017016746.772.98$498
Feb 2017015550.452.95$458
Jan 2017017149.413.42$585
Dec 2016016848.763.72$625
Nov 2016015442.492.64$407
Oct 2016018346.193.09$566
Sep 2016017541.553.10$543
Aug 2016018441.442.92$538
Jul 2016019841.622.92$579
Jun 2016020245.352.69$543
May 2016022842.521.99$454
Apr 2016025736.561.99$512
Mar 2016027833.011.79$499
Feb 2016025526.472.06$526
Jan 2016027627.352.36$653
Dec 201501132.362.00$22
Nov 20150238.792.17$4
Oct 20150243.552.43$5
Sep 20150242.992.76$6
Aug 20150240.162.87$6
Jul 20150348.152.95$9
Jun 20150256.152.88$6
May 20150355.212.96$9
Apr 20150249.822.71$5
Mar 20150642.892.93$18
Feb 20150344.662.98$9
Jan 20150343.433.10$9
Dec 20140054.693.59$0
Nov 20140270.464.25$9
Oct 20140578.303.90$20
Sep 20140086.164.05$0
Aug 20140389.394.04$12
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 2014110094.734.73$567
Apr 2014112895.944.81$712
Mar 2014211895.895.06$788
Feb 2014337297.406.19$2,596
Jan 2014341790.404.86$2,298
Dec 2013242691.824.35$2,039
Nov 2013343188.853.74$1,878
Oct 2013347097.423.78$2,069
Sep 20132475104.113.72$1,974
Aug 20133522104.253.52$2,152
Jul 20131547102.523.72$2,136
Jun 2013317294.403.93$960
May 2013248794.834.15$2,210
Apr 2013447793.964.28$2,419
Mar 2013249193.623.91$2,108
Feb 2013345191.233.42$1,816
Jan 2013450591.603.42$2,093
Dec 2012351186.773.42$2,008
Nov 2012449986.953.62$2,157
Oct 2012253089.383.40$1,981
Sep 2012351294.672.92$1,778
Aug 2012153492.662.91$1,646
Jul 2012353185.133.02$1,859
Jun 2012354279.822.52$1,605
May 2012257191.612.49$1,604
Apr 20124576101.652.00$1,557
Mar 20124604105.052.22$1,762
Feb 20123582101.102.57$1,799
Jan 2012362898.092.73$2,011
Dec 2011460996.873.24$2,360
Nov 2011461895.723.31$2,429
Oct 2011365784.983.65$2,652
Sep 2011263383.623.99$2,690
Aug 2011460583.404.15$2,844
Jul 2011466494.144.52$3,376
Jun 2011467292.904.64$3,490
May 2011470098.134.40$3,476
Apr 20115696105.964.33$3,546
Mar 2011579096.364.06$3,687
Feb 2011341885.644.18$2,004
Jan 2011582786.504.59$4,227
Dec 2010437485.734.35$1,969
Nov 2010354680.843.80$2,315
Oct 2010350978.103.51$2,020
Sep 2010468272.633.98$3,005
Aug 2010469273.684.42$3,353
Jul 2010475472.554.74$3,862
Jun 2010360770.364.91$3,192
May 2010689671.124.24$4,221
Apr 2010675781.694.12$3,611
Mar 2010581578.394.39$3,969
Feb 2010470073.585.44$4,104
Jan 2010681574.365.96$5,307
Dec 2009587971.445.48$5,177
Nov 2009686774.593.75$3,700
Oct 2009475872.544.11$3,406
Sep 2009385865.543.06$2,826
Aug 2009597067.423.22$3,459
Jul 2009698261.133.46$3,769
Jun 200941,10966.163.90$4,584
May 200981,24154.743.93$5,310
Apr 2009781546.773.59$3,251
Mar 200981,24242.144.06$5,378
Feb 200951,16432.814.63$5,557
Jan 200981,27335.865.37$7,124
Dec 200891,26637.105.98$7,901
Nov 200881,36255.496.86$9,788
Oct 2008101,48975.246.92$11,059
Sep 200871,214101.767.88$10,275
Aug 200871,537114.228.48$13,838
Jul 200861,568131.0811.39$18,645
Jun 200881,616131.3313.03$22,111
May 2008111,776123.1711.57$21,911
Apr 200881,810110.3110.45$19,806
Mar 200871,862101.909.66$18,708
Feb 200871,40292.538.77$12,944
Jan 2008171,94490.388.21$17,488
Dec 200792,07388.337.30$15,932
Nov 2007152,17591.677.29$17,235
Oct 200772,02182.856.92$14,569
Sep 200771,57775.846.24$10,378
Aug 200771,94969.066.39$12,934
Jul 2007161,89270.906.39$13,220
Jun 200762,17862.007.55$16,813
May 2007162,71058.747.85$22,203
Apr 2007153,15159.617.81$25,488
Mar 2007143,29956.927.30$24,886
Feb 2007173,52555.108.22$29,898
Jan 2007174,21750.306.73$29,222
Dec 2006214,53256.656.92$32,544
Nov 2006154,29154.207.62$33,500
Oct 2006275,62054.906.01$35,280
Sep 2006166,51660.085.04$33,784
Aug 2006157,60368.717.34$56,836
Jul 2006297,53369.376.34$49,792
Jun 2006219,24066.286.38$60,379
May 200683,29966.016.42$21,724

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $ 98.93 =         $0
Gas                   10 Mcf  × $  2.87 =        $29

────────────────────────────────────────────────────
Month total                                      $29

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/220709 is the state's own key, not one this site invented.