WHITEHEAD 10

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 227221District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$2.2 M
Nov 2006 – May 2026
Value, last 12 filed months
$20 k
at the published price for each month
Months reported
235
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-07-10174665
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition12 bbl$1,024
GasProduction423,777 Mcf$2,224,298
Total$2,225,322

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5215, -100.8934. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.52145, -100.89341 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,700 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,700 ft.

Completions filed
Nov 2006
1 of 1 wells

1 well

42-4353802958,700 ftNov 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (235)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

235 months

May 20260510106.413.05$1,553
Apr 2026044898.932.87$1,286
Mar 2026049289.753.15$1,550
Feb 2026046663.503.75$1,748
Jan 2026046259.138.00$3,695
Dec 2025029256.664.41$1,289
Nov 2025021558.593.93$844
Oct 2025045959.383.30$1,517
Sep 2025042662.743.08$1,311
Aug 2025057263.933.01$1,724
Jul 2025061466.743.32$2,036
Jun 2025056766.483.13$1,774
May 2025055960.553.23$1,807
Apr 2025058262.363.54$2,062
Mar 2025061867.704.27$2,638
Feb 2025057870.884.34$2,509
Jan 2025061574.324.28$2,631
Dec 2024061768.993.12$1,926
Nov 2024060769.052.20$1,334
Oct 2024061071.372.28$1,392
Sep 2024060869.612.36$1,438
Aug 2024061975.632.06$1,277
Jul 2024063979.932.15$1,372
Jun 2024058378.082.63$1,536
May 2024060878.812.20$1,337
Apr 2024062684.451.66$1,039
Mar 2024065780.301.55$1,015
Feb 2024045976.091.78$819
Jan 2024064473.023.30$2,124
Dec 2023064471.262.61$1,681
Nov 2023063777.892.81$1,788
Oct 2023065985.443.09$2,035
Sep 2023064089.042.74$1,750
Aug 2023065580.522.67$1,751
Jul 2023065574.852.64$1,730
Jun 2023062768.962.26$1,416
May 2023066770.622.23$1,486
Apr 2023071178.122.24$1,591
Mar 2023088572.852.39$2,118
Feb 2023085375.112.47$2,103
Jan 2023094276.533.39$3,191
Dec 2022095176.415.73$5,448
Nov 2022092485.005.65$5,217
Oct 2022096287.185.86$5,641
Sep 2022092484.888.16$7,543
Aug 2022095194.529.13$8,680
Jul 20220960101.587.54$7,240
Jun 20220955115.097.98$7,618
May 202201,121109.378.43$9,453
Apr 20220872104.226.84$5,962
Mar 202201,008108.885.08$5,117
Feb 2022087791.054.86$4,261
Jan 2022098881.844.54$4,483
Dec 202101,00671.323.90$3,923
Nov 2021097977.435.24$5,127
Oct 202101,01879.795.71$5,817
Sep 2021095769.865.35$5,121
Aug 2021098966.024.22$4,174
Jul 202101,02470.783.98$4,078
Jun 202101,01269.493.38$3,421
May 202101,05363.483.02$3,178
Apr 202101,03060.362.76$2,841
Mar 202101,04861.302.72$2,847
Feb 202101,03957.805.55$5,764
Jan 202101,09450.412.81$3,074
Dec 202001,42744.642.68$3,818
Nov 202001,27038.772.71$3,437
Oct 202001,15536.972.48$2,863
Sep 202001,15837.091.99$2,306
Aug 202001,21939.982.39$2,907
Jul 202001,27638.371.83$2,329
Jun 202001,22534.901.69$2,071
May 2020049816.921.81$904
Apr 2020066914.751.80$1,207
Mar 2020072330.341.86$1,342
Feb 2020069749.881.98$1,381
Jan 2020080757.252.09$1,690
Dec 2019089059.012.30$2,051
Nov 2019070355.302.75$1,934
Oct 2019092453.472.42$2,235
Sep 2019087655.052.66$2,328
Aug 2019096953.112.30$2,233
Jul 2019087756.272.46$2,157
Jun 2019089352.782.49$2,225
May 2019097358.482.74$2,666
Apr 2019093562.632.75$2,572
Mar 201901,01756.803.06$3,114
Feb 2019092150.852.79$2,572
Jan 2019098646.033.23$3,183
Dec 201801,04046.594.19$4,353
Nov 201801,01352.934.24$4,292
Oct 201801,08961.443.40$3,701
Sep 201801,01259.543.11$3,145
Aug 201801,04759.403.07$3,211
Jul 201801,04065.142.93$3,049
Jun 2018098460.183.08$3,028
May 201801,10965.382.90$3,217
Apr 201801,12663.842.90$3,266
Mar 201801,21561.222.79$3,386
Feb 201801,09161.782.77$3,018
Jan 201801,21062.874.01$4,851
Dec 201701,22357.272.92$3,573
Nov 201701,19555.423.12$3,726
Oct 201701,23649.292.98$3,688
Sep 201701,20447.523.09$3,717
Aug 201701,25745.373.00$3,777
Jul 201701,27543.873.09$3,936
Jun 201701,28442.493.09$3,964
May 201701,32945.373.26$4,337
Apr 201701,39747.933.21$4,487
Mar 201701,54846.772.98$4,619
Feb 2017075850.452.95$2,238
Jan 2017083249.413.42$2,844
Dec 2016096448.763.72$3,589
Nov 2016098042.492.64$2,591
Oct 201601,01246.193.09$3,127
Sep 201601,00741.553.10$3,122
Aug 201601,11441.442.92$3,258
Jul 201601,05041.622.92$3,071
Jun 201601,08445.352.69$2,911
May 201601,05942.521.99$2,109
Apr 201601,04036.561.99$2,071
Mar 201601,10733.011.79$1,986
Feb 2016096726.472.06$1,996
Jan 201601,11127.352.36$2,627
Dec 201501,12132.362.00$2,244
Nov 201501,00038.792.17$2,167
Oct 201501,00043.552.43$2,427
Sep 2015097742.992.76$2,695
Aug 201501,01240.162.87$2,907
Jul 201501,09648.152.95$3,228
Jun 201501,11056.152.88$3,200
May 2015097155.212.96$2,870
Apr 201501,05349.822.71$2,850
Mar 201501,20542.892.93$3,536
Feb 201501,10844.662.98$3,298
Jan 201501,19143.433.10$3,693
Dec 201401,27354.693.59$4,572
Nov 201401,44770.464.25$6,152
Oct 201401,15478.303.90$4,502
Sep 201401,19486.164.05$4,830
Aug 201401,25389.394.04$5,056
Jul 201411,07696.564.18$4,594
Jun 201401,04198.164.74$4,931
May 201401,16594.734.73$5,506
Apr 201411,14495.944.81$5,598
Mar 201421,28095.895.06$6,664
Feb 201401,24597.406.19$7,709
Jan 201401,38690.404.86$6,737
Dec 201301,53791.824.35$6,693
Nov 201301,55788.853.74$5,821
Oct 201301,48797.423.78$5,620
Sep 201301,242104.113.72$4,617
Aug 201301,388104.253.52$4,889
Jul 201301,407102.523.72$5,231
Jun 201301,80494.403.93$7,096
May 201301,95794.834.15$8,120
Apr 201302,04093.964.28$8,736
Mar 201302,24093.623.91$8,765
Feb 201302,43691.233.42$8,331
Jan 201302,16891.603.42$7,414
Dec 2012096086.773.42$3,283
Nov 2012095586.953.62$3,462
Oct 201201,02989.383.40$3,498
Sep 201201,05694.672.92$3,082
Aug 201201,15892.662.91$3,368
Jul 201201,20385.133.02$3,634
Jun 201201,30579.822.52$3,287
May 201201,46591.612.49$3,645
Apr 201201,487101.652.00$2,969
Mar 201201,600105.052.22$3,555
Feb 201221,809101.102.57$4,852
Jan 201201,28698.092.73$3,516
Dec 201101,90496.873.24$6,168
Nov 201101,93295.723.31$6,397
Oct 201102,04584.983.65$7,461
Sep 201101,94583.623.99$7,752
Aug 201102,07483.404.15$8,606
Jul 201102,11194.144.52$9,536
Jun 201102,05492.904.64$9,530
May 201102,04798.134.40$9,017
Apr 201101,992105.964.33$8,632
Mar 201102,07996.364.06$8,435
Feb 201101,67985.644.18$7,018
Jan 201102,10286.504.59$9,646
Dec 201002,14285.734.35$9,313
Nov 201002,15580.843.80$8,179
Oct 201002,12778.103.51$7,463
Sep 201022,26972.633.98$9,175
Aug 201002,40773.684.42$10,637
Jul 201002,46372.554.74$11,666
Jun 201012,59970.364.91$12,832
May 201001,59271.124.24$6,742
Apr 201001,90281.694.12$7,841
Mar 201022,54778.394.39$11,335
Feb 201002,32773.585.44$12,664
Jan 201002,48874.365.96$14,839
Dec 200902,68771.445.48$14,735
Nov 200902,64174.593.75$9,908
Oct 200902,71572.544.11$11,159
Sep 200912,78265.543.06$8,592
Aug 200903,03767.423.22$9,775
Jul 200902,90261.133.46$10,054
Jun 200902,83766.163.90$11,050
May 200903,04554.743.93$11,954
Apr 200902,98046.773.59$10,691
Mar 200903,15642.144.06$12,810
Feb 200902,93232.814.63$13,584
Jan 200903,34335.865.37$17,955
Dec 200803,45137.105.98$20,627
Nov 200803,35455.496.86$23,010
Oct 200803,51475.246.92$24,324
Sep 200803,423101.767.88$26,963
Aug 200803,657114.228.48$31,022
Jul 200803,828131.0811.39$43,599
Jun 200803,827131.3313.03$49,876
May 200804,088123.1711.57$47,316
Apr 200804,174110.3110.45$43,639
Mar 200804,486101.909.66$43,353
Feb 200804,38692.538.77$38,468
Jan 200804,81090.388.21$39,470
Dec 200704,96888.337.30$36,276
Nov 200704,96191.677.29$36,174
Oct 200705,61582.856.92$38,867
Sep 200705,63375.846.24$35,173
Aug 200706,27569.066.39$40,084
Jul 200706,32370.906.39$40,391
Jun 200706,98362.007.55$52,711
May 200708,09258.747.85$63,492
Apr 200708,73759.617.81$68,194
Mar 2007010,04256.927.30$73,326
Feb 2007010,52455.108.22$86,465
Jan 2007013,61350.306.73$91,573
Dec 2006015,86656.656.92$109,768
Nov 200607,86454.207.62$59,904

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  510 Mcf  × $  3.05 =     $1,553

────────────────────────────────────────────────────
Month total                                   $1,553

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/227221 is the state's own key, not one this site invented.