JOHNSON (MCELHONE 1) #24-1
API 3507101471 · Kay County, Oklahoma
Completion
Oklahoma files 1 completion report for this well.
Completion 2
STRAIGHT HOLEACDRYIntervals
| Formation | Produced | Perforated (ft) |
|---|---|---|
| MISSISSIPPI CHAT | DRY | 3,716–3,726 |
| VIOLA | DRY | 3,840–3,911 |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| CONDUCTOR | 10.75 | — | — | 108 | 240 |
| PRODUCTION | 7 | 23 | — | 4,200 | 490 |
Drilling permits
Oklahoma files 2 applications to drill this well, naming 20 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2011-11-04
WRAREStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| NEVA | 900 |
| HOOVER | 2,094 |
| HOGSHOOTER | 3,084 |
| CHECKERBOARD | 3,170 |
| CLEVELAND | 3,200 |
| BIG LIME | 3,286 |
| MISSISSIPPI CHAT | 3,708 |
| MISSISSIPPI LM | 3,745 |
| SIMPSON | 4,032 |
| ARBUCKLE | 4,177 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2011-11-04
WRAAMStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| NEVA | 900 |
| HOOVER | 2,094 |
| HOGSHOOTER | 3,084 |
| CLEVELAND | 3,200 |
| BIG LIME | 3,286 |
| MISSISSIPPI CHAT | 3,708 |
| MISSISSIPPI LM | 3,745 |
| SIMPSON | 4,032 |
| VIOLA | 4,036 |
| ARBUCKLE | 4,177 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
36.897131, -97.139560
Every well in Kay County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.