GENINI

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 247132District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.0 M
Nov 2006 – May 2026
Value, last 12 filed months
$10 k
at the published price for each month
Months reported
235
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112009-06-16178176
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition41 bbl$3,620
GasProduction189,612 Mcf$998,716
Total$1,002,336

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.3999, -100.7435. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.39986, -100.74351 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,796 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,796 ft.

Completions filed
Nov 2006
1 of 1 wells

1 well

42-4353815616227,796 ftNov 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (235)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

235 months

May 20260234106.413.05$713
Apr 2026138798.932.87$1,210
Mar 2026041189.753.15$1,294
Feb 2026238963.503.75$1,586
Jan 2026044359.138.00$3,543
Dec 2025041456.664.41$1,827
Nov 20250358.593.93$12
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250166.483.13$3
May 20250660.553.23$19
Apr 20250262.363.54$7
Mar 20250367.704.27$13
Feb 20250470.884.34$17
Jan 20250374.324.28$13
Dec 20240268.993.12$6
Nov 20240269.052.20$4
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230174.852.64$3
Jun 20230168.962.26$2
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 20220185109.378.43$1,560
Apr 20220381104.226.84$2,605
Mar 20220436108.885.08$2,213
Feb 2022040791.054.86$1,978
Jan 2022049081.844.54$2,223
Dec 2021018771.323.90$729
Nov 2021021877.435.24$1,142
Oct 2021048479.795.71$2,766
Sep 2021038669.865.35$2,065
Aug 2021029966.024.22$1,262
Jul 2021038370.783.98$1,525
Jun 2021022669.493.38$764
May 2021026263.483.02$791
Apr 2021027260.362.76$750
Mar 2021033861.302.72$918
Feb 2021028157.805.55$1,559
Jan 2021038450.412.81$1,079
Dec 2020039444.642.68$1,054
Nov 2020019338.772.71$522
Oct 2020023236.972.48$575
Sep 2020034937.091.99$695
Aug 2020026039.982.39$620
Jul 2020045438.371.83$829
Jun 2020028134.901.69$475
May 2020043216.921.81$784
Apr 2020046714.751.80$843
Mar 2020045330.341.86$841
Feb 2020038649.881.98$765
Jan 2020027757.252.09$580
Dec 2019036259.012.30$834
Nov 2019047055.302.75$1,293
Oct 2019037053.472.42$895
Sep 2019045655.052.66$1,212
Aug 2019047853.112.30$1,101
Jul 2019030456.272.46$748
Jun 2019027952.782.49$695
May 2019032458.482.74$888
Apr 2019034062.632.75$935
Mar 2019049356.803.06$1,510
Feb 2019046250.852.79$1,290
Jan 2019050546.033.23$1,630
Dec 2018051646.594.19$2,160
Nov 2018042952.934.24$1,818
Oct 2018049561.443.40$1,682
Sep 2018053459.543.11$1,660
Aug 2018045859.403.07$1,404
Jul 2018046665.142.93$1,366
Jun 2018043060.183.08$1,323
May 2018050665.382.90$1,468
Apr 2018044563.842.90$1,291
Mar 2018050061.222.79$1,393
Feb 2018045461.782.77$1,256
Jan 2018045162.874.01$1,808
Dec 2017058557.272.92$1,709
Nov 2017054355.423.12$1,693
Oct 2017065049.292.98$1,939
Sep 2017049447.523.09$1,525
Aug 2017057345.373.00$1,722
Jul 2017055443.873.09$1,710
Jun 2017053442.493.09$1,649
May 2017052845.373.26$1,723
Apr 2017053347.933.21$1,712
Mar 2017047746.772.98$1,423
Feb 2017044250.452.95$1,305
Jan 2017038149.413.42$1,303
Dec 2016053448.763.72$1,988
Nov 2016048742.492.64$1,288
Oct 2016053346.193.09$1,647
Sep 2016059241.553.10$1,836
Aug 2016061441.442.92$1,796
Jul 2016062541.622.92$1,828
Jun 2016060345.352.69$1,620
May 2016063342.521.99$1,260
Apr 2016058836.561.99$1,171
Mar 2016066033.011.79$1,184
Feb 2016062226.472.06$1,284
Jan 2016064127.352.36$1,516
Dec 2015066732.362.00$1,335
Nov 2015064638.792.17$1,400
Oct 2015070043.552.43$1,699
Sep 2015062042.992.76$1,710
Aug 2015070240.162.87$2,016
Jul 2015069148.152.95$2,035
Jun 2015068456.152.88$1,972
May 2015066755.212.96$1,971
Apr 2015064949.822.71$1,757
Mar 2015068942.892.93$2,022
Feb 2015064644.662.98$1,923
Jan 2015068243.433.10$2,115
Dec 2014065954.693.59$2,367
Nov 2014068770.464.25$2,921
Oct 2014072378.303.90$2,820
Sep 2014070886.164.05$2,864
Aug 2014074489.394.04$3,002
Jul 2014071896.564.18$3,001
Jun 2014070298.164.74$3,325
May 2014076594.734.73$3,616
Apr 2014076695.944.81$3,684
Mar 2014078895.895.06$3,985
Feb 2014470297.406.19$4,736
Jan 2014082690.404.86$4,015
Dec 2013079091.824.35$3,440
Nov 2013081788.853.74$3,054
Oct 2013089897.423.78$3,394
Sep 20130696104.113.72$2,588
Aug 20132814104.253.52$3,076
Jul 20130866102.523.72$3,220
Jun 2013083894.403.93$3,296
May 2013089094.834.15$3,693
Apr 2013086593.964.28$3,704
Mar 2013091393.623.91$3,572
Feb 2013082691.233.42$2,825
Jan 201301,00991.603.42$3,451
Dec 2012090886.773.42$3,106
Nov 2012096186.953.62$3,484
Oct 201201,01889.383.40$3,461
Sep 201201,02394.672.92$2,986
Aug 201241,01292.662.91$3,314
Jul 2012089385.133.02$2,698
Jun 2012089779.822.52$2,260
May 201241,00191.612.49$2,857
Apr 20124935101.652.00$2,274
Mar 201201,013105.052.22$2,251
Feb 20124967101.102.57$2,890
Jan 201201,07698.092.73$2,942
Dec 201101,06496.873.24$3,447
Nov 201101,06795.723.31$3,533
Oct 201101,10784.983.65$4,039
Sep 201141,10883.623.99$4,751
Aug 201101,11883.404.15$4,639
Jul 201141,13694.144.52$5,508
Jun 201101,15392.904.64$5,350
May 201101,09998.134.40$4,841
Apr 201101,128105.964.33$4,888
Mar 201101,17196.364.06$4,751
Feb 201101,03785.644.18$4,335
Jan 201101,25886.504.59$5,773
Dec 201001,01785.734.35$4,422
Nov 2010099880.843.80$3,788
Oct 201001,23378.103.51$4,326
Sep 201001,38872.633.98$5,524
Aug 2010096273.684.42$4,251
Jul 2010344772.554.74$2,335
Jun 2010065270.364.91$3,202
May 2010088571.124.24$3,748
Apr 2010095781.694.12$3,945
Mar 201001,19078.394.39$5,223
Feb 201001,19673.585.44$6,509
Jan 201001,21474.365.96$7,240
Dec 200901,24471.445.48$6,822
Nov 2009091574.593.75$3,433
Oct 200901,44672.544.11$5,943
Sep 200901,20965.543.06$3,705
Aug 200921,21667.423.22$4,049
Jul 200901,34061.133.46$4,642
Jun 200901,29766.163.90$5,052
May 200921,12054.743.93$4,506
Apr 200901,22346.773.59$4,388
Mar 200901,41042.144.06$5,723
Feb 200901,22332.814.63$5,666
Jan 200901,53635.865.37$8,250
Dec 200801,80437.105.98$10,783
Nov 200801,66955.496.86$11,450
Oct 200812,06775.246.92$14,383
Sep 200801,767101.767.88$13,919
Aug 200801,856114.228.48$15,744
Jul 200801,916131.0811.39$21,822
Jun 200802,173131.3313.03$28,320
May 200801,874123.1711.57$21,690
Apr 200802,151110.3110.45$22,488
Mar 200802,266101.909.66$21,899
Feb 200802,28092.538.77$19,997
Jan 200802,55090.388.21$20,925
Dec 200702,70788.337.30$19,766
Nov 200702,69091.677.29$19,615
Oct 200703,12182.856.92$21,604
Sep 200703,24575.846.24$20,262
Aug 200703,31069.066.39$21,144
Jul 200703,63670.906.39$23,227
Jun 200703,72962.007.55$28,148
May 200704,00258.747.85$31,401
Apr 200704,02859.617.81$31,439
Mar 200704,28756.927.30$31,304
Feb 200704,27555.108.22$35,123
Jan 200704,93550.306.73$33,197
Dec 200605,22556.656.92$36,149
Nov 2006047254.207.62$3,595

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  234 Mcf  × $  3.05 =       $713

────────────────────────────────────────────────────
Month total                                     $713

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/247132 is the state's own key, not one this site invented.