HEFLEY

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 197730District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$4.0 M
Sep 2003 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
273
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112004-01-12154053
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition6,316 bbl$329,887
GasProduction612,110 Mcf$3,669,491
Total$3,999,379

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6690, -100.2846. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.66899, -100.28460 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
11,885 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,885 ft.

Completions filed
Sep 2003
1 of 1 wells

1 well

42-211326974111P11,885 ftSep 2003

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (273)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

273 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 202321085.443.09$1,794
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 201637048.763.72$1,804
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 201501,34056.152.88$3,863
May 201501,73855.212.96$5,137
Apr 201551,66949.822.71$4,766
Mar 201501,66142.892.93$4,875
Feb 201501,41944.662.98$4,223
Jan 201501,11943.433.10$3,470
Dec 201401,60254.693.59$5,753
Nov 201401,45370.464.25$6,178
Oct 201401,57678.303.90$6,148
Sep 20141841,48086.164.05$21,841
Aug 201401,41589.394.04$5,710
Jul 201401,63996.564.18$6,850
Jun 201401,13698.164.74$5,381
May 201401,06394.734.73$5,024
Apr 2014082895.944.81$3,982
Mar 201401,25395.895.06$6,336
Feb 201401,27497.406.19$7,889
Jan 201401,11890.404.86$5,434
Dec 201301,52191.824.35$6,623
Nov 201301,79888.853.74$6,721
Oct 201301,95997.423.78$7,404
Sep 201301,902104.113.72$7,071
Aug 201312,032104.253.52$7,262
Jul 201302,029102.523.72$7,543
Jun 20131931,96994.403.93$25,964
May 201321,96794.834.15$8,351
Apr 201321,87293.964.28$8,205
Mar 201311,70693.623.91$6,769
Feb 201331,49891.233.42$5,397
Jan 201381,81591.603.42$6,940
Dec 201201,82986.773.42$6,255
Nov 201202,04086.953.62$7,395
Oct 201202,12489.383.40$7,221
Sep 201201,95294.672.92$5,697
Aug 201242,17592.662.91$6,696
Jul 201202,14285.133.02$6,471
Jun 201222,08679.822.52$5,414
May 201222,15291.612.49$5,538
Apr 201202,060101.652.00$4,113
Mar 201202,005105.052.22$4,455
Feb 201201,947101.102.57$5,004
Jan 201202,12398.092.73$5,804
Dec 201102,14796.873.24$6,956
Nov 201102,00095.723.31$6,623
Oct 201102,23284.983.65$8,144
Sep 201102,16583.623.99$8,629
Aug 201102,06183.404.15$8,552
Jul 201102,33594.144.52$10,548
Jun 201102,29092.904.64$10,625
May 20111812,41298.134.40$28,386
Apr 201102,233105.964.33$9,676
Mar 201102,15196.364.06$8,727
Feb 201101,87685.644.18$7,842
Jan 201102,42986.504.59$11,146
Dec 201002,50485.734.35$10,887
Nov 201002,55880.843.80$9,708
Oct 201002,60178.103.51$9,127
Sep 201002,61072.633.98$10,386
Aug 201002,59773.684.42$11,477
Jul 201002,55372.554.74$12,092
Jun 201002,67770.364.91$13,145
May 20101612,78371.124.24$23,237
Apr 201002,62281.694.12$10,810
Mar 201002,53778.394.39$11,134
Feb 201002,12973.585.44$11,587
Jan 201002,69474.365.96$16,067
Dec 200902,76471.445.48$15,157
Nov 200902,92474.593.75$10,969
Oct 200903,06172.544.11$12,581
Sep 200903,02265.543.06$9,262
Aug 200903,19767.423.22$10,290
Jul 200903,14361.133.46$10,889
Jun 20091853,23666.163.90$24,844
May 200903,30954.743.93$12,990
Apr 200902,41546.773.59$8,664
Mar 200902,51742.144.06$10,217
Feb 200902,78532.814.63$12,903
Jan 200902,87235.865.37$15,426
Dec 200803,30537.105.98$19,754
Nov 200803,34755.496.86$22,962
Oct 200803,56675.246.92$24,684
Sep 20081833,520101.767.88$46,349
Aug 200803,698114.228.48$31,370
Jul 200803,717131.0811.39$42,335
Jun 200803,399131.3313.03$44,298
May 200803,407123.1711.57$39,434
Apr 200803,380110.3110.45$35,337
Mar 200803,268101.909.66$31,582
Feb 200803,06692.538.77$26,891
Jan 20081783,79190.388.21$47,196
Dec 200703,90688.337.30$28,521
Nov 200703,80191.677.29$27,716
Oct 200703,55582.856.92$24,608
Sep 200703,72075.846.24$23,228
Aug 20071873,91569.066.39$37,923
Jul 200704,09170.906.39$26,133
Jun 200704,00462.007.55$30,224
May 200704,14958.747.85$32,554
Apr 20071844,05959.617.81$42,650
Mar 200704,34456.927.30$31,720
Feb 200703,57155.108.22$29,339
Jan 200703,61950.306.73$24,344
Dec 200604,48256.656.92$31,008
Nov 200604,77054.207.62$36,335
Oct 20061905,06054.906.01$40,861
Sep 200604,66060.085.04$23,473
Aug 200604,55868.717.34$33,455
Jul 200604,75269.376.34$30,141
Jun 20061694,88466.286.38$42,380
May 200605,08466.016.42$32,665
Apr 20061824,96564.397.36$48,264
Mar 200605,25556.707.08$37,221
Feb 200604,54057.597.75$35,190
Jan 20061935,19360.598.93$58,085
Dec 200505,09854.9413.42$68,392
Nov 200505,28354.6910.59$55,939
Oct 200505,70658.3413.80$78,719
Sep 20051645,64461.4512.08$78,252
Aug 200505,98161.519.80$58,595
Jul 200506,25655.697.84$49,070
Jun 20051856,33052.337.38$56,403
May 200586,48445.226.65$43,488
Apr 20051616,77549.207.36$57,788
Mar 200507,21450.377.15$51,615
Feb 20053726,60945.226.31$58,537
Jan 200507,20543.166.32$45,551
Dec 200428,13739.866.75$55,013
Nov 20041869,68645.286.33$69,739
Oct 200409,56849.706.52$62,336
Sep 20041839,34543.245.28$57,291
Aug 20041888,81042.375.55$56,867
Jul 20041849,02438.286.08$61,947
Jun 200407,61036.106.43$48,955
May 20041949,34137.486.49$67,937
Apr 200419310,41634.475.86$67,674
Mar 200418411,76434.365.53$71,379
Feb 200418712,19632.455.51$73,263
Jan 200418514,59132.036.30$97,844
Dec 200318616,80630.266.30$111,534
Nov 200337120,52528.804.60$105,000
Oct 200335929,35528.174.76$149,832
Sep 200336640,02326.314.75$199,713

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2023 — as filed, then multipliedworked
Condensate            21 bbl  × $ 85.44 =     $1,794
Gas                    0 Mcf  × $  3.09 =         $0

────────────────────────────────────────────────────
Month total                                   $1,794

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/197730 is the state's own key, not one this site invented.