SHURLEY RR 4D

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 236285District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$697 k
Jun 2007 – May 2026
Value, last 12 filed months
$4 k
at the published price for each month
Months reported
228
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-09-02179266
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition72 bbl$4,330
GasProduction129,998 Mcf$692,871
Total$697,201

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4445, -100.7190. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.44446, -100.71904 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,243 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,243 ft.

Completions filed
Jun 2007
1 of 1 wells

1 well

42-4353842637,243 ftJun 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (228)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

228 months

May 20260143106.413.05$436
Apr 2026014898.932.87$425
Mar 2026015389.753.15$482
Feb 2026014763.503.75$551
Jan 2026014259.138.00$1,136
Dec 202507856.664.41$344
Nov 202502258.593.93$86
Oct 202501459.383.30$46
Sep 202503962.743.08$120
Aug 202504163.933.01$124
Jul 202502366.743.32$76
Jun 202501366.483.13$41
May 202502660.553.23$84
Apr 202502662.363.54$92
Mar 202502667.704.27$111
Feb 202503770.884.34$161
Jan 202503474.324.28$145
Dec 202402768.993.12$84
Nov 202401869.052.20$40
Oct 202401071.372.28$23
Sep 20240969.612.36$21
Aug 202401275.632.06$25
Jul 202401179.932.15$24
Jun 202401178.082.63$29
May 202401478.812.20$31
Apr 202401784.451.66$28
Mar 202402980.301.55$45
Feb 202403176.091.78$55
Jan 202403673.023.30$119
Dec 202304171.262.61$107
Nov 202304477.892.81$124
Oct 202303885.443.09$117
Sep 202302689.042.74$71
Aug 202302280.522.67$59
Jul 202303074.852.64$79
Jun 202303568.962.26$79
May 202303870.622.23$85
Apr 202303678.122.24$81
Mar 202303672.852.39$86
Feb 202303275.112.47$79
Jan 202303576.533.39$119
Dec 202204676.415.73$264
Nov 202202585.005.65$141
Oct 202201387.185.86$76
Sep 202201184.888.16$90
Aug 20220594.529.13$46
Jul 2022010101.587.54$75
Jun 2022013115.097.98$104
May 2022019109.378.43$160
Apr 2022028104.226.84$191
Mar 2022027108.885.08$137
Feb 202202191.054.86$102
Jan 202201481.844.54$64
Dec 202105671.323.90$218
Nov 202105677.435.24$293
Oct 202105679.795.71$320
Sep 202107869.865.35$417
Aug 202106766.024.22$283
Jul 202105370.783.98$211
Jun 202105969.493.38$199
May 202106263.483.02$187
Apr 202106960.362.76$190
Mar 202108161.302.72$220
Feb 202108957.805.55$494
Jan 202108250.412.81$230
Dec 202008444.642.68$225
Nov 202007438.772.71$200
Oct 202007736.972.48$191
Sep 202007637.091.99$151
Aug 202007239.982.39$172
Jul 202006938.371.83$126
Jun 202007134.901.69$120
May 2020050116.921.81$909
Apr 202009014.751.80$162
Mar 202008830.341.86$163
Feb 202008649.881.98$170
Jan 202009357.252.09$195
Dec 201909659.012.30$221
Nov 201909355.302.75$256
Oct 201909853.472.42$237
Sep 201909655.052.66$255
Aug 2019010353.112.30$237
Jul 2019010856.272.46$266
Jun 2019010552.782.49$262
May 2019010458.482.74$285
Apr 2019010362.632.75$283
Mar 2019011256.803.06$343
Feb 2019011150.852.79$310
Jan 2019012946.033.23$416
Dec 2018012946.594.19$540
Nov 2018011752.934.24$496
Oct 2018012461.443.40$421
Sep 2018012359.543.11$382
Aug 2018011959.403.07$365
Jul 2018013265.142.93$387
Jun 2018011760.183.08$360
May 2018012765.382.90$368
Apr 2018014163.842.90$409
Mar 2018015361.222.79$426
Feb 2018014161.782.77$390
Jan 2018016162.874.01$646
Dec 2017015757.272.92$459
Nov 2017013955.423.12$433
Oct 2017014849.292.98$442
Sep 2017014647.523.09$451
Aug 2017014345.373.00$430
Jul 2017014343.873.09$441
Jun 2017013942.493.09$429
May 2017016145.373.26$525
Apr 2017015847.933.21$507
Mar 2017016446.772.98$489
Feb 2017015150.452.95$446
Jan 2017016849.413.42$574
Dec 2016017548.763.72$652
Nov 2016016542.492.64$436
Oct 2016016646.193.09$513
Sep 2016016041.553.10$496
Aug 2016117041.442.92$539
Jul 2016017341.622.92$506
Jun 2016017245.352.69$462
May 2016118442.521.99$409
Apr 2016017836.561.99$354
Mar 2016018533.011.79$332
Feb 2016017426.472.06$359
Jan 2016118627.352.36$467
Dec 2015020332.362.00$406
Nov 2015119838.792.17$468
Oct 2015019443.552.43$471
Sep 2015118742.992.76$559
Aug 2015122640.162.87$689
Jul 2015124548.152.95$770
Jun 2015021356.152.88$614
May 2015021655.212.96$638
Apr 2015023349.822.71$631
Mar 2015028542.892.93$836
Feb 2015031644.662.98$940
Jan 2015039343.433.10$1,219
Dec 2014046154.693.59$1,656
Nov 2014054470.464.25$2,313
Oct 2014062078.303.90$2,419
Sep 2014044686.164.05$1,804
Aug 2014032489.394.04$1,307
Jul 2014049396.564.18$2,061
Jun 2014070298.164.74$3,325
May 2014071894.734.73$3,394
Apr 2014059095.944.81$2,837
Mar 2014079495.895.06$4,015
Feb 2014034697.406.19$2,142
Jan 2014029490.404.86$1,429
Dec 2013034691.824.35$1,507
Nov 2013058288.853.74$2,176
Oct 2013070897.423.78$2,676
Sep 20130689104.113.72$2,562
Aug 20130733104.253.52$2,582
Jul 20130774102.523.72$2,878
Jun 2013076394.403.93$3,001
May 2013078794.834.15$3,265
Apr 2013076593.964.28$3,276
Mar 2013081693.623.91$3,193
Feb 2013073091.233.42$2,497
Jan 2013080991.603.42$2,767
Dec 2012071586.773.42$2,445
Nov 2012081786.953.62$2,962
Oct 2012073989.383.40$2,512
Sep 2012080494.672.92$2,346
Aug 2012078692.662.91$2,286
Jul 2012081185.133.02$2,450
Jun 2012077079.822.52$1,940
May 2012075591.612.49$1,879
Apr 20120694101.652.00$1,386
Mar 20120790105.052.22$1,755
Feb 20120838101.102.57$2,154
Jan 2012098198.092.73$2,682
Dec 2011071996.873.24$2,329
Nov 2011088795.723.31$2,937
Oct 2011050184.983.65$1,828
Sep 2011079183.623.99$3,153
Aug 2011097883.404.15$4,058
Jul 201101,06794.144.52$4,820
Jun 2011099092.904.64$4,593
May 201101,07898.134.40$4,748
Apr 201101,060105.964.33$4,593
Mar 201101,07096.364.06$4,341
Feb 2011096385.644.18$4,025
Jan 201101,11886.504.59$5,130
Dec 201001,13685.734.35$4,939
Nov 201001,13180.843.80$4,293
Oct 201001,13978.103.51$3,997
Sep 201001,12872.633.98$4,489
Aug 201001,17973.684.42$5,210
Jul 201001,21172.554.74$5,736
Jun 201001,20170.364.91$5,897
May 201001,25171.124.24$5,298
Apr 201001,24681.694.12$5,137
Mar 201001,30478.394.39$5,723
Feb 201001,19373.585.44$6,493
Jan 201001,33574.365.96$7,962
Dec 200901,24571.445.48$6,827
Nov 200901,30474.593.75$4,892
Oct 200901,47772.544.11$6,071
Sep 200901,48465.543.06$4,548
Aug 200921,49667.423.22$4,950
Jul 200911,60161.133.46$5,608
Jun 200931,55266.163.90$6,244
May 200931,58254.743.93$6,375
Apr 200941,67446.773.59$6,193
Mar 200971,80142.144.06$7,605
Feb 200961,67432.814.63$7,953
Jan 200951,89735.865.37$10,368
Dec 200861,95937.105.98$11,932
Nov 200871,98555.496.86$14,006
Oct 200862,13275.246.92$15,209
Sep 200872,151101.767.88$17,656
Aug 200822,394114.228.48$20,537
Jul 200802,642131.0811.39$30,091
Jun 200801,515131.3313.03$19,744
May 200801,531123.1711.57$17,720
Apr 200821,793110.3110.45$18,966
Mar 200841,900101.909.66$18,769
Feb 200802,06492.538.77$18,102
Jan 200802,28890.388.21$18,775
Dec 200702,39588.337.30$17,488
Nov 200702,58791.677.29$18,864
Oct 200703,18082.856.92$22,012
Sep 200703,02475.846.24$18,882
Aug 200703,77969.066.39$24,140
Jul 200704,53170.906.39$28,944
Jun 200703,52462.007.55$26,601

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  143 Mcf  × $  3.05 =       $436

────────────────────────────────────────────────────
Month total                                     $436

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/236285 is the state's own key, not one this site invented.