WARD C

Operated by ROBERT C. BROWER, LLC (P-5 100445) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 237366District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$551 k
Nov 2007 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
223
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112009-04-16191040
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition43 bbl$3,462
GasProduction74,596 Mcf$547,344
Total$550,806

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5309, -100.7261. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.53086, -100.72613 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,100 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,100 ft.

Completions filed
Nov 2007
1 of 1 wells

1 well

42-43538604427,100 ftNov 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (223)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

223 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 201701549.413.42$51
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 201603542.521.99$70
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 201611526.472.06$57
Jan 201604627.352.36$109
Dec 201502232.362.00$44
Nov 20150438.792.17$9
Oct 201505043.552.43$121
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 201503248.152.95$94
Jun 20150256.152.88$6
May 20150055.212.96$0
Apr 201504949.822.71$133
Mar 201506642.892.93$194
Feb 201505644.662.98$167
Jan 201504843.433.10$149
Dec 201406554.693.59$233
Nov 201405470.464.25$230
Oct 2014527078.303.90$1,445
Sep 2014031086.164.05$1,254
Aug 2014077989.394.04$3,143
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 2014059394.734.73$2,803
Apr 2014068895.944.81$3,309
Mar 2014046295.895.06$2,336
Feb 2014058697.406.19$3,629
Jan 2014058590.404.86$2,844
Dec 201348491.824.35$733
Nov 201301688.853.74$60
Oct 201303597.423.78$132
Sep 201301104.113.72$4
Aug 20130153104.253.52$539
Jul 20130118102.523.72$439
Jun 201301794.403.93$67
May 20134194.834.15$383
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 2013014591.233.42$496
Jan 201303591.603.42$120
Dec 20120086.773.42$0
Nov 201202486.953.62$87
Oct 201209789.383.40$330
Sep 20120894.672.92$23
Aug 2012019492.662.91$564
Jul 2012030385.133.02$915
Jun 2012033379.822.52$839
May 2012010491.612.49$259
Apr 201201,080101.652.00$2,157
Mar 2012082105.052.22$182
Feb 2012057101.102.57$147
Jan 201207898.092.73$213
Dec 2011312496.873.24$692
Nov 2011016095.723.31$530
Oct 2011018584.983.65$675
Sep 2011011283.623.99$446
Aug 2011015483.404.15$639
Jul 2011024794.144.52$1,116
Jun 2011414492.904.64$1,040
May 2011021598.134.40$947
Apr 20110472105.964.33$2,045
Mar 2011047896.364.06$1,939
Feb 2011047485.644.18$1,981
Jan 2011055286.504.59$2,533
Dec 2010062285.734.35$2,704
Nov 2010455180.843.80$2,415
Oct 2010027378.103.51$958
Sep 2010034472.633.98$1,369
Aug 2010027573.684.42$1,215
Jul 2010522172.554.74$1,410
Jun 2010062370.364.91$3,059
May 2010069971.124.24$2,960
Apr 2010214381.694.12$753
Mar 2010062778.394.39$2,752
Feb 2010069973.585.44$3,804
Jan 2010028674.365.96$1,706
Dec 20091115571.445.48$1,636
Nov 20090274.593.75$8
Oct 2009058772.544.11$2,413
Sep 2009025665.543.06$785
Aug 2009041467.423.22$1,332
Jul 2009048161.133.46$1,666
Jun 2009074266.163.90$2,890
May 2009083754.743.93$3,286
Apr 200901,22446.773.59$4,391
Mar 200901,56842.144.06$6,365
Feb 2009075332.814.63$3,489
Jan 200901,19735.865.37$6,429
Dec 200801,41737.105.98$8,470
Nov 200801,33355.496.86$9,145
Oct 2008049075.246.92$3,392
Sep 200801,545101.767.88$12,170
Aug 200801,903114.228.48$16,143
Jul 200802,789131.0811.39$31,765
Jun 200802,964131.3313.03$38,629
May 200804,065123.1711.57$47,049
Apr 200803,761110.3110.45$39,321
Mar 200804,582101.909.66$44,281
Feb 200804,60892.538.77$40,415
Jan 200805,86790.388.21$48,143
Dec 200708,19088.337.30$59,803
Nov 200706,38991.677.29$46,587

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jan 2017 — as filed, then multipliedworked
Condensate             0 bbl  × $ 49.41 =         $0
Gas                   15 Mcf  × $  3.42 =        $51

────────────────────────────────────────────────────
Month total                                      $51

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/237366 is the state's own key, not one this site invented.