SHURLEY RR 1A

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 247177District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$646 k
Mar 2007 – May 2026
Value, last 12 filed months
$5 k
at the published price for each month
Months reported
231
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112009-06-16177894
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition211 bbl$14,652
GasProduction119,967 Mcf$630,973
Total$645,625

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4180, -100.7489. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.41804, -100.74891 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,024 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,024 ft.

Completions filed
Mar 2007
1 of 1 wells

1 well

42-43538313148,024 ftMar 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (231)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

231 months

May 20260157106.413.05$478
Apr 2026014298.932.87$408
Mar 202609289.753.15$290
Feb 202609163.503.75$341
Jan 2026011059.138.00$880
Dec 2025012356.664.41$543
Nov 2025012058.593.93$471
Oct 2025012259.383.30$403
Sep 2025012262.743.08$375
Aug 2025011063.933.01$332
Jul 2025011566.743.32$381
Jun 2025011866.483.13$369
May 2025013060.553.23$420
Apr 2025012762.363.54$450
Mar 2025012567.704.27$534
Feb 2025011670.884.34$504
Jan 2025013774.324.28$586
Dec 2024014168.993.12$440
Nov 2024013169.052.20$288
Oct 2024013871.372.28$315
Sep 2024014069.612.36$331
Aug 2024013975.632.06$287
Jul 2024012479.932.15$266
Jun 2024012178.082.63$319
May 2024014478.812.20$317
Apr 2024013984.451.66$231
Mar 2024015080.301.55$232
Feb 2024014176.091.78$251
Jan 2024116873.023.30$627
Dec 2023015171.262.61$394
Nov 2023016377.892.81$458
Oct 2023016585.443.09$509
Sep 2023015689.042.74$427
Aug 2023015080.522.67$401
Jul 2023014474.852.64$380
Jun 2023016068.962.26$361
May 2023015470.622.23$343
Apr 2023016078.122.24$358
Mar 2023016272.852.39$388
Feb 2023015475.112.47$380
Jan 2023022076.533.39$745
Dec 2022017176.415.73$980
Nov 2022017085.005.65$960
Oct 2022017487.185.86$1,020
Sep 2022020984.888.16$1,706
Aug 2022021194.529.13$1,926
Jul 20220201101.587.54$1,516
Jun 20220168115.097.98$1,340
May 20220196109.378.43$1,653
Apr 20220173104.226.84$1,183
Mar 20220198108.885.08$1,005
Feb 2022015991.054.86$773
Jan 2022017881.844.54$808
Dec 2021013871.323.90$538
Nov 2021011577.435.24$602
Oct 2021013879.795.71$789
Sep 2021023469.865.35$1,252
Aug 2021014566.024.22$612
Jul 2021013170.783.98$522
Jun 2021014669.493.38$494
May 2021013063.483.02$392
Apr 2021012960.362.76$356
Mar 2021016161.302.72$437
Feb 2021014957.805.55$827
Jan 2021014650.412.81$410
Dec 2020011044.642.68$294
Nov 2020011538.772.71$311
Oct 2020014136.972.48$349
Sep 2020014137.091.99$281
Aug 2020016239.982.39$386
Jul 2020012538.371.83$228
Jun 2020012534.901.69$211
May 2020090216.921.81$1,637
Apr 2020113314.751.80$255
Mar 2020111930.341.86$251
Feb 2020013449.881.98$265
Jan 2020015957.252.09$333
Dec 2019017959.012.30$412
Nov 2019018355.302.75$503
Oct 2019124953.472.42$656
Sep 2019024555.052.66$651
Aug 2019121553.112.30$549
Jul 2019125256.272.46$676
Jun 2019025552.782.49$635
May 2019128658.482.74$842
Apr 2019127762.632.75$825
Mar 2019131156.803.06$1,009
Feb 2019130950.852.79$914
Jan 201916546.033.23$256
Dec 201817446.594.19$356
Nov 201835152.934.24$375
Oct 201804561.443.40$153
Sep 2018322859.543.11$887
Aug 2018426359.403.07$1,044
Jul 2018023865.142.93$698
Jun 2018525260.183.08$1,076
May 2018727265.382.90$1,247
Apr 20181027763.842.90$1,442
Mar 2018027061.222.79$752
Feb 2018028461.782.77$786
Jan 2018129062.874.01$1,226
Dec 2017130857.272.92$957
Nov 2017029555.423.12$920
Oct 2017231249.292.98$1,029
Sep 2017130847.523.09$998
Aug 2017031845.373.00$955
Jul 2017131843.873.09$1,026
Jun 2017131142.493.09$1,003
May 2017131245.373.26$1,064
Apr 2017121447.933.21$735
Mar 2017231046.772.98$1,018
Feb 2017131050.452.95$966
Jan 2017017649.413.42$602
Dec 2016230848.763.72$1,244
Nov 2016126942.492.64$754
Oct 2016126346.193.09$859
Sep 2016125741.553.10$838
Aug 2016132141.442.92$980
Jul 2016129141.622.92$893
Jun 2016019145.352.69$513
May 2016229942.521.99$680
Apr 2016132136.561.99$676
Mar 2016136133.011.79$681
Feb 2016132526.472.06$697
Jan 2016134127.352.36$834
Dec 2015133632.362.00$705
Nov 2015117038.792.17$407
Oct 2015017143.552.43$415
Sep 2015114842.992.76$451
Aug 2015124040.162.87$730
Jul 2015121848.152.95$690
Jun 2015018856.152.88$542
May 2015023055.212.96$680
Apr 2015025749.822.71$696
Mar 2015024942.892.93$731
Feb 2015029044.662.98$863
Jan 2015040843.433.10$1,265
Dec 2014043454.693.59$1,559
Nov 2014036070.464.25$1,531
Oct 2014041278.303.90$1,607
Sep 2014042086.164.05$1,699
Aug 2014044689.394.04$1,800
Jul 2014045196.564.18$1,885
Jun 2014044898.164.74$2,122
May 2014048794.734.73$2,302
Apr 2014043995.944.81$2,111
Mar 2014040795.895.06$2,058
Feb 2014042197.406.19$2,607
Jan 2014050890.404.86$2,469
Dec 2013050591.824.35$2,199
Nov 2013048688.853.74$1,817
Oct 2013053497.423.78$2,018
Sep 20130489104.113.72$1,818
Aug 20130409104.253.52$1,441
Jul 20130452102.523.72$1,680
Jun 2013047994.403.93$1,884
May 2013055394.834.15$2,294
Apr 2013055293.964.28$2,364
Mar 2013057393.623.91$2,242
Feb 2013053691.233.42$1,833
Jan 2013058791.603.42$2,007
Dec 2012057986.773.42$1,980
Nov 2012053686.953.62$1,943
Oct 2012053489.383.40$1,815
Sep 2012053294.672.92$1,553
Aug 2012057292.662.91$1,663
Jul 2012060285.133.02$1,819
Jun 2012057179.822.52$1,438
May 2012061691.612.49$1,533
Apr 20120597101.652.00$1,192
Mar 20120642105.052.22$1,427
Feb 20120581101.102.57$1,493
Jan 2012066198.092.73$1,807
Dec 2011063196.873.24$2,044
Nov 2011065195.723.31$2,156
Oct 2011071284.983.65$2,598
Sep 2011072083.623.99$2,870
Aug 2011074883.404.15$3,104
Jul 2011077594.144.52$3,501
Jun 2011074092.904.64$3,434
May 2011076098.134.40$3,348
Apr 20110754105.964.33$3,267
Mar 2011081196.364.06$3,291
Feb 2011071885.644.18$3,001
Jan 2011087486.504.59$4,011
Dec 2010082085.734.35$3,565
Nov 2010083380.843.80$3,162
Oct 2010087078.103.51$3,053
Sep 2010089572.633.98$3,562
Aug 2010086273.684.42$3,809
Jul 2010093172.554.74$4,410
Jun 2010092070.364.91$4,518
May 2010098071.124.24$4,151
Apr 2010094881.694.12$3,908
Mar 201001,02678.394.39$4,503
Feb 2010086973.585.44$4,729
Jan 2010085074.365.96$5,069
Dec 2009081271.445.48$4,453
Nov 2009090074.593.75$3,376
Oct 2009096072.544.11$3,946
Sep 2009098565.543.06$3,019
Aug 200921,11067.423.22$3,707
Jul 200911,18661.133.46$4,170
Jun 200921,19366.163.90$4,779
May 200921,10154.743.93$4,432
Apr 200931,08646.773.59$4,036
Mar 200951,19942.144.06$5,077
Feb 200931,24232.814.63$5,853
Jan 2009284835.865.37$4,626
Dec 200841,20637.105.98$7,357
Nov 200841,29455.496.86$9,099
Oct 2008393175.246.92$6,670
Sep 20083832101.767.88$6,859
Aug 200811,279114.228.48$10,964
Jul 200841,570131.0811.39$18,406
Jun 200811,778131.3313.03$23,303
May 200861,927123.1711.57$23,043
Apr 200852,089110.3110.45$22,392
Mar 200871,642101.909.66$16,582
Feb 200891,87192.538.77$17,243
Jan 200882,07090.388.21$17,709
Dec 200782,08588.337.30$15,931
Nov 2007112,16991.677.29$16,824
Oct 200742,43582.856.92$17,186
Sep 200742,28075.846.24$14,540
Aug 200742,25869.066.39$14,700
Jul 200792,51570.906.39$16,704
Jun 200752,68162.007.55$20,547
May 2007102,76758.747.85$22,298
Apr 200763,18259.617.81$25,194
Mar 200711,05356.927.30$7,746

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  157 Mcf  × $  3.05 =       $478

────────────────────────────────────────────────────
Month total                                     $478

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/247177 is the state's own key, not one this site invented.