BROWN SE "220"

Operated by BRP ENERGY, LLC (P-5 41519) in the GEASLIN (WOLFCAMP) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 223270District 7CField 34300700CondensateGasSaveExport
Value, all time
$2.9 M
Nov 2006 – May 2026
Value, last 12 filed months
$4 k
at the published price for each month
Months reported
235
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 169 leases and 169 wells, and the rule below applies to all of them.

Discovered
1995-05-19
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2001-07-24.

The Commission's schedule remark for this field reads: 8000FT AS SHOWN ON THE LOG OF THE GEASLIN 198 LEASE, WELL NO. 1.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition152 bbl$10,934
GasProduction583,173 Mcf$2,903,706
Total$2,914,641

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.3612, -101.8382. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.36122, -101.83816 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,212 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,212 ft.

Completions filed
Nov 2006
1 of 1 wells

1 well

42-44331188537,212 ftNov 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (235)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

235 months

May 202600106.413.05$0
Apr 202601398.932.87$37
Mar 20261089.753.15$90
Feb 202601863.503.75$68
Jan 2026017059.138.00$1,360
Dec 2025017356.664.41$764
Nov 2025016758.593.93$656
Oct 2025117559.383.30$638
Sep 2025017262.743.08$529
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 2024050878.812.20$1,117
Apr 20240084.451.66$0
Mar 2024015080.301.55$232
Feb 202471,01476.091.78$2,341
Jan 202452,18473.023.30$7,567
Dec 202351,97371.262.61$5,507
Nov 202362,24077.892.81$6,756
Oct 202352,28285.443.09$7,472
Sep 202321,44489.042.74$4,127
Aug 20230080.522.67$0
Jul 2023159174.852.64$1,636
Jun 2023069168.962.26$1,561
May 2023084770.622.23$1,887
Apr 202302778.122.24$60
Mar 202331,17472.852.39$3,028
Feb 2023047575.112.47$1,171
Jan 2023071676.533.39$2,426
Dec 2022315176.415.73$1,094
Nov 2022022185.005.65$1,248
Oct 202221,38687.185.86$8,302
Sep 202241,60984.888.16$13,475
Aug 202231,43694.529.13$13,390
Jul 202201,591101.587.54$11,999
Jun 202241,601115.097.98$13,232
May 202231,732109.378.43$14,934
Apr 202231,574104.226.84$11,075
Mar 202231,657108.885.08$8,738
Feb 202231,44091.054.86$7,270
Jan 202271,79781.844.54$8,727
Dec 202131,68271.323.90$6,772
Nov 202181,62877.435.24$9,145
Oct 202101,53379.795.71$8,759
Sep 202101,57369.865.35$8,417
Aug 202101,59066.024.22$6,711
Jul 202101,51570.783.98$6,033
Jun 202161,45169.493.38$5,322
May 202161,65763.483.02$5,381
Apr 202101,45060.362.76$4,000
Mar 202101,98661.302.72$5,396
Feb 202131,76357.805.55$9,954
Jan 202101,17750.412.81$3,308
Dec 202001,23544.642.68$3,304
Nov 202001,73938.772.71$4,707
Oct 202011,79736.972.48$4,491
Sep 202001,76537.091.99$3,514
Aug 202011,89639.982.39$4,562
Jul 202001,87638.371.83$3,424
Jun 202031,83534.901.69$3,206
May 202001,89016.921.81$3,430
Apr 202001,86414.751.80$3,363
Mar 202001,98430.341.86$3,683
Feb 202031,52249.881.98$3,164
Jan 202001,53757.252.09$3,220
Dec 201932,08259.012.30$4,975
Nov 2019091455.302.75$2,514
Oct 201901,78653.472.42$4,320
Sep 201901,69055.052.66$4,491
Aug 201901,80653.112.30$4,162
Jul 201901,77556.272.46$4,367
Jun 201901,63952.782.49$4,083
May 201941,78058.482.74$5,112
Apr 201901,66162.632.75$4,569
Mar 201901,81556.803.06$5,558
Feb 201921,69850.852.79$4,843
Jan 201901,71946.033.23$5,549
Dec 201821,85146.594.19$7,840
Nov 201801,79952.934.24$7,623
Oct 201811,85561.443.40$6,365
Sep 201801,78459.543.11$5,545
Aug 201811,89659.403.07$5,874
Jul 201801,97365.142.93$5,785
Jun 201801,77760.183.08$5,468
May 201821,95665.382.90$5,805
Apr 201801,88163.842.90$5,456
Mar 201811,96861.222.79$5,546
Feb 201801,77561.782.77$4,910
Jan 201821,94762.874.01$7,932
Dec 201701,95957.272.92$5,723
Nov 201722,10055.423.12$6,659
Oct 201701,60949.292.98$4,801
Sep 201731,91347.523.09$6,049
Aug 201702,03445.373.00$6,111
Jul 201722,04243.873.09$6,392
Jun 201701,99342.493.09$6,153
May 201702,01645.373.26$6,579
Apr 201701,94447.933.21$6,243
Mar 201702,02546.772.98$6,042
Feb 201701,81750.452.95$5,365
Jan 201701,99649.413.42$6,824
Dec 201602,19148.763.72$8,157
Nov 201601,95942.492.64$5,180
Oct 201602,08546.193.09$6,443
Sep 201602,02841.553.10$6,288
Aug 201601,91241.442.92$5,591
Jul 201602,07641.622.92$6,071
Jun 201602,00645.352.69$5,388
May 201602,06242.521.99$4,106
Apr 201632,07236.561.99$4,235
Mar 201602,14433.011.79$3,846
Feb 201602,01326.472.06$4,154
Jan 201622,13927.352.36$5,112
Dec 201502,10532.362.00$4,213
Nov 201502,08738.792.17$4,523
Oct 201502,18843.552.43$5,309
Sep 201502,14142.992.76$5,906
Aug 201502,14640.162.87$6,164
Jul 201512,24848.152.95$6,669
Jun 201501,95856.152.88$5,645
May 201502,18155.212.96$6,446
Apr 201502,12949.822.71$5,762
Mar 201502,15842.892.93$6,333
Feb 201501,98944.662.98$5,920
Jan 201502,10243.433.10$6,518
Dec 201402,19054.693.59$7,865
Nov 201402,18770.464.25$9,299
Oct 201402,37778.303.90$9,273
Sep 201402,00486.164.05$8,107
Aug 201402,13889.394.04$8,627
Jul 201402,20096.564.18$9,195
Jun 201402,24598.164.74$10,634
May 201402,31894.734.73$10,956
Apr 201402,28395.944.81$10,979
Mar 201402,32495.895.06$11,752
Feb 201402,14897.406.19$13,300
Jan 201402,16690.404.86$10,528
Dec 201302,36291.824.35$10,285
Nov 201302,35088.853.74$8,785
Oct 201302,49797.423.78$9,437
Sep 201302,454104.113.72$9,123
Aug 201302,222104.253.52$7,827
Jul 201302,444102.523.72$9,086
Jun 201302,39894.403.93$9,432
May 201302,43194.834.15$10,086
Apr 201302,45393.964.28$10,505
Mar 201302,45393.623.91$9,598
Feb 201302,31891.233.42$7,927
Jan 201302,55991.603.42$8,752
Dec 201202,48686.773.42$8,503
Nov 201202,54586.953.62$9,226
Oct 201202,67989.383.40$9,108
Sep 201202,63494.672.92$7,687
Aug 201202,28292.662.91$6,636
Jul 201202,64985.133.02$8,002
Jun 201202,55579.822.52$6,436
May 201202,60691.612.49$6,485
Apr 201202,587101.652.00$5,166
Mar 201202,704105.052.22$6,009
Feb 201202,576101.102.57$6,621
Jan 201202,82098.092.73$7,710
Dec 201102,80196.873.24$9,075
Nov 201112,79895.723.31$9,361
Oct 201112,29084.983.65$8,440
Sep 201102,30683.623.99$9,191
Aug 201102,92283.404.15$12,124
Jul 201102,88094.144.52$13,010
Jun 201102,91092.904.64$13,502
May 201102,87898.134.40$12,677
Apr 201102,907105.964.33$12,597
Mar 201103,01796.364.06$12,241
Feb 201112,74485.644.18$11,556
Jan 201103,06286.504.59$14,051
Dec 201003,08585.734.35$13,413
Nov 201013,02180.843.80$11,547
Oct 201023,18878.103.51$11,343
Sep 201013,17272.633.98$12,696
Aug 201013,34373.684.42$14,848
Jul 201003,17672.554.74$15,043
Jun 201013,23670.364.91$15,960
May 201013,09371.124.24$13,171
Apr 201003,25181.694.12$13,403
Mar 201003,41078.394.39$14,965
Feb 201013,09473.585.44$16,912
Jan 201003,51374.365.96$20,952
Dec 200903,09871.445.48$16,989
Nov 200903,42474.593.75$12,845
Oct 200903,66872.544.11$15,076
Sep 200903,57465.543.06$10,953
Aug 200913,87667.423.22$12,542
Jul 200913,81861.133.46$13,289
Jun 200903,67766.163.90$14,322
May 200913,96354.743.93$15,612
Apr 200913,95546.773.59$14,235
Mar 200904,17142.144.06$16,930
Feb 200903,93632.814.63$18,235
Jan 200914,24935.865.37$22,857
Dec 200804,44337.105.98$26,556
Nov 200804,16855.496.86$28,594
Oct 200804,90375.246.92$33,938
Sep 200803,014101.767.88$23,742
Aug 200804,791114.228.48$40,642
Jul 200804,858131.0811.39$55,330
Jun 200804,868131.3313.03$63,443
May 200805,199123.1711.57$60,175
Apr 200805,089110.3110.45$53,205
Mar 200805,258101.909.66$50,814
Feb 200805,14492.538.77$45,116
Jan 200805,72990.388.21$47,011
Dec 200705,98888.337.30$43,724
Nov 200705,11691.677.29$37,304
Oct 200705,94782.856.92$41,165
Sep 200706,38575.846.24$39,869
Aug 200707,04669.066.39$45,009
Jul 200707,31870.906.39$46,747
Jun 200707,47762.007.55$56,440
May 200708,90058.747.85$69,832
Apr 200709,50959.617.81$74,220
Mar 2007011,26656.927.30$82,264
Feb 2007011,90055.108.22$97,770
Jan 2007016,12150.306.73$108,444
Dec 2006021,11656.656.92$146,090
Nov 200607,73254.207.62$58,898

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $ 98.93 =         $0
Gas                   13 Mcf  × $  2.87 =        $37

────────────────────────────────────────────────────
Month total                                      $37

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/223270 is the state's own key, not one this site invented.