EXXON FEE D

Operated by CITATION OIL & GAS CORP. (P-5 154235) in the NEWSOM (YATES) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 233102District 8AField 65370800GasSaveExport
Value, all time
$1.1 M
Dec 2007 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
222
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 44 leases and 49 wells, and the rule below applies to all of them.

Discovered
1974-12-04
as the register files it
Field class
Oil and gas
the register's own label
Between wells
660 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2010-03-23.

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 12/01/2008.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction214,100 Mcf$1,109,218
Total$1,109,218

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.6292, -102.7463. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.62918, -102.74625 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
4,800 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,800 ft.

Completions filed
Dec 2007
1 of 1 wells

1 well

42-1653314284,800 ftDec 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (222)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

222 months

May 20260106.413.05$0
Apr 2026098.932.87$0
Mar 2026089.753.15$0
Feb 2026063.503.75$0
Jan 2026059.138.00$0
Dec 2025056.664.41$0
Nov 2025058.593.93$0
Oct 2025059.383.30$0
Sep 2025062.743.08$0
Aug 2025063.933.01$0
Jul 2025066.743.32$0
Jun 2025066.483.13$0
May 2025060.553.23$0
Apr 2025062.363.54$0
Mar 2025067.704.27$0
Feb 2025070.884.34$0
Jan 2025074.324.28$0
Dec 2024068.993.12$0
Nov 2024069.052.20$0
Oct 2024071.372.28$0
Sep 2024069.612.36$0
Aug 2024075.632.06$0
Jul 2024079.932.15$0
Jun 2024078.082.63$0
May 2024078.812.20$0
Apr 2024084.451.66$0
Mar 2024080.301.55$0
Feb 2024076.091.78$0
Jan 2024073.023.30$0
Dec 2023071.262.61$0
Nov 2023077.892.81$0
Oct 2023085.443.09$0
Sep 2023089.042.74$0
Aug 2023080.522.67$0
Jul 2023074.852.64$0
Jun 2023068.962.26$0
May 2023070.622.23$0
Apr 2023078.122.24$0
Mar 2023072.852.39$0
Feb 2023075.112.47$0
Jan 2023076.533.39$0
Dec 2022076.415.73$0
Nov 2022085.005.65$0
Oct 2022087.185.86$0
Sep 2022084.888.16$0
Aug 2022094.529.13$0
Jul 20220101.587.54$0
Jun 20220115.097.98$0
May 20220109.378.43$0
Apr 20220104.226.84$0
Mar 20220108.885.08$0
Feb 2022091.054.86$0
Jan 2022081.844.54$0
Dec 2021071.323.90$0
Nov 2021077.435.24$0
Oct 2021079.795.71$0
Sep 2021069.865.35$0
Aug 2021066.024.22$0
Jul 2021070.783.98$0
Jun 2021069.493.38$0
May 2021063.483.02$0
Apr 2021060.362.76$0
Mar 2021061.302.72$0
Feb 2021057.805.55$0
Jan 2021050.412.81$0
Dec 2020044.642.68$0
Nov 2020038.772.71$0
Oct 2020036.972.48$0
Sep 2020037.091.99$0
Aug 2020039.982.39$0
Jul 2020038.371.83$0
Jun 2020034.901.69$0
May 2020016.921.81$0
Apr 2020014.751.80$0
Mar 2020030.341.86$0
Feb 2020049.881.98$0
Jan 2020057.252.09$0
Dec 2019059.012.30$0
Nov 2019055.302.75$0
Oct 2019053.472.42$0
Sep 2019055.052.66$0
Aug 2019053.112.30$0
Jul 2019056.272.46$0
Jun 2019052.782.49$0
May 2019058.482.74$0
Apr 2019062.632.75$0
Mar 2019056.803.06$0
Feb 2019050.852.79$0
Jan 2019046.033.23$0
Dec 2018046.594.19$0
Nov 2018052.934.24$0
Oct 2018061.443.40$0
Sep 2018059.543.11$0
Aug 2018059.403.07$0
Jul 2018065.142.93$0
Jun 2018060.183.08$0
May 2018065.382.90$0
Apr 2018063.842.90$0
Mar 2018061.222.79$0
Feb 2018061.782.77$0
Jan 2018062.874.01$0
Dec 2017057.272.92$0
Nov 2017055.423.12$0
Oct 2017049.292.98$0
Sep 2017047.523.09$0
Aug 2017045.373.00$0
Jul 2017043.873.09$0
Jun 2017042.493.09$0
May 2017045.373.26$0
Apr 2017047.933.21$0
Mar 2017046.772.98$0
Feb 2017050.452.95$0
Jan 2017049.413.42$0
Dec 2016048.763.72$0
Nov 2016042.492.64$0
Oct 2016046.193.09$0
Sep 2016041.553.10$0
Aug 2016041.442.92$0
Jul 2016041.622.92$0
Jun 2016045.352.69$0
May 2016042.521.99$0
Apr 2016036.561.99$0
Mar 2016033.011.79$0
Feb 2016026.472.06$0
Jan 2016027.352.36$0
Dec 201580632.362.00$1,613
Nov 20151,30838.792.17$2,835
Oct 20151,79343.552.43$4,351
Sep 20151,37942.992.76$3,804
Aug 20151,39540.162.87$4,007
Jul 20151,39448.152.95$4,105
Jun 201597956.152.88$2,822
May 201597455.212.96$2,879
Apr 20151,47349.822.71$3,987
Mar 20151,50242.892.93$4,408
Feb 20151,36244.662.98$4,054
Jan 20151,51643.433.10$4,701
Dec 20141,55154.693.59$5,570
Nov 20141,91970.464.25$8,159
Oct 20141,67078.303.90$6,515
Sep 20141,50586.164.05$6,088
Aug 20141,71689.394.04$6,924
Jul 201432896.564.18$1,371
Jun 201473998.164.74$3,501
May 20141,54394.734.73$7,293
Apr 20141,56995.944.81$7,546
Mar 20141,59995.895.06$8,086
Feb 20141,42097.406.19$8,793
Jan 20141,58690.404.86$7,709
Dec 20131,53991.824.35$6,702
Nov 20131,35588.853.74$5,065
Oct 20131,57197.423.78$5,937
Sep 20131,208104.113.72$4,491
Aug 20131,390104.253.52$4,896
Jul 20131,395102.523.72$5,186
Jun 20131,34994.403.93$5,306
May 20131,43594.834.15$5,954
Apr 20131,32993.964.28$5,692
Mar 20131,42193.623.91$5,560
Feb 20131,32791.233.42$4,538
Jan 20131,47691.603.42$5,048
Dec 20121,23886.773.42$4,234
Nov 20121,41086.953.62$5,111
Oct 20121,42589.383.40$4,845
Sep 20121,31194.672.92$3,826
Aug 20121,37892.662.91$4,007
Jul 20121,34685.133.02$4,066
Jun 20121,27879.822.52$3,219
May 20121,42491.612.49$3,543
Apr 20121,360101.652.00$2,716
Mar 20121,542105.052.22$3,426
Feb 20121,495101.102.57$3,843
Jan 20121,60798.092.73$4,394
Dec 20111,58796.873.24$5,141
Nov 20111,55595.723.31$5,149
Oct 20111,68184.983.65$6,133
Sep 20111,54883.623.99$6,170
Aug 201185283.404.15$3,535
Jul 20111,56894.144.52$7,083
Jun 20111,48592.904.64$6,890
May 20111,53598.134.40$6,761
Apr 20111,145105.964.33$4,962
Mar 20113,37396.364.06$13,685
Feb 20112,59385.644.18$10,839
Jan 20113,46886.504.59$15,914
Dec 20104,39885.734.35$19,121
Nov 20104,54580.843.80$17,250
Oct 20105,29878.103.51$18,590
Sep 20102,13672.633.98$8,500
Aug 20102,32273.684.42$10,262
Jul 20102,38872.554.74$11,311
Jun 20102,09170.364.91$10,268
May 20102,22271.124.24$9,411
Apr 20102,17881.694.12$8,979
Mar 20102,41778.394.39$10,607
Feb 20102,21673.585.44$12,060
Jan 20102,40174.365.96$14,320
Dec 20092,40971.445.48$13,210
Nov 20092,82974.593.75$10,613
Oct 20091,58772.544.11$6,523
Sep 20092,79865.543.06$8,575
Aug 20092,91867.423.22$9,392
Jul 20093,80461.133.46$13,179
Jun 20092,58566.163.90$10,069
May 20093,30954.743.93$12,990
Apr 20092,83846.773.59$10,181
Mar 20092,77542.144.06$11,264
Feb 20092,46132.814.63$11,402
Jan 20092,70135.865.37$14,507
Dec 20083,07337.105.98$18,368
Nov 20083,07455.496.86$21,089
Oct 20083,48275.246.92$24,102
Sep 20083,327101.767.88$26,207
Aug 20083,823114.228.48$32,431
Jul 20082,960131.0811.39$33,713
Jun 20083,076131.3313.03$40,088
May 20083,330123.1711.57$38,542
Apr 20083,965110.3110.45$41,454
Mar 20085,619101.909.66$54,302
Feb 20083,65092.538.77$32,013
Jan 20088,17790.388.21$67,098
Dec 20079,89388.337.30$72,238

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Dec 2015 — as filed, then multipliedworked
Gas                  806 Mcf  × $  2.00 =     $1,613

────────────────────────────────────────────────────
Month total                                   $1,613

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 8A/G/233102 is the state's own key, not one this site invented.