SHURLEY 36

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 238590District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.0 M
Dec 2007 – May 2026
Value, last 12 filed months
$110
at the published price for each month
Months reported
222
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-09-24182589
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition480 bbl$39,355
GasProduction198,032 Mcf$998,324
Total$1,037,679

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4324, -100.7056. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.43242, -100.70558 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,025 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,025 ft.

Completions filed
Dec 2007
1 of 1 wells

1 well

42-43538724167,025 ftDec 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (222)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

222 months

May 202603106.413.05$9
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250356.664.41$13
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250162.743.08$3
Aug 20250263.933.01$6
Jul 20250166.743.32$3
Jun 202502466.483.13$75
May 2025019960.553.23$643
Apr 2025027362.363.54$967
Mar 2025031667.704.27$1,349
Feb 2025030470.884.34$1,320
Jan 2025034974.324.28$1,493
Dec 2024036868.993.12$1,149
Nov 2024036269.052.20$796
Oct 2024037071.372.28$844
Sep 2024035769.612.36$844
Aug 2024038375.632.06$790
Jul 2024035879.932.15$768
Jun 2024033278.082.63$874
May 2024031378.812.20$688
Apr 2024029884.451.66$494
Mar 2024034380.301.55$530
Feb 2024032376.091.78$576
Jan 2024030773.023.30$1,012
Dec 2023032071.262.61$835
Nov 2023031577.892.81$884
Oct 2023028885.443.09$889
Sep 2023031189.042.74$851
Aug 2023032680.522.67$871
Jul 2023033374.852.64$880
Jun 2023033868.962.26$763
May 2023034870.622.23$775
Apr 2023037978.122.24$848
Mar 2023037072.852.39$885
Feb 2023034375.112.47$846
Jan 2023037676.533.39$1,274
Dec 2022037676.415.73$2,154
Nov 2022038485.005.65$2,168
Oct 2022038787.185.86$2,269
Sep 2022039384.888.16$3,208
Aug 2022039394.529.13$3,587
Jul 20220416101.587.54$3,138
Jun 20220398115.097.98$3,175
May 20220439109.378.43$3,702
Apr 20220431104.226.84$2,947
Mar 20220436108.885.08$2,213
Feb 2022045791.054.86$2,220
Jan 2022048681.844.54$2,205
Dec 2021049771.323.90$1,938
Nov 2021051177.435.24$2,676
Oct 2021041679.795.71$2,377
Sep 2021045369.865.35$2,424
Aug 2021048166.024.22$2,030
Jul 2021050570.783.98$2,011
Jun 2021050069.493.38$1,690
May 2021050863.483.02$1,533
Apr 2021059360.362.76$1,636
Mar 2021040261.302.72$1,092
Feb 2021031057.805.55$1,720
Jan 2021038450.412.81$1,079
Dec 2020037944.642.68$1,014
Nov 2020037738.772.71$1,020
Oct 2020040336.972.48$999
Sep 2020032337.091.99$643
Aug 2020037839.982.39$902
Jul 2020033138.371.83$604
Jun 2020033534.901.69$566
May 2020035916.921.81$652
Apr 2020036714.751.80$662
Mar 2020033830.341.86$627
Feb 2020036049.881.98$713
Jan 2020038557.252.09$806
Dec 2019037159.012.30$855
Nov 2019035855.302.75$985
Oct 2019037053.472.42$895
Sep 2019035355.052.66$938
Aug 2019036553.112.30$841
Jul 2019036656.272.46$900
Jun 2019035452.782.49$882
May 2019037658.482.74$1,030
Apr 2019036962.632.75$1,015
Mar 2019038756.803.06$1,185
Feb 2019133750.852.79$992
Jan 2019038946.033.23$1,256
Dec 2018036546.594.19$1,528
Nov 2018030552.934.24$1,292
Oct 2018136761.443.40$1,309
Sep 2018037759.543.11$1,172
Aug 2018039059.403.07$1,196
Jul 2018337265.142.93$1,286
Jun 2018035660.183.08$1,095
May 2018036065.382.90$1,044
Apr 2018235463.842.90$1,155
Mar 2018035461.222.79$987
Feb 2018034361.782.77$949
Jan 2018037862.874.01$1,516
Dec 2017140657.272.92$1,243
Nov 2017040155.423.12$1,250
Oct 2017340749.292.98$1,362
Sep 2017040147.523.09$1,238
Aug 2017040845.373.00$1,226
Jul 2017239243.873.09$1,298
Jun 2017039942.493.09$1,232
May 2017141145.373.26$1,387
Apr 201708447.933.21$270
Mar 20170146.772.98$3
Feb 20170050.452.95$0
Jan 20170149.413.42$3
Dec 201613148.763.72$164
Nov 2016021242.492.64$561
Oct 2016234146.193.09$1,146
Sep 2016149741.553.10$1,583
Aug 2016033741.442.92$986
Jul 201601141.622.92$32
Jun 201603045.352.69$81
May 201602942.521.99$58
Apr 201602836.561.99$56
Mar 201622233.011.79$105
Feb 201601626.472.06$33
Jan 20160227.352.36$5
Dec 2015056832.362.00$1,137
Nov 2015058338.792.17$1,264
Oct 2015359843.552.43$1,582
Sep 2015259642.992.76$1,730
Aug 2015011440.162.87$327
Jul 2015038748.152.95$1,140
Jun 2015339656.152.88$1,310
May 2015041255.212.96$1,218
Apr 2015012249.822.71$330
Mar 201501542.892.93$44
Feb 2015072144.662.98$2,146
Jan 2015040243.433.10$1,246
Dec 2014588654.693.59$3,455
Nov 2014397670.464.25$4,361
Oct 2014056678.303.90$2,208
Sep 201416386.164.05$341
Aug 2014449889.394.04$2,367
Jul 201441,09196.564.18$4,946
Jun 201401,00298.164.74$4,746
May 2014071694.734.73$3,384
Apr 2014037195.944.81$1,784
Mar 2014320995.895.06$1,345
Feb 2014062297.406.19$3,851
Jan 2014162990.404.86$3,148
Dec 2013310191.824.35$715
Nov 2013484788.853.74$3,522
Oct 201361,16797.423.78$4,995
Sep 201361,211104.113.72$5,127
Aug 201351,285104.253.52$5,048
Jul 201341,315102.523.72$5,299
Jun 2013062394.403.93$2,451
May 201351,09494.834.15$5,013
Apr 201301,23293.964.28$5,276
Mar 201351,30093.623.91$5,555
Feb 201351,24091.233.42$4,697
Jan 201351,33491.603.42$5,020
Dec 201241,16286.773.42$4,321
Nov 2012101,34286.953.62$5,734
Oct 201251,42589.383.40$5,291
Sep 201251,39494.672.92$4,542
Aug 201291,46092.662.91$5,080
Jul 201251,44085.133.02$4,776
Jun 201251,45179.822.52$4,054
May 2012101,64291.612.49$5,002
Apr 201251,602101.652.00$3,707
Mar 201201,702105.052.22$3,782
Feb 201241,163101.102.57$3,394
Jan 201241,25898.092.73$3,832
Dec 201161,28296.873.24$4,735
Nov 201141,23595.723.31$4,472
Oct 201141,33384.983.65$5,203
Sep 201131,30983.623.99$5,468
Aug 2011499883.404.15$4,475
Jul 201141,37094.144.52$6,565
Jun 201151,52592.904.64$7,540
May 201151,80498.134.40$8,437
Apr 2011101,877105.964.33$9,193
Mar 201112,09096.364.06$8,576
Feb 2011313685.644.18$825
Jan 201131,10286.504.59$5,316
Dec 201091,57185.734.35$7,602
Nov 201041,65780.843.80$6,612
Oct 201051,72678.103.51$6,447
Sep 201081,57472.633.98$6,845
Aug 201041,55173.684.42$7,149
Jul 201051,99572.554.74$9,812
Jun 201002,07170.364.91$10,169
May 201051,76371.124.24$7,822
Apr 201051,93681.694.12$8,390
Mar 201042,00378.394.39$9,104
Feb 201001,75473.585.44$9,546
Jan 201051,51274.365.96$9,390
Dec 200962,60871.445.48$14,730
Nov 200962,55174.593.75$10,018
Oct 2009142,60572.544.11$11,723
Sep 2009132,66665.543.06$9,023
Aug 200973,29067.423.22$11,061
Jul 2009112,82761.133.46$10,467
Jun 2009112,49166.163.90$10,430
May 200952,90054.743.93$11,658
Apr 200962,09246.773.59$7,786
Mar 200953,47542.144.06$14,316
Feb 200971,82532.814.63$8,685
Jan 200962,44035.865.37$13,320
Dec 200863,34337.105.98$20,204
Nov 2008153,41455.496.86$24,254
Oct 200874,79475.246.92$33,711
Sep 200892,573101.767.88$21,184
Aug 200892,547114.228.48$22,634
Jul 200863,330131.0811.39$38,713
Jun 200885,046131.3313.03$66,813
May 2008115,632123.1711.57$66,541
Apr 200832,171110.3110.45$23,028
Mar 200861,848101.909.66$18,471
Feb 200872,08992.538.77$18,969
Jan 2008134,12690.388.21$35,032
Dec 2007147,73288.337.30$57,695

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                    3 Mcf  × $  3.05 =         $9

────────────────────────────────────────────────────
Month total                                       $9

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/238590 is the state's own key, not one this site invented.