SHANNON 52

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 222297District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$611 k
May 2006 – May 2026
Value, last 12 filed months
$4 k
at the published price for each month
Months reported
241
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-03-22173480
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition59 bbl$4,315
GasProduction98,538 Mcf$606,650
Total$610,965

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6719, -100.7826. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.67190, -100.78263 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,023 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,023 ft.

Completions filed
May 2006
1 of 1 wells

1 well

42-43537889178,023 ftMay 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (241)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

241 months

May 2026088106.413.05$268
Apr 202606898.932.87$195
Mar 202608089.753.15$252
Feb 202607563.503.75$281
Jan 202607959.138.00$632
Dec 202507956.664.41$349
Nov 202508158.593.93$318
Oct 202507659.383.30$251
Sep 202508962.743.08$274
Aug 202507563.933.01$226
Jul 202508466.743.32$278
Jun 202508266.483.13$257
May 202508060.553.23$259
Apr 202507962.363.54$280
Mar 202507967.704.27$337
Feb 202507470.884.34$321
Jan 202508174.324.28$347
Dec 202408368.993.12$259
Nov 202408169.052.20$178
Oct 202408771.372.28$198
Sep 202408469.612.36$199
Aug 202408975.632.06$184
Jul 202408779.932.15$187
Jun 202408678.082.63$227
May 202409478.812.20$207
Apr 202408984.451.66$148
Mar 202409280.301.55$142
Feb 202408876.091.78$157
Jan 202409273.023.30$303
Dec 202309371.262.61$243
Nov 202309177.892.81$255
Oct 202309285.443.09$284
Sep 202309089.042.74$246
Aug 202309380.522.67$249
Jul 202309374.852.64$246
Jun 202309268.962.26$208
May 202309470.622.23$209
Apr 202309078.122.24$201
Mar 202309572.852.39$227
Feb 202308475.112.47$207
Jan 202309676.533.39$325
Dec 202209776.415.73$556
Nov 202209585.005.65$536
Oct 202209987.185.86$581
Sep 202209984.888.16$808
Aug 2022010294.529.13$931
Jul 20220104101.587.54$784
Jun 20220101115.097.98$806
May 20220105109.378.43$885
Apr 20220106104.226.84$725
Mar 20220116108.885.08$589
Feb 2022012591.054.86$607
Jan 2022021381.844.54$967
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210579.795.71$29
Sep 2021012969.865.35$690
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 202105463.483.02$163
Apr 202105660.362.76$154
Mar 202105961.302.72$160
Feb 202105557.805.55$305
Jan 202105250.412.81$146
Dec 202004944.642.68$131
Nov 202005138.772.71$138
Oct 202005636.972.48$139
Sep 202005537.091.99$110
Aug 202006039.982.39$143
Jul 202006238.371.83$113
Jun 202005934.901.69$100
May 202006216.921.81$113
Apr 202006314.751.80$114
Mar 202015830.341.86$138
Feb 202005149.881.98$101
Jan 202015257.252.09$166
Dec 201905359.012.30$122
Nov 201905355.302.75$146
Oct 201906153.472.42$148
Sep 201907155.052.66$189
Aug 201907153.112.30$164
Jul 201906856.272.46$167
Jun 201906652.782.49$164
May 201907258.482.74$197
Apr 2019011162.632.75$305
Mar 2019011856.803.06$361
Feb 2019010650.852.79$296
Jan 2019011446.033.23$368
Dec 2018011346.594.19$473
Nov 2018010752.934.24$453
Oct 2018011961.443.40$404
Sep 2018011659.543.11$361
Aug 2018012159.403.07$371
Jul 2018012265.142.93$358
Jun 2018011760.183.08$360
May 2018013465.382.90$389
Apr 2018011163.842.90$322
Mar 2018011761.222.79$326
Feb 2018010161.782.77$279
Jan 2018011162.874.01$445
Dec 2017011257.272.92$327
Nov 2017011255.423.12$349
Oct 2017011849.292.98$352
Sep 2017012247.523.09$377
Aug 2017012545.373.00$376
Jul 2017013143.873.09$404
Jun 2017011642.493.09$358
May 2017011845.373.26$385
Apr 2017014247.933.21$456
Mar 2017012246.772.98$364
Feb 2017010650.452.95$313
Jan 2017012049.413.42$410
Dec 2016011748.763.72$436
Nov 2016011942.492.64$315
Oct 2016012346.193.09$380
Sep 2016011941.553.10$369
Aug 2016012441.442.92$363
Jul 2016012641.622.92$368
Jun 2016012445.352.69$333
May 2016012842.521.99$255
Apr 2016014136.561.99$281
Mar 2016012933.011.79$231
Feb 2016011826.472.06$244
Jan 2016012327.352.36$291
Dec 2015012032.362.00$240
Nov 2015011838.792.17$256
Oct 2015013243.552.43$320
Sep 2015012242.992.76$337
Aug 2015012540.162.87$359
Jul 2015011248.152.95$330
Jun 2015011256.152.88$323
May 2015012455.212.96$366
Apr 2015012549.822.71$338
Mar 2015013542.892.93$396
Feb 2015012644.662.98$375
Jan 2015013343.433.10$412
Dec 2014013454.693.59$481
Nov 2014013270.464.25$561
Oct 2014014278.303.90$554
Sep 2014013386.164.05$538
Aug 2014013789.394.04$553
Jul 2014013996.564.18$581
Jun 2014013998.164.74$658
May 2014013994.734.73$657
Apr 2014013995.944.81$668
Mar 2014014295.895.06$718
Feb 2014013397.406.19$824
Jan 2014015090.404.86$729
Dec 2013015291.824.35$662
Nov 2013015388.853.74$572
Oct 2013013197.423.78$495
Sep 20130147104.113.72$547
Aug 2013068104.253.52$240
Jul 201304102.523.72$15
Jun 20130194.403.93$4
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 201301691.233.42$55
Jan 201304991.603.42$168
Dec 2012013986.773.42$475
Nov 2012013686.953.62$493
Oct 2012014389.383.40$486
Sep 2012013394.672.92$388
Aug 201203492.662.91$99
Jul 201208785.133.02$263
Jun 2012017579.822.52$441
May 20120091.612.49$0
Apr 201205101.652.00$10
Mar 201201105.052.22$2
Feb 201200101.102.57$0
Jan 20120098.092.73$0
Dec 20112296.873.24$200
Nov 20110495.723.31$13
Oct 20110084.983.65$0
Sep 2011016583.623.99$658
Aug 2011030383.404.15$1,257
Jul 2011025794.144.52$1,161
Jun 2011021092.904.64$974
May 2011014898.134.40$652
Apr 201103105.964.33$13
Mar 20110496.364.06$16
Feb 2011018285.644.18$761
Jan 2011140886.504.59$1,959
Dec 2010134985.734.35$1,603
Nov 2010042280.843.80$1,602
Oct 2010144378.103.51$1,633
Sep 2010111172.633.98$514
Aug 2010038473.684.42$1,697
Jul 2010165272.554.74$3,161
Jun 2010167170.364.91$3,365
May 2010173471.124.24$3,180
Apr 2010374981.694.12$3,333
Mar 2010262078.394.39$2,878
Feb 2010165573.585.44$3,638
Jan 2010179274.365.96$4,798
Dec 2009280271.445.48$4,541
Nov 2009130774.593.75$1,226
Oct 2009158472.544.11$2,473
Sep 2009156865.543.06$1,806
Aug 2009181267.423.22$2,681
Jul 2009196961.133.46$3,418
Jun 2009198066.163.90$3,883
May 200921,09754.743.93$4,416
Apr 200921,00046.773.59$3,681
Mar 200921,13942.144.06$4,707
Feb 200921,02932.814.63$4,833
Jan 200911,12835.865.37$6,094
Dec 200831,14637.105.98$6,961
Nov 200821,15655.496.86$8,042
Oct 200821,30075.246.92$9,149
Sep 20081856101.767.88$6,845
Aug 200821,252114.228.48$10,849
Jul 200811,267131.0811.39$14,561
Jun 200821,227131.3313.03$16,254
May 200811,351123.1711.57$15,760
Apr 200831,502110.3110.45$16,034
Mar 200811,517101.909.66$14,762
Feb 200801,39592.538.77$12,235
Jan 200801,64690.388.21$13,507
Dec 200701,27288.337.30$9,288
Nov 200701,70991.677.29$12,462
Oct 200701,84382.856.92$12,757
Sep 200701,82475.846.24$11,389
Aug 200702,32969.066.39$14,878
Jul 200701,90270.906.39$12,150
Jun 200701,92662.007.55$14,538
May 200732,07358.747.85$16,442
Apr 200732,14459.617.81$16,913
Mar 200702,17656.927.30$15,889
Feb 200701,43155.108.22$11,757
Jan 200701,83850.306.73$12,364
Dec 200601,89456.656.92$13,104
Nov 200602,18354.207.62$16,629
Oct 200602,36454.906.01$14,217
Sep 200602,51360.085.04$12,658
Aug 200603,43268.717.34$25,191
Jul 200604,21469.376.34$26,728
Jun 200605,06366.286.38$32,322
May 200604,15166.016.42$26,670

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   88 Mcf  × $  3.05 =       $268

────────────────────────────────────────────────────
Month total                                     $268

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/222297 is the state's own key, not one this site invented.