RICHARDSON 4

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 242471District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.3 M
Feb 2008 – May 2026
Value, last 12 filed months
$21 k
at the published price for each month
Months reported
220
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112009-01-13183767
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition239 bbl$20,968
GasProduction244,145 Mcf$1,308,579
Total$1,329,547

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5869, -100.7797. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.58693, -100.77969 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,381 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,381 ft.

Completions filed
Feb 2008
1 of 1 wells

1 well

42-43538668128,381 ftFeb 2008

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (220)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

220 months

May 20260467106.413.05$1,422
Apr 2026045998.932.87$1,317
Mar 2026047989.753.15$1,509
Feb 2026043563.503.75$1,631
Jan 2026046459.138.00$3,711
Dec 2025051956.664.41$2,291
Nov 2025051458.593.93$2,018
Oct 2025044159.383.30$1,457
Sep 2025042662.743.08$1,311
Aug 2025043063.933.01$1,296
Jul 2025044366.743.32$1,469
Jun 2025046866.483.13$1,464
May 2025043560.553.23$1,406
Apr 2025030662.363.54$1,084
Mar 2025039567.704.27$1,686
Feb 2025031470.884.34$1,363
Jan 2025034474.324.28$1,472
Dec 2024036868.993.12$1,149
Nov 2024037769.052.20$829
Oct 2024042371.372.28$965
Sep 2024042269.612.36$998
Aug 2024046375.632.06$955
Jul 2024049479.932.15$1,060
Jun 2024050278.082.63$1,322
May 2024052878.812.20$1,161
Apr 2024057984.451.66$961
Mar 2024024580.301.55$379
Feb 2024026676.091.78$474
Jan 2024024773.023.30$815
Dec 2023034471.262.61$898
Nov 2023026877.892.81$752
Oct 2023012085.443.09$370
Sep 2023020789.042.74$566
Aug 2023024380.522.67$650
Jul 2023024374.852.64$642
Jun 2023032968.962.26$743
May 2023034970.622.23$777
Apr 2023032678.122.24$730
Mar 2023033272.852.39$795
Feb 2023032175.112.47$791
Jan 2023032776.533.39$1,108
Dec 2022041376.415.73$2,366
Nov 2022021285.005.65$1,197
Oct 2022031687.185.86$1,853
Sep 2022033184.888.16$2,702
Aug 2022037694.529.13$3,432
Jul 20220374101.587.54$2,821
Jun 20220376115.097.98$2,999
May 20220361109.378.43$3,044
Apr 20220388104.226.84$2,653
Mar 20220432108.885.08$2,193
Feb 2022038391.054.86$1,861
Jan 2022035881.844.54$1,624
Dec 2021037871.323.90$1,474
Nov 2021034377.435.24$1,796
Oct 2021036479.795.71$2,080
Sep 2021036269.865.35$1,937
Aug 2021038566.024.22$1,625
Jul 2021039170.783.98$1,557
Jun 2021041169.493.38$1,389
May 2021036063.483.02$1,086
Apr 2021039160.362.76$1,079
Mar 2021040261.302.72$1,092
Feb 2021027157.805.55$1,503
Jan 2021048150.412.81$1,352
Dec 2020045244.642.68$1,209
Nov 2020046838.772.71$1,267
Oct 2020049536.972.48$1,227
Sep 2020028937.091.99$575
Aug 202018739.982.39$247
Jul 2020042238.371.83$770
Jun 2020053234.901.69$899
May 2020054716.921.81$993
Apr 2020051014.751.80$920
Mar 2020053130.341.86$986
Feb 2020051149.881.98$1,012
Jan 2020055257.252.09$1,156
Dec 2019056259.012.30$1,295
Nov 2019054855.302.75$1,507
Oct 2019056853.472.42$1,374
Sep 2019058155.052.66$1,544
Aug 2019057253.112.30$1,318
Jul 2019069156.272.46$1,700
Jun 2019063452.782.49$1,579
May 2019067258.482.74$1,842
Apr 2019067162.632.75$1,846
Mar 2019066356.803.06$2,030
Feb 2019059850.852.79$1,670
Jan 2019064946.033.23$2,095
Dec 2018065646.594.19$2,746
Nov 2018060852.934.24$2,576
Oct 2018069361.443.40$2,355
Sep 2018066459.543.11$2,064
Aug 2018071159.403.07$2,180
Jul 2018071865.142.93$2,105
Jun 2018073860.183.08$2,271
May 2018172565.382.90$2,168
Apr 2018068963.842.90$1,999
Mar 2018070861.222.79$1,973
Feb 2018064361.782.77$1,779
Jan 2018069762.874.01$2,795
Dec 2017070857.272.92$2,068
Nov 2017369255.423.12$2,324
Oct 2017172549.292.98$2,212
Sep 2017071647.523.09$2,210
Aug 2017070445.373.00$2,115
Jul 2017071243.873.09$2,198
Jun 2017072342.493.09$2,232
May 2017065345.373.26$2,131
Apr 2017173847.933.21$2,418
Mar 2017077046.772.98$2,297
Feb 2017169850.452.95$2,111
Jan 2017077649.413.42$2,653
Dec 2016176448.763.72$2,893
Nov 2016173242.492.64$1,978
Oct 2016076346.193.09$2,358
Sep 2016173841.553.10$2,330
Aug 2016077841.442.92$2,275
Jul 2016178441.622.92$2,334
Jun 2016074845.352.69$2,009
May 2016180042.521.99$1,635
Apr 2016077936.561.99$1,551
Mar 2016481333.011.79$1,591
Feb 2016078226.472.06$1,614
Jan 2016182427.352.36$1,976
Dec 2015082332.362.00$1,647
Nov 2015079238.792.17$1,717
Oct 2015279643.552.43$2,019
Sep 2015081142.992.76$2,237
Aug 2015186140.162.87$2,513
Jul 2015081448.152.95$2,397
Jun 2015079056.152.88$2,277
May 2015280255.212.96$2,481
Apr 2015270049.822.71$1,994
Mar 2015072942.892.93$2,139
Feb 2015274344.662.98$2,301
Jan 2015082843.433.10$2,567
Dec 2014277354.693.59$2,886
Nov 2014079870.464.25$3,393
Oct 2014285178.303.90$3,476
Sep 2014080886.164.05$3,269
Aug 2014084489.394.04$3,406
Jul 2014285296.564.18$3,754
Jun 2014085798.164.74$4,060
May 2014287494.734.73$4,320
Apr 2014093095.944.81$4,472
Mar 2014271795.895.06$3,818
Feb 2014065197.406.19$4,031
Jan 2014181790.404.86$4,062
Dec 2013269891.824.35$3,223
Nov 2013063788.853.74$2,381
Oct 2013144197.423.78$1,764
Sep 20130485104.113.72$1,803
Aug 20131724104.253.52$2,655
Jul 20131259102.523.72$1,065
Jun 2013043194.403.93$1,695
May 2013082994.834.15$3,440
Apr 2013266293.964.28$3,023
Mar 201321,00893.623.91$4,131
Feb 2013092791.233.42$3,170
Jan 201331,20191.603.42$4,382
Dec 201201,18486.773.42$4,049
Nov 201221,17386.953.62$4,426
Oct 201201,10489.383.40$3,753
Sep 201201,12194.672.92$3,272
Aug 201221,21692.662.91$3,722
Jul 201201,27885.133.02$3,861
Jun 201221,20379.822.52$3,190
May 201201,34291.612.49$3,339
Apr 201221,349101.652.00$2,897
Mar 201221,469105.052.22$3,474
Feb 201231,450101.102.57$4,030
Jan 201201,57498.092.73$4,303
Dec 201131,59896.873.24$5,468
Nov 2011101,54795.723.31$6,080
Oct 201101,56184.983.65$5,695
Sep 201141,66383.623.99$6,963
Aug 201101,79883.404.15$7,460
Jul 201171,85794.144.52$9,047
Jun 2011101,86592.904.64$9,582
May 201142,08998.134.40$9,594
Apr 2011202,090105.964.33$11,176
Mar 201142,36296.364.06$9,969
Feb 201151,89285.644.18$8,337
Jan 201102,19086.504.59$10,049
Dec 201002,19985.734.35$9,561
Nov 201003,10480.843.80$11,781
Oct 201022,04078.103.51$7,314
Sep 201021,06172.633.98$4,367
Aug 201001,16573.684.42$5,149
Jul 201021,11872.554.74$5,441
Jun 201001,16370.364.91$5,711
May 201031,65171.124.24$7,206
Apr 2010102,32881.694.12$10,415
Mar 201001,21978.394.39$5,350
Feb 201001,14773.585.44$6,242
Jan 201021,62574.365.96$9,840
Dec 200901,97771.445.48$10,841
Nov 200921,25474.593.75$4,854
Oct 200901,40372.544.11$5,767
Sep 200921,46665.543.06$4,624
Aug 200901,58567.423.22$5,101
Jul 200921,68161.133.46$5,946
Jun 200922,47066.163.90$9,753
May 200902,59354.743.93$10,179
Apr 200921,59246.773.59$5,805
Mar 200922,45542.144.06$10,049
Feb 200932,26132.814.63$10,574
Jan 200932,57335.865.37$13,927
Dec 200802,93437.105.98$17,537
Nov 200873,14355.496.86$21,951
Oct 200843,39175.246.92$23,773
Sep 200843,498101.767.88$27,961
Aug 200854,218114.228.48$36,352
Jul 200854,683131.0811.39$53,992
Jun 200865,402131.3313.03$71,190
May 200876,380123.1711.57$74,706
Apr 2008208,295110.3110.45$88,929
Mar 20081212,184101.909.66$118,970
Feb 2008017,85392.538.77$156,581

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  467 Mcf  × $  3.05 =     $1,422

────────────────────────────────────────────────────
Month total                                   $1,422

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/242471 is the state's own key, not one this site invented.