KELLY 125

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 239722District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$871 k
Feb 2008 – May 2026
Value, last 12 filed months
$29
at the published price for each month
Months reported
220
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-11-21183349
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition397 bbl$32,541
GasProduction150,773 Mcf$838,029
Total$870,570

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4298, -100.7016. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.42983, -100.70159 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,900 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,900 ft.

Completions filed
Feb 2008
1 of 1 wells

1 well

42-43538714366,900 ftFeb 2008

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (220)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

220 months

May 202603106.413.05$9
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260263.503.75$8
Jan 20260059.138.00$0
Dec 20250156.664.41$4
Nov 20250258.593.93$8
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230185.443.09$3
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210579.795.71$29
Sep 202103869.865.35$203
Aug 202102666.024.22$110
Jul 202106970.783.98$275
Jun 202107969.493.38$267
May 202106663.483.02$199
Apr 202107460.362.76$204
Mar 202108261.302.72$223
Feb 202106657.805.55$366
Jan 202108450.412.81$236
Dec 2020012244.642.68$326
Nov 202007938.772.71$214
Oct 202009236.972.48$228
Sep 202008637.091.99$171
Aug 202008439.982.39$200
Jul 202008838.371.83$161
Jun 202008534.901.69$144
May 202009416.921.81$171
Apr 202009714.751.80$175
Mar 2020011030.341.86$204
Feb 202009349.881.98$184
Jan 2020010457.252.09$218
Dec 2019010859.012.30$249
Nov 2019010355.302.75$283
Oct 2019010553.472.42$254
Sep 2019013155.052.66$348
Aug 2019012753.112.30$293
Jul 2019013256.272.46$325
Jun 2019013552.782.49$336
May 2019016358.482.74$447
Apr 2019023262.632.75$638
Mar 2019035756.803.06$1,093
Feb 201904750.852.79$131
Jan 2019016346.033.23$526
Dec 2018018846.594.19$787
Nov 2018016752.934.24$708
Oct 2018118861.443.40$700
Sep 2018022659.543.11$702
Aug 2018024959.403.07$764
Jul 2018325965.142.93$955
Jun 2018026560.183.08$815
May 2018030965.382.90$896
Apr 2018234863.842.90$1,137
Mar 2018028761.222.79$800
Feb 2018027561.782.77$761
Jan 2018029162.874.01$1,167
Dec 2017126757.272.92$837
Nov 2017024955.423.12$776
Oct 2017330549.292.98$1,058
Sep 2017037547.523.09$1,158
Aug 2017041445.373.00$1,244
Jul 2017343043.873.09$1,459
Jun 2017043442.493.09$1,340
May 2017344845.373.26$1,598
Apr 2017043747.933.21$1,403
Mar 2017046546.772.98$1,387
Feb 2017042150.452.95$1,243
Jan 2017046249.413.42$1,579
Dec 2016346048.763.72$1,859
Nov 2016044942.492.64$1,187
Oct 2016349546.193.09$1,668
Sep 2016248941.553.10$1,599
Aug 2016047641.442.92$1,392
Jul 2016036541.622.92$1,067
Jun 2016234645.352.69$1,020
May 2016038142.521.99$759
Apr 2016021236.561.99$422
Mar 201631233.011.79$121
Feb 20160526.472.06$10
Jan 2016056227.352.36$1,329
Dec 2015063932.362.00$1,279
Nov 2015062438.792.17$1,352
Oct 2015463243.552.43$1,708
Sep 2015462542.992.76$1,896
Aug 2015069340.162.87$1,991
Jul 2015067148.152.95$1,976
Jun 2015568956.152.88$2,267
May 2015073455.212.96$2,169
Apr 2015072349.822.71$1,957
Mar 2015077342.892.93$2,269
Feb 2015070544.662.98$2,098
Jan 2015085843.433.10$2,660
Dec 2014292254.693.59$3,421
Nov 201421570.464.25$205
Oct 2014056878.303.90$2,216
Sep 2014478586.164.05$3,520
Aug 2014481789.394.04$3,654
Jul 2014490296.564.18$4,156
Jun 2014094498.164.74$4,472
May 201401,11894.734.73$5,284
Apr 201407695.944.81$365
Mar 2014336295.895.06$2,118
Feb 2014074797.406.19$4,625
Jan 2014483890.404.86$4,435
Dec 2013481291.824.35$3,903
Nov 2013479888.853.74$3,339
Oct 2013487097.423.78$3,678
Sep 20135998104.113.72$4,231
Aug 201351,122104.253.52$4,474
Jul 201311,300102.523.72$4,936
Jun 2013062694.403.93$2,462
May 20131094.834.15$95
Apr 201301893.964.28$77
Mar 2013376193.623.91$3,259
Feb 2013382591.233.42$3,095
Jan 2013383391.603.42$3,124
Dec 2012396886.773.42$3,571
Nov 201281,04686.953.62$4,487
Oct 201241,09589.383.40$4,080
Sep 201241,09394.672.92$3,568
Aug 201271,02692.662.91$3,632
Jul 201241,08985.133.02$3,630
Jun 201241,02679.822.52$2,904
May 201281,17491.612.49$3,654
Apr 201251,237101.652.00$2,978
Mar 201201,467105.052.22$3,260
Feb 201261,471101.102.57$4,387
Jan 201261,86698.092.73$5,690
Dec 201162,09096.873.24$7,352
Nov 201111,08195.723.31$3,675
Oct 20110184.983.65$4
Sep 20110183.623.99$4
Aug 201101983.404.15$79
Jul 2011211294.144.52$694
Jun 2011398992.904.64$4,868
May 201121,08698.134.40$4,980
Apr 20113459105.964.33$2,307
Mar 2011399596.364.06$4,326
Feb 2011278585.644.18$3,453
Jan 2011282186.504.59$3,940
Dec 201061,12085.734.35$5,384
Nov 2010388780.843.80$3,609
Oct 201031,13778.103.51$4,224
Sep 2010101,54372.633.98$6,867
Aug 201041,97773.684.42$9,032
Jul 201011,57072.554.74$7,509
Jun 201003970.364.91$192
May 2010265771.124.24$2,925
Apr 201031,18381.694.12$5,122
Mar 201041,45378.394.39$6,690
Feb 201001,89973.585.44$10,335
Jan 2010479574.365.96$5,039
Dec 200951,86271.445.48$10,568
Nov 200942,09574.593.75$8,158
Oct 200951,23972.544.11$5,455
Sep 200971,08165.543.06$3,772
Aug 200941,87967.423.22$6,317
Jul 200971,86461.133.46$6,886
Jun 200991,74166.163.90$7,377
May 200952,63254.743.93$10,606
Apr 200952,10546.773.59$7,786
Mar 200942,74142.144.06$11,294
Feb 2009102,57832.814.63$12,272
Jan 200963,06935.865.37$16,699
Dec 200863,15537.105.98$19,080
Nov 2008143,41255.496.86$24,184
Oct 200873,85075.246.92$27,176
Sep 2008143,808101.767.88$31,421
Aug 2008144,446114.228.48$39,315
Jul 200884,805131.0811.39$55,775
Jun 2008105,664131.3313.03$75,130
May 2008147,113123.1711.57$84,052
Apr 200873,491110.3110.45$37,270
Mar 2008115,631101.909.66$55,539
Feb 200802,28692.538.77$20,050

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                    3 Mcf  × $  3.05 =         $9

────────────────────────────────────────────────────
Month total                                       $9

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/239722 is the state's own key, not one this site invented.