RICHARDSON 4

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 239981District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$816 k
Feb 2008 – May 2026
Value, last 12 filed months
$11 k
at the published price for each month
Months reported
220
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-10-20183935
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition290 bbl$23,659
GasProduction185,194 Mcf$792,546
Total$816,206

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5842, -100.7770. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.58415, -100.77697 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,407 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,407 ft.

Completions filed
Feb 2008
1 of 1 wells

1 well

42-43538669138,407 ftFeb 2008

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (220)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

220 months

May 202600106.413.05$0
Apr 202608098.932.87$230
Mar 2026026089.753.15$819
Feb 2026023763.503.75$889
Jan 2026025259.138.00$2,015
Dec 2025026656.664.41$1,174
Nov 2025028158.593.93$1,103
Oct 2025030059.383.30$991
Sep 2025028262.743.08$868
Aug 2025031063.933.01$935
Jul 2025033466.743.32$1,107
Jun 2025037166.483.13$1,161
May 2025036960.553.23$1,193
Apr 2025039362.363.54$1,392
Mar 2025049667.704.27$2,117
Feb 2025045870.884.34$1,988
Jan 2025055174.324.28$2,358
Dec 2024069468.993.12$2,166
Nov 2024075369.052.20$1,655
Oct 2024082371.372.28$1,878
Sep 2024081269.612.36$1,920
Aug 2024084975.632.06$1,752
Jul 2024084279.932.15$1,807
Jun 2024081778.082.63$2,152
May 2024086778.812.20$1,906
Apr 2024085484.451.66$1,417
Mar 2024088880.301.55$1,372
Feb 2024086876.091.78$1,548
Jan 2024288873.023.30$3,074
Dec 2023095271.262.61$2,485
Nov 2023092777.892.81$2,603
Oct 20231782885.443.09$4,009
Sep 202301,07589.042.74$2,940
Aug 202301,00280.522.67$2,678
Jul 2023261,16274.852.64$5,016
Jun 202321,14668.962.26$2,726
May 202301,28570.622.23$2,862
Apr 2023101,48778.122.24$4,109
Mar 202301,21472.852.39$2,905
Feb 202301,21175.112.47$2,986
Jan 2023181,55476.533.39$6,642
Dec 202221,28776.415.73$7,526
Nov 202211,53785.005.65$8,763
Oct 2022317387.185.86$1,276
Sep 2022016884.888.16$1,372
Aug 2022317494.529.13$1,872
Jul 20220182101.587.54$1,373
Jun 20220175115.097.98$1,396
May 20220173109.378.43$1,459
Apr 20220169104.226.84$1,156
Mar 20220172108.885.08$873
Feb 2022015591.054.86$753
Jan 2022015881.844.54$717
Dec 2021018471.323.90$717
Nov 2021017577.435.24$916
Oct 2021019479.795.71$1,108
Sep 2021020569.865.35$1,097
Aug 2021022066.024.22$929
Jul 2021022270.783.98$884
Jun 2021022169.493.38$747
May 2021022063.483.02$664
Apr 2021022660.362.76$623
Mar 2021023161.302.72$628
Feb 2021023357.805.55$1,293
Jan 2021025250.412.81$708
Dec 2020026344.642.68$704
Nov 2020028138.772.71$761
Oct 2020025836.972.48$639
Sep 2020029337.091.99$583
Aug 2020028939.982.39$689
Jul 2020030938.371.83$564
Jun 2020034734.901.69$587
May 2020039816.921.81$722
Apr 2020031114.751.80$561
Mar 2020031830.341.86$590
Feb 2020038949.881.98$770
Jan 2020043557.252.09$911
Dec 2019045159.012.30$1,039
Nov 2019044355.302.75$1,219
Oct 2019047653.472.42$1,151
Sep 2019045255.052.66$1,201
Aug 2019050153.112.30$1,154
Jul 2019053956.272.46$1,326
Jun 2019051252.782.49$1,275
May 2019053858.482.74$1,474
Apr 2019049162.632.75$1,351
Mar 2019051856.803.06$1,586
Feb 2019046650.852.79$1,301
Jan 2019056446.033.23$1,821
Dec 2018076946.594.19$3,219
Nov 2018076352.934.24$3,233
Oct 2018099161.443.40$3,368
Sep 201801,00259.543.11$3,114
Aug 201801,01459.403.07$3,109
Jul 2018096265.142.93$2,820
Jun 201801,14260.183.08$3,514
May 201811,03965.382.90$3,079
Apr 201801,22863.842.90$3,562
Mar 201801,89261.222.79$5,273
Feb 2018061661.782.77$1,704
Jan 201803662.874.01$144
Dec 2017059557.272.92$1,738
Nov 201725255.423.12$273
Oct 2017070349.292.98$2,098
Sep 2017013347.523.09$411
Aug 2017052245.373.00$1,568
Jul 2017036943.873.09$1,139
Jun 20170442.493.09$12
May 2017043845.373.26$1,429
Apr 2017149747.933.21$1,644
Mar 2017054846.772.98$1,635
Feb 2017149650.452.95$1,515
Jan 2017031449.413.42$1,074
Dec 2016152448.763.72$2,000
Nov 2016155042.492.64$1,497
Oct 2016061846.193.09$1,910
Sep 2016162341.553.10$1,973
Aug 2016067541.442.92$1,974
Jul 2016171741.622.92$2,138
Jun 2016073045.352.69$1,961
May 2016184142.521.99$1,717
Apr 2016073836.561.99$1,469
Mar 2016320333.011.79$463
Feb 2016059426.472.06$1,226
Jan 2016165327.352.36$1,571
Dec 2015065232.362.00$1,305
Nov 2015062438.792.17$1,352
Oct 2015265543.552.43$1,677
Sep 2015066842.992.76$1,843
Aug 2015277240.162.87$2,298
Jul 2015071648.152.95$2,109
Jun 2015199556.152.88$2,925
May 201531,22755.212.96$3,792
Apr 2015469249.822.71$2,072
Mar 201511,03942.892.93$3,092
Feb 2015594244.662.98$3,027
Jan 201501,04643.433.10$3,243
Dec 201451,10054.693.59$4,224
Nov 201401,08770.464.25$4,622
Oct 201431,15278.303.90$4,729
Sep 201411,12786.164.05$4,645
Aug 201431,22889.394.04$5,223
Jul 201461,30896.564.18$6,046
Jun 201411,26398.164.74$6,081
May 201421,12894.734.73$5,521
Apr 201411,16295.944.81$5,684
Mar 2014235595.895.06$1,987
Feb 201461,46097.406.19$9,625
Jan 2014163190.404.86$3,158
Dec 2013125091.824.35$1,180
Nov 2013047088.853.74$1,757
Oct 2013282797.423.78$3,320
Sep 20130970104.113.72$3,606
Aug 20134833104.253.52$3,351
Jul 201301,035102.523.72$3,848
Jun 201311,14194.403.93$4,582
May 201301,16894.834.15$4,846
Apr 201311,06893.964.28$4,668
Mar 2013123993.623.91$1,029
Feb 2013029191.233.42$995
Jan 2013284191.603.42$3,059
Dec 2012082286.773.42$2,811
Nov 2012271386.953.62$2,759
Oct 201201,12589.383.40$3,825
Sep 201211,10194.672.92$3,308
Aug 201221,15392.662.91$3,538
Jul 201201,09985.133.02$3,320
Jun 201221,08479.822.52$2,890
May 201201,15791.612.49$2,879
Apr 201221,193101.652.00$2,585
Mar 201251,286105.052.22$3,383
Feb 201201,257101.102.57$3,231
Jan 201201,37998.092.73$3,770
Dec 201161,32996.873.24$4,887
Nov 2011296095.723.31$3,370
Oct 2011095584.983.65$3,484
Sep 201121,00583.623.99$4,173
Aug 201121,06383.404.15$4,578
Jul 201121,08194.144.52$5,071
Jun 201111,10292.904.64$5,206
May 2011095498.134.40$4,202
Apr 201121,003105.964.33$4,558
Mar 201101,31196.364.06$5,319
Feb 201141,11785.644.18$5,012
Jan 201101,20086.504.59$5,507
Dec 201001,16385.734.35$5,056
Nov 201001,13480.843.80$4,304
Oct 201021,22478.103.51$4,451
Sep 201021,22272.633.98$5,008
Aug 201001,29173.684.42$5,705
Jul 201021,30372.554.74$6,317
Jun 201001,29070.364.91$6,334
May 201021,34271.124.24$5,826
Apr 201021,31481.694.12$5,581
Mar 201001,41478.394.39$6,206
Feb 201001,21673.585.44$6,618
Jan 201021,26474.365.96$7,687
Dec 200901,42371.445.48$7,803
Nov 200921,42274.593.75$5,484
Oct 200901,48972.544.11$6,120
Sep 200921,49865.543.06$4,722
Aug 200901,58167.423.22$5,088
Jul 200921,56261.133.46$5,534
Jun 200921,52366.163.90$6,064
May 200901,53754.743.93$6,034
Apr 200921,45546.773.59$5,313
Mar 200921,75542.144.06$7,208
Feb 200921,41432.814.63$6,617
Jan 200911,82635.865.37$9,843
Dec 200801,14137.105.98$6,820
Nov 200831,82655.496.86$12,693
Oct 200821,31075.246.92$9,218
Sep 200821,346101.767.88$10,806
Aug 200822,305114.228.48$19,782
Jul 200821,740131.0811.39$20,080
Jun 200832,294131.3313.03$30,291
May 200832,891123.1711.57$33,831
Apr 200863,852110.3110.45$40,934
Mar 200813,728101.909.66$36,130
Feb 20084591192.538.77$12,154

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $ 98.93 =         $0
Gas                   80 Mcf  × $  2.87 =       $230

────────────────────────────────────────────────────
Month total                                     $230

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/239981 is the state's own key, not one this site invented.