SHURLEY 165

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 230187District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$325 k
Nov 2006 – May 2026
Value, last 12 filed months
$947
at the published price for each month
Months reported
235
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-01-22175993
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition297 bbl$24,464
GasProduction54,647 Mcf$300,329
Total$324,793

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4557, -100.7386. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.45574, -100.73862 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,175 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,175 ft.

Completions filed
Nov 2006
1 of 1 wells

1 well

42-43537723137,175 ftNov 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (235)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

235 months

May 202600106.413.05$0
Apr 20260598.932.87$14
Mar 202602789.753.15$85
Feb 202602163.503.75$79
Jan 202602359.138.00$184
Dec 202501656.664.41$71
Nov 202502358.593.93$90
Oct 202502659.383.30$86
Sep 202502762.743.08$83
Aug 202502763.933.01$81
Jul 202502766.743.32$90
Jun 202502766.483.13$84
May 202503160.553.23$100
Apr 202502962.363.54$103
Mar 202502767.704.27$115
Feb 202502470.884.34$104
Jan 202503074.324.28$128
Dec 202402668.993.12$81
Nov 202402369.052.20$51
Oct 202401071.372.28$23
Sep 20240169.612.36$2
Aug 20240075.632.06$0
Jul 202401879.932.15$39
Jun 202402578.082.63$66
May 202402778.812.20$59
Apr 202402784.451.66$45
Mar 202402780.301.55$42
Feb 202402576.091.78$45
Jan 202403073.023.30$99
Dec 202303171.262.61$81
Nov 202302877.892.81$79
Oct 20230985.443.09$28
Sep 20230089.042.74$0
Aug 20230580.522.67$13
Jul 202302274.852.64$58
Jun 202303168.962.26$70
May 202303070.622.23$67
Apr 202303078.122.24$67
Mar 202303072.852.39$72
Feb 202302875.112.47$69
Jan 202303176.533.39$105
Dec 202203276.415.73$183
Nov 202203185.005.65$175
Oct 202202787.185.86$158
Sep 202201084.888.16$82
Aug 202201094.529.13$91
Jul 2022029101.587.54$219
Jun 2022032115.097.98$255
May 2022028109.378.43$236
Apr 2022028104.226.84$191
Mar 2022030108.885.08$152
Feb 202202991.054.86$141
Jan 202203381.844.54$150
Dec 202103171.323.90$121
Nov 202103177.435.24$162
Oct 202103379.795.71$189
Sep 202102969.865.35$155
Aug 202103066.024.22$127
Jul 202103170.783.98$123
Jun 202103169.493.38$105
May 202102863.483.02$84
Apr 202103160.362.76$86
Mar 202106961.302.72$187
Feb 202102357.805.55$128
Jan 202103250.412.81$90
Dec 202003444.642.68$91
Nov 202003438.772.71$92
Oct 202003836.972.48$94
Sep 202003237.091.99$64
Aug 202002839.982.39$67
Jul 202003238.371.83$58
Jun 202002634.901.69$44
May 202002916.921.81$53
Apr 202003114.751.80$56
Mar 202004230.341.86$78
Feb 202003049.881.98$59
Jan 202003457.252.09$71
Dec 201903659.012.30$83
Nov 201903555.302.75$96
Oct 201903453.472.42$82
Sep 201903555.052.66$93
Aug 201904253.112.30$97
Jul 201904456.272.46$108
Jun 201904652.782.49$115
May 201904558.482.74$123
Apr 201904062.632.75$110
Mar 201902956.803.06$89
Feb 201901550.852.79$42
Jan 201901546.033.23$48
Dec 201801646.594.19$67
Nov 2018010852.934.24$458
Oct 201802461.443.40$82
Sep 201802459.543.11$75
Aug 2018012459.403.07$380
Jul 2018013265.142.93$387
Jun 201802960.183.08$89
May 201802665.382.90$75
Apr 201802663.842.90$75
Mar 201802661.222.79$72
Feb 201802961.782.77$80
Jan 201804462.874.01$176
Dec 201703757.272.92$108
Nov 201704355.423.12$134
Oct 201705949.292.98$176
Sep 201705947.523.09$182
Aug 201706145.373.00$183
Jul 201706843.873.09$210
Jun 201706842.493.09$210
May 201705945.373.26$193
Apr 201705447.933.21$173
Mar 201706446.772.98$191
Feb 201705150.452.95$151
Jan 201706049.413.42$205
Dec 2016010248.763.72$380
Nov 201605642.492.64$148
Oct 201606446.193.09$198
Sep 201606441.553.10$198
Aug 201616741.442.92$237
Jul 2016016841.622.92$491
Jun 201606545.352.69$175
May 201606442.521.99$127
Apr 201616736.561.99$170
Mar 201617033.011.79$159
Feb 201616926.472.06$169
Jan 201617627.352.36$207
Dec 201517732.362.00$186
Nov 201508438.792.17$182
Oct 201518043.552.43$238
Sep 201518042.992.76$264
Aug 2015112940.162.87$411
Jul 2015111948.152.95$399
Jun 2015012956.152.88$372
May 201518955.212.96$318
Apr 2015113549.822.71$415
Mar 2015115242.892.93$489
Feb 2015115444.662.98$503
Jan 2015117443.433.10$583
Dec 2014119354.693.59$748
Nov 2014115270.464.25$717
Oct 2014121778.303.90$925
Sep 2014125186.164.05$1,102
Aug 2014124089.394.04$1,058
Jul 2014025196.564.18$1,049
Jun 2014128498.164.74$1,443
May 2014126694.734.73$1,352
Apr 2014230395.944.81$1,649
Mar 2014124295.895.06$1,320
Feb 2014124997.406.19$1,639
Jan 2014125590.404.86$1,330
Dec 2013127391.824.35$1,281
Nov 2013230588.853.74$1,318
Oct 2013124397.423.78$1,016
Sep 20131192104.113.72$818
Aug 20131217104.253.52$869
Jul 20131266102.523.72$1,091
Jun 2013234694.403.93$1,550
May 2013240894.834.15$1,882
Apr 2013440793.964.28$2,119
Mar 2013247993.623.91$2,062
Feb 2013230691.233.42$1,229
Jan 2013440491.603.42$1,748
Dec 2012343486.773.42$1,745
Nov 2012343586.953.62$1,838
Oct 2012241489.383.40$1,586
Sep 2012242994.672.92$1,441
Aug 2012143892.662.91$1,366
Jul 2012245285.133.02$1,536
Jun 2012345279.822.52$1,378
May 2012158591.612.49$1,547
Apr 20122237101.652.00$677
Mar 20121214105.052.22$581
Feb 20121204101.102.57$625
Jan 2012234098.092.73$1,126
Dec 2011347296.873.24$1,820
Nov 2011344995.723.31$1,774
Oct 2011245384.983.65$1,823
Sep 2011245983.623.99$1,997
Aug 2011347383.404.15$2,213
Jul 2011347994.144.52$2,446
Jun 2011250392.904.64$2,520
May 2011235098.134.40$1,738
Apr 20113463105.964.33$2,324
Mar 2011452196.364.06$2,499
Feb 2011345485.644.18$2,155
Jan 2011565386.504.59$3,429
Dec 2010533485.734.35$1,881
Nov 2010551580.843.80$2,359
Oct 2010356978.103.51$2,231
Sep 2010554872.633.98$2,544
Aug 2010459273.684.42$2,911
Jul 2010350172.554.74$2,591
Jun 2010460870.364.91$3,267
May 2010667571.124.24$3,285
Apr 2010559381.694.12$2,853
Mar 2010983078.394.39$4,348
Feb 2010669773.585.44$4,235
Jan 2010434874.365.96$2,373
Dec 2009536871.445.48$2,375
Nov 2009574874.593.75$3,179
Oct 20090072.544.11$0
Sep 20091065.543.06$66
Aug 2009237367.423.22$1,335
Jul 2009341161.133.46$1,607
Jun 2009287066.163.90$3,521
May 2009348954.743.93$2,084
Apr 2009450246.773.59$1,988
Mar 2009475742.144.06$3,241
Feb 2009381032.814.63$3,851
Jan 2009572835.865.37$4,089
Dec 2008585837.105.98$5,314
Nov 2008596755.496.86$6,911
Oct 2008697875.246.92$7,221
Sep 200851,038101.767.88$8,685
Aug 200841,121114.228.48$9,966
Jul 200841,180131.0811.39$13,964
Jun 20087884131.3313.03$12,440
May 200861,104123.1711.57$13,517
Apr 200841,276110.3110.45$13,782
Mar 200861,359101.909.66$13,745
Feb 200861,45192.538.77$13,281
Jan 2008121,11590.388.21$10,234
Dec 2007141,35888.337.30$11,153
Nov 2007567591.677.29$5,380
Oct 200741,28382.856.92$9,212
Sep 20070075.846.24$0
Aug 20070069.066.39$0
Jul 20070070.906.39$0
Jun 200701,96962.007.55$14,863
May 20070058.747.85$0
Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060054.207.62$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $ 98.93 =         $0
Gas                    5 Mcf  × $  2.87 =        $14

────────────────────────────────────────────────────
Month total                                      $14

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/230187 is the state's own key, not one this site invented.