GENINI

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 234971District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$807 k
Apr 2007 – May 2026
Value, last 12 filed months
$5 k
at the published price for each month
Months reported
230
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-05-30177979
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition5 bbl$362
GasProduction152,103 Mcf$807,107
Total$807,469

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4030, -100.7480. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.40298, -100.74803 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,977 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,977 ft.

Completions filed
Apr 2007
1 of 1 wells

1 well

42-4353833939147,977 ftApr 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (230)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

230 months

May 20260153106.413.05$466
Apr 2026014598.932.87$416
Mar 2026014689.753.15$460
Feb 2026014063.503.75$525
Jan 2026014059.138.00$1,120
Dec 202504256.664.41$185
Nov 202503258.593.93$126
Oct 202502859.383.30$93
Sep 202503862.743.08$117
Aug 2025112063.933.01$426
Jul 2025012266.743.32$404
Jun 2025012466.483.13$388
May 2025012860.553.23$414
Apr 2025011862.363.54$418
Mar 2025112267.704.27$588
Feb 2025011070.884.34$477
Jan 2025014274.324.28$608
Dec 2024015068.993.12$468
Nov 2024014569.052.20$319
Oct 2024014471.372.28$329
Sep 2024115169.612.36$427
Aug 2024015575.632.06$320
Jul 2024015879.932.15$339
Jun 2024010178.082.63$266
May 20240278.812.20$4
Apr 2024117784.451.66$378
Mar 2024019580.301.55$301
Feb 2024118076.091.78$397
Jan 2024019073.023.30$627
Dec 2023019671.262.61$512
Nov 2023020077.892.81$562
Oct 2023020785.443.09$639
Sep 2023020389.042.74$555
Aug 2023020280.522.67$540
Jul 2023021074.852.64$555
Jun 2023021268.962.26$479
May 2023021670.622.23$481
Apr 2023021678.122.24$483
Mar 2023022072.852.39$527
Feb 2023020575.112.47$505
Jan 2023021176.533.39$715
Dec 2022021176.415.73$1,209
Nov 2022020785.005.65$1,169
Oct 2022022087.185.86$1,290
Sep 2022022684.888.16$1,845
Aug 2022023194.529.13$2,108
Jul 20220207101.587.54$1,561
Jun 20220228115.097.98$1,819
May 20220229109.378.43$1,931
Apr 20220236104.226.84$1,614
Mar 20220228108.885.08$1,157
Feb 2022017191.054.86$831
Jan 2022020281.844.54$917
Dec 2021020671.323.90$803
Nov 2021019377.435.24$1,011
Oct 2021020079.795.71$1,143
Sep 2021020569.865.35$1,097
Aug 2021021566.024.22$907
Jul 2021020870.783.98$828
Jun 2021020169.493.38$680
May 2021020963.483.02$631
Apr 2021019360.362.76$532
Mar 2021020561.302.72$557
Feb 2021017457.805.55$965
Jan 2021019450.412.81$545
Dec 2020019344.642.68$516
Nov 2020019638.772.71$530
Oct 2020020836.972.48$516
Sep 2020020637.091.99$410
Aug 2020021039.982.39$501
Jul 2020021438.371.83$391
Jun 2020021034.901.69$355
May 2020020216.921.81$367
Apr 2020021314.751.80$384
Mar 2020021030.341.86$390
Feb 2020020449.881.98$404
Jan 2020022957.252.09$480
Dec 2019021659.012.30$498
Nov 2019022755.302.75$624
Oct 2019024053.472.42$580
Sep 2019023655.052.66$627
Aug 2019024953.112.30$574
Jul 2019024156.272.46$593
Jun 2019024552.782.49$610
May 2019024458.482.74$669
Apr 2019023762.632.75$652
Mar 2019025056.803.06$766
Feb 2019022750.852.79$634
Jan 2019025546.033.23$823
Dec 2018025846.594.19$1,080
Nov 2018026952.934.24$1,140
Oct 2018029061.443.40$985
Sep 2018025159.543.11$780
Aug 2018028159.403.07$862
Jul 2018029065.142.93$850
Jun 2018028360.183.08$871
May 2018030665.382.90$888
Apr 2018031463.842.90$911
Mar 2018031561.222.79$878
Feb 2018028361.782.77$783
Jan 2018035362.874.01$1,415
Dec 2017042357.272.92$1,236
Nov 2017033155.423.12$1,032
Oct 2017039149.292.98$1,167
Sep 2017049847.523.09$1,537
Aug 2017060845.373.00$1,827
Jul 2017060743.873.09$1,874
Jun 2017026342.493.09$812
May 2017027345.373.26$891
Apr 2017026447.933.21$848
Mar 2017027446.772.98$818
Feb 2017030250.452.95$892
Jan 2017052449.413.42$1,791
Dec 2016066148.763.72$2,461
Nov 2016046342.492.64$1,224
Oct 2016030846.193.09$952
Sep 2016027841.553.10$862
Aug 2016028241.442.92$825
Jul 2016028641.622.92$836
Jun 2016027745.352.69$744
May 2016029042.521.99$577
Apr 2016029236.561.99$581
Mar 2016030933.011.79$554
Feb 2016027926.472.06$576
Jan 2016034327.352.36$811
Dec 2015055932.362.00$1,119
Nov 2015071538.792.17$1,550
Oct 2015034543.552.43$837
Sep 2015043142.992.76$1,189
Aug 2015043340.162.87$1,244
Jul 2015047448.152.95$1,396
Jun 2015077456.152.88$2,231
May 2015046955.212.96$1,386
Apr 2015055249.822.71$1,494
Mar 2015051742.892.93$1,517
Feb 2015047944.662.98$1,426
Jan 2015049043.433.10$1,519
Dec 2014051354.693.59$1,842
Nov 2014058670.464.25$2,492
Oct 2014052478.303.90$2,044
Sep 2014054086.164.05$2,185
Aug 2014050689.394.04$2,042
Jul 2014061596.564.18$2,570
Jun 2014054998.164.74$2,601
May 2014059994.734.73$2,831
Apr 2014062295.944.81$2,991
Mar 2014061895.895.06$3,125
Feb 2014053897.406.19$3,331
Jan 2014058190.404.86$2,824
Dec 2013048291.824.35$2,099
Nov 2013054188.853.74$2,022
Oct 2013068497.423.78$2,585
Sep 20130741104.113.72$2,755
Aug 20130599104.253.52$2,110
Jul 20130517102.523.72$1,922
Jun 2013053394.403.93$2,097
May 2013065494.834.15$2,714
Apr 2013072993.964.28$3,122
Mar 2013070893.623.91$2,770
Feb 2013065891.233.42$2,250
Jan 2013077491.603.42$2,647
Dec 2012078786.773.42$2,692
Nov 2012090886.953.62$3,291
Oct 2012075189.383.40$2,553
Sep 2012049594.672.92$1,445
Aug 2012054692.662.91$1,588
Jul 2012067385.133.02$2,033
Jun 2012065179.822.52$1,640
May 2012079791.612.49$1,983
Apr 20120764101.652.00$1,526
Mar 20120849105.052.22$1,887
Feb 20120940101.102.57$2,416
Jan 201201,16298.092.73$3,177
Dec 201101,00596.873.24$3,256
Nov 2011053395.723.31$1,765
Oct 2011053984.983.65$1,967
Sep 2011052383.623.99$2,085
Aug 2011054283.404.15$2,249
Jul 2011061894.144.52$2,792
Jun 2011057892.904.64$2,682
May 2011066598.134.40$2,929
Apr 20110797105.964.33$3,454
Mar 201101,14196.364.06$4,629
Feb 2011092385.644.18$3,858
Jan 201101,10886.504.59$5,084
Dec 2010066985.734.35$2,909
Nov 201001,09180.843.80$4,141
Oct 2010044978.103.51$1,575
Sep 2010063772.633.98$2,535
Aug 201001,05773.684.42$4,671
Jul 201001,04372.554.74$4,940
Jun 201001,37870.364.91$6,767
May 201001,66471.124.24$7,047
Apr 201001,46081.694.12$6,019
Mar 201001,27778.394.39$5,604
Feb 2010062073.585.44$3,374
Jan 2010072074.365.96$4,294
Dec 2009079471.445.48$4,354
Nov 2009081274.593.75$3,046
Oct 2009090972.544.11$3,736
Sep 2009093265.543.06$2,856
Aug 200901,15967.423.22$3,730
Jul 200901,29661.133.46$4,490
Jun 200901,35766.163.90$5,286
May 200901,58654.743.93$6,226
Apr 200901,51946.773.59$5,449
Mar 200901,74742.144.06$7,091
Feb 200901,57432.814.63$7,292
Jan 200901,80535.865.37$9,695
Dec 200801,42437.105.98$8,511
Nov 200801,62055.496.86$11,114
Oct 200801,86775.246.92$12,923
Sep 200801,838101.767.88$14,478
Aug 200801,857114.228.48$15,753
Jul 200802,018131.0811.39$22,984
Jun 200802,054131.3313.03$26,769
May 200802,112123.1711.57$24,445
Apr 200802,238110.3110.45$23,398
Mar 200802,432101.909.66$23,503
Feb 200802,25492.538.77$19,769
Jan 200802,60390.388.21$21,360
Dec 200702,85688.337.30$20,854
Nov 200702,93591.677.29$21,401
Oct 200703,24382.856.92$22,448
Sep 200703,52575.846.24$22,011
Aug 200703,41069.066.39$21,783
Jul 200704,48070.906.39$28,618
Jun 200704,66962.007.55$35,244
May 200705,86258.747.85$45,995
Apr 200701,53159.617.81$11,950

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  153 Mcf  × $  3.05 =       $466

────────────────────────────────────────────────────
Month total                                     $466

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/234971 is the state's own key, not one this site invented.