HEFLEY

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 223317District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$3.1 M
Mar 2006 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
243
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-01-09171842
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition6,138 bbl$426,822
GasProduction499,901 Mcf$2,670,104
Total$3,096,926

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6669, -100.2833. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.66689, -100.28333 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
11,895 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,895 ft.

Completions filed
Mar 2006
1 of 1 wells

1 well

42-211335194127P11,895 ftMar 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (243)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

243 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 202310085.443.09$854
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 2019038456.272.46$945
Jun 2019037252.782.49$927
May 2019038458.482.74$1,052
Apr 20196437262.632.75$5,032
Mar 201901,02156.803.06$3,126
Feb 2019077050.852.79$2,150
Jan 2019038446.033.23$1,240
Dec 2018071946.594.19$3,009
Nov 201801,22652.934.24$5,195
Oct 201801,12961.443.40$3,836
Sep 201801,51059.543.11$4,693
Aug 201801,50159.403.07$4,603
Jul 201801,58365.142.93$4,641
Jun 201801,61260.183.08$4,960
May 201811,36165.382.90$4,013
Apr 201801,53363.842.90$4,447
Mar 201801,31961.222.79$3,676
Feb 201811,25961.782.77$3,544
Jan 201811,39562.874.01$5,656
Dec 2017691,77557.272.92$9,137
Nov 201711,71455.423.12$5,400
Oct 201701,59549.292.98$4,759
Sep 201701,45747.523.09$4,498
Aug 201701,55645.373.00$4,675
Jul 201711,86143.873.09$5,789
Jun 201731,82442.493.09$5,759
May 201721,72245.373.26$5,710
Apr 201711,57247.933.21$5,097
Mar 201771,61346.772.98$5,140
Feb 20171861,38650.452.95$13,476
Jan 201701,30049.413.42$4,444
Dec 201601,69848.763.72$6,321
Nov 201601,40342.492.64$3,710
Oct 201601,46146.193.09$4,515
Sep 201601,30041.553.10$4,031
Aug 201601,44141.442.92$4,214
Jul 201601,41641.622.92$4,141
Jun 201601,35545.352.69$3,639
May 201601,29542.521.99$2,578
Apr 201601,21236.561.99$2,413
Mar 201601,53533.011.79$2,754
Feb 201601,45326.472.06$2,998
Jan 201601,65027.352.36$3,901
Dec 201501,61832.362.00$3,238
Nov 201501,65838.792.17$3,593
Oct 201501,77843.552.43$4,314
Sep 201501,73242.992.76$4,778
Aug 20151931,82640.162.87$12,996
Jul 201501,65448.152.95$4,871
Jun 201501,39956.152.88$4,033
May 201501,84655.212.96$5,456
Apr 201501,76649.822.71$4,780
Mar 201501,77242.892.93$5,200
Feb 201501,94144.662.98$5,777
Jan 201501,73743.433.10$5,386
Dec 201401,76754.693.59$6,346
Nov 201401,71570.464.25$7,292
Oct 201401,84878.303.90$7,209
Sep 201401,76086.164.05$7,120
Aug 201401,90789.394.04$7,695
Jul 201401,93396.564.18$8,079
Jun 201411,76398.164.74$8,449
May 201401,85094.734.73$8,744
Apr 20141851,83095.944.81$26,550
Mar 201401,73195.895.06$8,753
Feb 201401,27197.406.19$7,870
Jan 201401,34990.404.86$6,557
Dec 201301,95591.824.35$8,513
Nov 201301,98688.853.74$7,424
Oct 201302,08997.423.78$7,895
Sep 201302,102104.113.72$7,815
Aug 201312,160104.253.52$7,713
Jul 201302,194102.523.72$8,157
Jun 20131832,14994.403.93$25,728
May 201322,16894.834.15$9,185
Apr 201322,14793.964.28$9,383
Mar 201312,08493.623.91$8,248
Feb 201311,72591.233.42$5,991
Jan 2013111,93691.603.42$7,629
Dec 201202,02086.773.42$6,909
Nov 201212,22486.953.62$8,149
Oct 201202,35189.383.40$7,993
Sep 201202,15094.672.92$6,275
Aug 201242,43492.662.91$7,449
Jul 201202,43785.133.02$7,362
Jun 201222,39879.822.52$6,200
May 201222,47391.612.49$6,337
Apr 201202,233101.652.00$4,459
Mar 20121872,363105.052.22$24,895
Feb 201202,219101.102.57$5,703
Jan 201202,39898.092.73$6,556
Dec 201102,46196.873.24$7,973
Nov 201102,30495.723.31$7,629
Oct 201102,50784.983.65$9,147
Sep 201102,44983.623.99$9,761
Aug 201102,15383.404.15$8,933
Jul 201102,63694.144.52$11,907
Jun 201102,55692.904.64$11,860
May 20111942,71798.134.40$31,005
Apr 201102,601105.964.33$11,271
Mar 201102,41796.364.06$9,807
Feb 201102,16285.644.18$9,037
Jan 201102,74986.504.59$12,615
Dec 201002,82385.734.35$12,274
Nov 201002,91680.843.80$11,067
Oct 201002,99978.103.51$10,523
Sep 201002,97072.633.98$11,819
Aug 201003,01173.684.42$13,307
Jul 201002,96772.554.74$14,053
Jun 20101773,05970.364.91$27,475
May 201003,25771.124.24$13,794
Apr 201003,19581.694.12$13,172
Mar 201003,25778.394.39$14,294
Feb 201002,70473.585.44$14,716
Jan 201003,22674.365.96$19,240
Dec 20091663,20071.445.48$29,407
Nov 200903,51474.593.75$13,183
Oct 200903,74172.544.11$15,376
Sep 200903,75165.543.06$11,496
Aug 200903,91367.423.22$12,594
Jul 200904,03561.133.46$13,979
Jun 200904,06366.163.90$15,825
May 20091774,29154.743.93$26,534
Apr 200904,19346.773.59$15,042
Mar 200904,43242.144.06$17,989
Feb 200904,31832.814.63$20,005
Jan 20091625,01935.865.37$32,766
Dec 200806,39237.105.98$38,206
Nov 200802,95655.496.86$20,279
Oct 2008011375.246.92$782
Sep 200816577101.767.88$17,397
Aug 20080285114.228.48$2,418
Jul 200802,401131.0811.39$27,346
Jun 200803,765131.3313.03$49,068
May 200804,008123.1711.57$46,390
Apr 200803,478110.3110.45$36,362
Mar 20081803,664101.909.66$53,751
Feb 200802,67892.538.77$23,488
Jan 20081723,67590.388.21$45,701
Dec 200703,78988.337.30$27,667
Nov 200704,36191.677.29$31,799
Oct 20071804,90082.856.92$48,831
Sep 200704,75175.846.24$29,666
Aug 20073644,62269.066.39$54,663
Jul 200704,79570.906.39$30,630
Jun 200705,37362.007.55$40,558
May 20071876,13258.747.85$59,098
Apr 200706,38759.617.81$49,852
Mar 200703,00956.927.30$21,972
Feb 20071706,24155.108.22$60,643
Jan 200707,27150.306.73$48,911
Dec 20061708,02956.656.92$65,179
Nov 20061818,45954.207.62$74,246
Oct 20061809,53554.906.01$67,224
Sep 200618810,13460.085.04$62,342
Aug 200617711,87468.717.34$99,316
Jul 200618212,81269.376.34$93,889
Jun 200654413,36366.286.38$121,364
May 200636717,35566.016.42$135,732
Apr 200673227,89664.397.36$252,461
Mar 2006020,48156.707.08$145,065

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2023 — as filed, then multipliedworked
Condensate            10 bbl  × $ 85.44 =       $854
Gas                    0 Mcf  × $  3.09 =         $0

────────────────────────────────────────────────────
Month total                                     $854

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/223317 is the state's own key, not one this site invented.