DOUGHERTY, WILLIAM

Operated by BULLIN, R. E. OPERATING INC. (P-5 106531) in the LEEPER (GLORIETA) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 61642District 8AField 52916500Hydrogen sulphide fieldOilCasinghead gasSaveExport
Value, all time
$1.0 M
Jan 1993 – May 2026
Value, last 12 filed months
$19 k
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 54 leases and 438 wells, and the rule below applies to all of them.

Discovered
1958-04-08
as the register files it
Field class
Oil
the register's own label
Between wells
0 ft
minimum
From a lease line
440 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2019-08-20.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

The Commission's schedule remark for this field reads: WELL SPACING TO ZERO; PRORATION ACRES PLATS REQUIRED

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition21,035 bbl$970,369
Casinghead gasProduction11,524 Mcf$44,932
Total$1,015,301

829 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (2)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.4226, -102.3472. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.2 miles.

33.42256, -102.34724 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
50.0%
1 of 2 wells
With a plug date
50.0%
1 of 2 wells
Median depth
6,340 ft
2 wells filed one
Completion to plug
16.6 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
150.0%
A plug date is filed
150.0%
BothOn the schedule and plugged. Neither fact cancels the other.
150.0%
NeitherNo plug date, and not on the schedule.
150.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Between 6,000 and 6,680 ft, median 6,340 ft, over the 2 wells that filed a depth.

Completions filed
Apr 1976 – May 1976
2 of 2 wells
Plug dates filed
Nov 1992
1 of 2 wells; 1 filed none

Last completion to plug: a median of 16.6 years across the 1 well that filed both dates, with the middle half between 16.6 years and 16.6 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

2 wells

42-2193177526,000 ftMay 1976
42-2193176016,680 ftApr 1976Nov 1992Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 2026030106.413.05$91
Apr 2026783098.932.87$7,803
Mar 202603089.753.15$94
Feb 202603063.503.75$113
Jan 202603059.138.00$240
Dec 202503056.664.41$132
Nov 202503058.593.93$118
Oct 202503059.383.30$99
Sep 202503062.743.08$92
Aug 20251543063.933.01$9,936
Jul 202503066.743.32$99
Jun 202503066.483.13$94
May 202503060.553.23$97
Apr 202503062.363.54$106
Mar 202503067.704.27$128
Feb 202503070.884.34$130
Jan 20251683074.324.28$12,614
Dec 202403068.993.12$94
Nov 202403069.052.20$66
Oct 202403071.372.28$68
Sep 202403069.612.36$71
Aug 20241523075.632.06$11,558
Jul 202403079.932.15$64
Jun 202403078.082.63$79
May 202403078.812.20$66
Apr 20241653084.451.66$13,984
Mar 202403080.301.55$46
Feb 202403076.091.78$54
Jan 20241653073.023.30$12,147
Dec 202303071.262.61$78
Nov 202303077.892.81$84
Oct 202303085.443.09$93
Sep 20231783089.042.74$15,931
Aug 202303080.522.67$80
Jul 202303074.852.64$79
Jun 20231753068.962.26$12,136
May 202303070.622.23$67
Apr 202303078.122.24$67
Mar 20231703072.852.39$12,456
Feb 202303075.112.47$74
Jan 202303076.533.39$102
Dec 202203076.415.73$172
Nov 202203085.005.65$169
Oct 202203087.185.86$176
Sep 202203084.888.16$245
Aug 20221743094.529.13$16,720
Jul 2022030101.587.54$226
Jun 2022030115.097.98$239
May 2022030109.378.43$253
Apr 202217030104.226.84$17,923
Mar 2022030108.885.08$152
Feb 202203091.054.86$146
Jan 202203081.844.54$136
Dec 202103071.323.90$117
Nov 20211823077.435.24$14,249
Oct 202103079.795.71$171
Sep 202103069.865.35$161
Aug 20211743066.024.22$11,614
Jul 202103070.783.98$119
Jun 202103069.493.38$101
May 202103063.483.02$91
Apr 20211713060.362.76$10,404
Mar 202103061.302.72$82
Feb 202103057.805.55$166
Jan 202103050.412.81$84
Dec 202003044.642.68$80
Nov 202003038.772.71$81
Oct 202003036.972.48$74
Sep 20201623037.091.99$6,068
Aug 202003039.982.39$72
Jul 202003038.371.83$55
Jun 202003034.901.69$51
May 202009016.921.81$163
Apr 202003014.751.80$54
Mar 202003030.341.86$56
Feb 202003049.881.98$59
Jan 202003057.252.09$63
Dec 20191573059.012.30$9,334
Nov 201903055.302.75$83
Oct 20191673053.472.42$9,002
Sep 201903055.052.66$80
Aug 201903053.112.30$69
Jul 201903056.272.46$74
Jun 20191723052.782.49$9,153
May 201903058.482.74$82
Apr 201903062.632.75$83
Mar 20191693056.803.06$9,691
Feb 201903050.852.79$84
Jan 201903046.033.23$97
Dec 201803046.594.19$126
Nov 201803052.934.24$127
Oct 201803061.443.40$102
Sep 201803059.543.11$93
Aug 20181673059.403.07$10,012
Jul 201803065.142.93$88
Jun 201803060.183.08$92
May 201803065.382.90$87
Apr 20181703063.842.90$10,940
Mar 201803061.222.79$84
Feb 201803061.782.77$83
Jan 201803062.874.01$120
Dec 201703057.272.92$88
Nov 201703055.423.12$94
Oct 20171663049.292.98$8,272
Sep 201703047.523.09$93
Aug 201703045.373.00$90
Jul 20171743043.873.09$7,726
Jun 201703042.493.09$93
May 201703045.373.26$98
Apr 201703047.933.21$96
Mar 201703046.772.98$90
Feb 201703050.452.95$89
Jan 201703049.413.42$103
Dec 201603048.763.72$112
Nov 20161673042.492.64$7,175
Oct 201609046.193.09$278
Sep 201603041.553.10$93
Aug 201603041.442.92$88
Jul 201603041.622.92$88
Jun 20161653045.352.69$7,563
May 201603042.521.99$60
Apr 201603036.561.99$60
Mar 20161663033.011.79$5,533
Feb 201603026.472.06$62
Jan 201603027.352.36$71
Dec 201503032.362.00$60
Nov 201503038.792.17$65
Oct 20151663043.552.43$7,302
Sep 201503042.992.76$83
Aug 20151693040.162.87$6,873
Jul 201503048.152.95$88
Jun 201503056.152.88$86
May 201503055.212.96$89
Apr 201503049.822.71$81
Mar 20151723042.892.93$7,465
Feb 201503044.662.98$89
Jan 201503043.433.10$93
Dec 20141643054.693.59$9,077
Nov 201403070.464.25$128
Oct 201403078.303.90$117
Sep 201403086.164.05$121
Aug 201403089.394.04$121
Jul 20141663096.564.18$16,154
Jun 201403098.164.74$142
May 201403094.734.73$142
Apr 20141643095.944.81$15,878
Mar 201403095.895.06$152
Feb 201403097.406.19$186
Jan 201403090.404.86$146
Dec 20131643091.824.35$15,189
Nov 201303088.853.74$112
Oct 201303097.423.78$113
Sep 2013030104.113.72$112
Aug 201316830104.253.52$17,620
Jul 2013030102.523.72$112
Jun 201303094.403.93$118
May 20131683094.834.15$16,056
Apr 201303093.964.28$128
Mar 201303093.623.91$117
Feb 201303091.233.42$103
Jan 20131693091.603.42$15,583
Dec 201203086.773.42$103
Nov 201203086.953.62$109
Oct 20121683089.383.40$15,118
Sep 201203094.672.92$88
Aug 201203092.662.91$87
Jul 201203085.133.02$91
Jun 201203079.822.52$76
May 20121683091.612.49$15,465
Apr 2012030101.652.00$60
Mar 2012030105.052.22$67
Feb 201217230101.102.57$17,466
Jan 201203098.092.73$82
Dec 201103096.873.24$97
Nov 201103095.723.31$99
Oct 20111653084.983.65$14,131
Sep 201103083.623.99$120
Aug 201103083.404.15$124
Jul 20111693094.144.52$16,045
Jun 201103092.904.64$139
May 201103098.134.40$132
Apr 2011030105.964.33$130
Mar 20111693096.364.06$16,407
Feb 201103085.644.18$125
Jan 201103086.504.59$138
Dec 201003085.734.35$130
Nov 20101703080.843.80$13,857
Oct 201003078.103.51$105
Sep 201003072.633.98$119
Aug 20101733073.684.42$12,879
Jul 201003072.554.74$142
Jun 201003070.364.91$147
May 201003071.124.24$127
Apr 20101673081.694.12$13,766
Mar 201003078.394.39$132
Feb 201003073.585.44$163
Jan 20101703074.365.96$12,820
Dec 200903071.445.48$165
Nov 200903074.593.75$113
Oct 200903072.544.11$123
Sep 20091673065.543.06$11,037
Aug 200903067.423.22$97
Jul 200903061.133.46$104
Jun 20091803066.163.90$12,026
May 200903054.743.93$118
Apr 200903046.773.59$108
Mar 200903042.144.06$122
Feb 20091523032.814.63$5,126
Jan 200903035.865.37$161
Dec 20081653037.105.98$6,301
Nov 200803055.496.86$206
Oct 200803075.246.92$208
Sep 2008030101.767.88$236
Aug 2008030114.228.48$254
Jul 200817130131.0811.39$22,756
Jun 2008030131.3313.03$391
May 2008030123.1711.57$347
Apr 200816530110.3110.45$18,515
Mar 2008030101.909.66$290
Feb 200803092.538.77$263
Jan 20081643090.388.21$15,068
Dec 200703088.337.30$219
Nov 200703091.677.29$219
Oct 200703082.856.92$208
Sep 20071613075.846.24$12,398
Aug 20071713069.066.39$12,001
Jul 200703070.906.39$192
Jun 200703062.007.55$226
May 200703058.747.85$235
Apr 200703059.617.81$234
Mar 20071643056.927.30$9,554
Feb 200703055.108.22$246
Jan 200703050.306.73$202
Dec 20061543056.656.92$8,932
Nov 200603054.207.62$229
Oct 200603054.906.01$180
Sep 20061633060.085.04$9,944
Aug 200603068.717.34$220
Jul 200603069.376.34$190
Jun 20061703066.286.38$11,459
May 200603066.016.42$193
Apr 200603064.397.36$221
Mar 20061633056.707.08$9,455
Feb 200603057.597.75$233
Jan 200603060.598.93$268
Dec 20051663054.9413.42$9,523
Nov 200503054.6910.59$318
Oct 200503058.3413.80$414
Sep 20051503061.4512.08$9,580
Aug 200503061.519.80$294
Jul 200503055.697.84$235
Jun 20051623052.337.38$8,699
May 200503045.226.65$200
Apr 200503049.207.36$221
Mar 20051343050.377.15$6,964
Feb 200503045.226.31$189
Jan 20051583043.166.32$7,009
Dec 200403039.866.75$203
Nov 200403045.286.33$190
Oct 20041523049.706.52$7,750
Sep 200403043.245.28$159
Aug 20041673042.375.55$7,242
Jul 200403038.286.08$183
Jun 200403036.106.43$193
May 20041553037.486.49$6,004
Apr 200403034.475.86$176
Mar 200403034.365.53$166
Feb 20041793032.455.51$5,974
Jan 200403032.036.30$189
Dec 200303030.266.30$189
Nov 20031743028.804.60$5,149
Oct 200303028.174.76$143
Sep 200303026.314.75$142
Aug 20031781529.765.13$5,374
Jul 200303029.415.17$155
Jun 200303028.565.98$179
May 20031653026.595.97$4,567
Apr 200303026.675.41$162
Mar 20031713031.146.10$5,508
Feb 200303033.487.93$238
Jan 20031543030.315.58$4,835
Dec 200203026.914.85$146
Nov 20021703024.664.14$4,316
Oct 200203026.464.23$127
Sep 200203027.443.64$109
Aug 20021763025.963.16$4,664
Jul 200203024.583.06$92
Jun 200203023.733.34$100
May 20021353024.663.58$3,437
Apr 20021673023.653.51$4,055
Mar 200203022.003.10$93
Feb 20021743018.222.38$3,242
Jan 200203017.172.38$71
Dec 20011773016.932.36$3,068
Nov 200103018.072.41$72
Oct 20011773019.782.53$3,577
Sep 200103024.262.25$68
Aug 200103024.873.05$92
Jul 20011493023.933.20$3,661
Jun 200103024.563.82$115
May 20011463025.524.31$3,855
Apr 20011613024.685.34$4,134
Mar 200103024.545.38$161
Feb 200103027.755.77$173
Jan 20011823027.478.40$5,252
Dec 200003026.889.12$274
Nov 20001503032.215.66$5,001
Oct 200003031.235.15$154
Sep 200003031.875.19$156
Aug 20001543029.644.54$4,701
Jul 200003028.534.09$123
Jun 20001703029.304.40$5,113
May 200003027.263.68$110
Apr 20001683024.513.12$4,211
Mar 200003028.422.86$86
Feb 200003027.622.73$82
Jan 20001593025.272.48$4,092
Dec 199903024.282.42$73
Nov 19991723023.192.43$4,062
Oct 199903020.982.80$84
Sep 199903021.752.62$79
Aug 19991803019.262.88$3,553
Jul 199903017.892.37$71
Jun 19991713015.942.36$2,797
May 199903015.792.32$70
Apr 199903015.102.21$66
Mar 19991713012.471.84$2,188
Feb 19990309.981.82$55
Jan 19991833010.381.90$1,957
Dec 19980309.201.77$53
Nov 19981663010.892.19$1,873
Oct 199803012.421.97$59
Sep 199803012.592.08$62
Aug 19981753011.301.91$2,035
Jul 199803011.742.24$67
Jun 199803011.242.24$67
May 19981753012.622.21$2,275
Apr 199803013.042.51$75
Mar 19981703012.802.31$2,245
Feb 199803013.952.30$69
Jan 19981663014.702.15$2,505
Dec 199703016.322.41$72
Nov 199703018.193.09$93
Oct 19971653019.253.15$3,271
Sep 199703017.742.95$89
Aug 19971763017.862.55$3,220
Jul 199703017.582.25$67
Jun 19971663017.242.26$2,930
May 199703018.972.31$69
Apr 19971713017.882.08$3,120
Mar 199703018.951.94$58
Feb 199703020.492.21$66
Jan 19971673023.483.54$4,027
Dec 199603023.32$0
Nov 19961563021.97$3,427
Oct 199603023.31$0
Sep 19961603022.22$3,555
Aug 199603020.26$0
Jul 19961753019.55$3,421
Jun 199603018.73$0
May 199603019.43$0
Apr 19961583021.51$3,399
Mar 199603019.38$0
Feb 19961643016.98$2,785
Jan 199603017.07$0
Dec 19951683017.19$2,888
Nov 199503016.00$0
Oct 19951763015.43$2,716
Sep 199503016.18$0
Aug 19951563015.92$2,484
Jul 199501515.24$0
Jun 199503016.41$0
May 19951543017.56$2,704
Apr 199503017.73$0
Mar 19951663016.44$2,729
Feb 199501516.58$0
Jan 19951831515.92$2,913
Dec 199401515.03$0
Nov 199403015.90$0
Oct 19941643015.58$2,555
Sep 199403015.29$0
Aug 19941523016.13$2,452
Jul 19940117.56$0
Jun 1994159117.09$2,717
May 19940115.88$0
Apr 1994154114.14$2,178
Mar 19940112.46$0
Feb 1994156112.50$1,950
Jan 19940112.66$0
Dec 1993166112.33$2,047
Nov 19930114.49$0
Oct 1993173115.85$2,742
Sep 19930115.03$0
Aug 1993175115.66$2,741
Jul 19930115.46$0
Jun 1993177116.79$2,972
May 19930117.68$0
Apr 1993166118.05$2,996
Mar 19930118.14$0
Feb 1993174117.90$3,115
Jan 19930116.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Oil                    0 bbl  × $106.41 =         $0
Casinghead gas        30 Mcf  × $  3.05 =        $91

────────────────────────────────────────────────────
Month total                                      $91

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 8A/O/61642 is the state's own key, not one this site invented.