Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 247127District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$683 k
Feb 2005 – May 2026
Value, last 12 filed months
$5 k
at the published price for each month
Months reported
256
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112009-09-29195003
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition180 bbl$11,699
GasProduction97,900 Mcf$670,814
Total$682,513

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5280, -100.7308. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.52800, -100.73083 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,000 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,000 ft.

Completions filed
Feb 2005
1 of 1 wells

1 well

42-43537129137,000 ftFeb 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (256)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

256 months

May 20260116106.413.05$353
Apr 2026011198.932.87$319
Mar 2026011589.753.15$362
Feb 2026010363.503.75$386
Jan 2026011059.138.00$880
Dec 2025011556.664.41$508
Nov 2025011258.593.93$440
Oct 2025012059.383.30$397
Sep 2025011662.743.08$357
Aug 2025011363.933.01$341
Jul 2025012266.743.32$404
Jun 2025011866.483.13$369
May 2025011960.553.23$385
Apr 2025011762.363.54$415
Mar 2025011667.704.27$495
Feb 2025010670.884.34$460
Jan 2025010074.324.28$428
Dec 2024010068.993.12$312
Nov 2024010369.052.20$226
Oct 2024011671.372.28$265
Sep 2024012769.612.36$300
Aug 2024012475.632.06$256
Jul 2024014379.932.15$307
Jun 2024015678.082.63$411
May 2024030178.812.20$662
Apr 202407184.451.66$118
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 202301485.443.09$43
Sep 2023011189.042.74$304
Aug 2023011780.522.67$313
Jul 2023012474.852.64$328
Jun 2023011568.962.26$260
May 2023013070.622.23$290
Apr 2023012478.122.24$277
Mar 2023012872.852.39$306
Feb 2023011375.112.47$279
Jan 2023012676.533.39$427
Dec 2022011976.415.73$682
Nov 2022012185.005.65$683
Oct 2022013787.185.86$803
Sep 2022011084.888.16$898
Aug 2022010794.529.13$977
Jul 20220123101.587.54$928
Jun 20220103115.097.98$822
May 20220125109.378.43$1,054
Apr 20220111104.226.84$759
Mar 20220119108.885.08$604
Feb 2022011391.054.86$549
Jan 2022012481.844.54$563
Dec 2021012871.323.90$499
Nov 2021012477.435.24$649
Oct 2021012979.795.71$737
Sep 2021012169.865.35$647
Aug 2021012466.024.22$523
Jul 2021012570.783.98$498
Jun 2021012769.493.38$429
May 2021011763.483.02$353
Apr 2021012460.362.76$342
Mar 2021012861.302.72$348
Feb 202109057.805.55$499
Jan 2021012250.412.81$343
Dec 2020012344.642.68$329
Nov 2020011738.772.71$317
Oct 2020012636.972.48$312
Sep 2020010437.091.99$207
Aug 2020011839.982.39$281
Jul 2020011338.371.83$206
Jun 2020012034.901.69$203
May 2020012216.921.81$221
Apr 2020011714.751.80$211
Mar 2020011930.341.86$221
Feb 2020011349.881.98$224
Jan 2020011757.252.09$245
Dec 2019012959.012.30$297
Nov 2019011155.302.75$305
Oct 2019011953.472.42$288
Sep 2019011755.052.66$311
Aug 2019012053.112.30$277
Jul 2019012356.272.46$303
Jun 2019012352.782.49$306
May 2019012658.482.74$345
Apr 2019012262.632.75$336
Mar 2019012556.803.06$383
Feb 2019011250.852.79$313
Jan 2019012346.033.23$397
Dec 2018012446.594.19$519
Nov 2018012052.934.24$508
Oct 201809261.443.40$313
Sep 2018011559.543.11$357
Aug 2018012159.403.07$371
Jul 2018012565.142.93$366
Jun 2018012160.183.08$372
May 2018012665.382.90$366
Apr 2018012263.842.90$354
Mar 2018211961.222.79$454
Feb 2018011461.782.77$315
Jan 2018012062.874.01$481
Dec 2017011857.272.92$345
Nov 2017011655.423.12$362
Oct 2017211349.292.98$436
Sep 2017011147.523.09$343
Aug 2017011345.373.00$340
Jul 2017110843.873.09$377
Jun 2017010442.493.09$321
May 2017010745.373.26$349
Apr 2017010347.933.21$331
Mar 2017010346.772.98$307
Feb 201709550.452.95$281
Jan 2017010449.413.42$356
Dec 2016010548.763.72$391
Nov 2016010342.492.64$272
Oct 2016010646.193.09$328
Sep 2016210541.553.10$409
Aug 2016011041.442.92$322
Jul 2016011141.622.92$325
Jun 2016210945.352.69$383
May 2016011042.521.99$219
Apr 2016010536.561.99$209
Mar 2016111033.011.79$230
Feb 2016010426.472.06$215
Jan 2016211727.352.36$331
Dec 2015011932.362.00$238
Nov 2015011238.792.17$243
Oct 2015111643.552.43$325
Sep 2015011742.992.76$323
Aug 2015112140.162.87$388
Jul 2015012648.152.95$371
Jun 2015012556.152.88$360
May 2015013355.212.96$393
Apr 2015013449.822.71$363
Mar 2015013842.892.93$405
Feb 2015013544.662.98$402
Jan 2015040443.433.10$1,253
Dec 201406154.693.59$219
Nov 201402770.464.25$115
Oct 2014010278.303.90$398
Sep 2014010686.164.05$429
Aug 2014011489.394.04$460
Jul 2014010996.564.18$456
Jun 2014010398.164.74$488
May 2014010894.734.73$510
Apr 2014011295.944.81$539
Mar 2014011295.895.06$566
Feb 2014010497.406.19$644
Jan 2014011790.404.86$569
Dec 2013011291.824.35$488
Nov 2013012988.853.74$482
Oct 2013013997.423.78$525
Sep 20130133104.113.72$494
Aug 20130180104.253.52$634
Jul 20130169102.523.72$628
Jun 2013013794.403.93$539
May 2013013894.834.15$573
Apr 2013013993.964.28$595
Mar 2013015093.623.91$587
Feb 2013010991.233.42$373
Jan 201307691.603.42$260
Dec 201207486.773.42$253
Nov 2012010786.953.62$388
Oct 2012028189.383.40$955
Sep 2012030094.672.92$876
Aug 2012031792.662.91$922
Jul 2012026385.133.02$794
Jun 2012026579.822.52$668
May 2012029291.612.49$727
Apr 20120296101.652.00$591
Mar 20120285105.052.22$633
Feb 20120278101.102.57$715
Jan 2012035898.092.73$979
Dec 2011036896.873.24$1,192
Nov 2011035995.723.31$1,189
Oct 2011036584.983.65$1,332
Sep 2011033583.623.99$1,335
Aug 2011037483.404.15$1,552
Jul 2011037394.144.52$1,685
Jun 2011035792.904.64$1,656
May 2011034698.134.40$1,524
Apr 20110407105.964.33$1,764
Mar 2011040996.364.06$1,659
Feb 2011038885.644.18$1,622
Jan 2011046286.504.59$2,120
Dec 2010052885.734.35$2,296
Nov 2010052680.843.80$1,996
Oct 2010058978.103.51$2,067
Sep 2010070272.633.98$2,794
Aug 2010040873.684.42$1,803
Jul 2010017072.554.74$805
Jun 20100570.364.91$25
May 20100071.124.24$0
Apr 20100081.694.12$0
Mar 20100078.394.39$0
Feb 20100073.585.44$0
Jan 20100074.365.96$0
Dec 20090071.445.48$0
Nov 20090074.593.75$0
Oct 20090072.544.11$0
Sep 20090065.543.06$0
Aug 2009094167.423.22$3,029
Jul 2009091961.133.46$3,184
Jun 200909066.163.90$351
May 2009012754.743.93$499
Apr 2009011546.773.59$413
Mar 2009015642.144.06$633
Feb 2009017232.814.63$797
Jan 2009026235.865.37$1,407
Dec 2008029337.105.98$1,751
Nov 2008033855.496.86$2,319
Oct 2008042975.246.92$2,970
Sep 20080506101.767.88$3,986
Aug 20080645114.228.48$5,472
Jul 20080607131.0811.39$6,913
Jun 20081691131.3313.03$9,137
May 20083770123.1711.57$9,282
Apr 20084749110.3110.45$8,272
Mar 20080783101.909.66$7,567
Feb 2008074492.538.77$6,525
Jan 2008782990.388.21$7,435
Dec 200701,17188.337.30$8,551
Nov 200781,18291.677.29$9,352
Oct 200701,25982.856.92$8,715
Sep 200761,15075.846.24$7,636
Aug 2007099569.066.39$6,356
Jul 200771,06370.906.39$7,287
Jun 200781,29762.007.55$10,286
May 200701,70458.747.85$13,370
Apr 200781,28459.617.81$10,499
Mar 200791,40956.927.30$10,801
Feb 200701,38755.108.22$11,396
Jan 200701,70350.306.73$11,456
Dec 2006101,90356.656.92$13,732
Nov 200601,85654.207.62$14,138
Oct 200611,89454.906.01$11,445
Sep 20060060.085.04$0
Aug 2006231168.717.34$2,420
Jul 2006697469.376.34$6,594
Jun 200661,98366.286.38$13,057
May 200641,31566.016.42$8,713
Apr 200661,27364.397.36$9,756
Mar 200641,92856.707.08$13,883
Feb 200601,53857.597.75$11,921
Jan 200681,71660.598.93$15,814
Dec 200501,96054.9413.42$26,294
Nov 200502,47954.6910.59$26,249
Oct 2005123,16458.3413.80$44,350
Sep 2005132,95761.4512.08$36,516
Aug 2005163,83161.519.80$38,516
Jul 2005134,15055.697.84$33,275
Jun 200523,70952.337.38$27,481
May 2005075345.226.65$5,008
Apr 20052049.207.36$98
Mar 200502,18550.377.15$15,633
Feb 200501,08745.226.31$6,861

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  116 Mcf  × $  3.05 =       $353

────────────────────────────────────────────────────
Month total                                     $353

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/247127 is the state's own key, not one this site invented.