JOHNSON, L.A.

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 215688District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$3.6 M
Feb 2006 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
244
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-09-15169394
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition8,859 bbl$591,786
GasProduction479,203 Mcf$3,002,126
Total$3,593,913

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6275, -100.3286. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.62750, -100.32860 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
13,500 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 13,500 ft.

Completions filed
Feb 2006
1 of 1 wells

1 well

42-21133465145913,500 ftFeb 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (244)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

244 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 2018135061.443.40$8,294
Sep 20180059.543.11$0
Aug 20180159.403.07$3
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20171355.423.12$65
Oct 2017102,00849.292.98$6,484
Sep 20171972,10747.523.09$15,866
Aug 201702,23345.373.00$6,709
Jul 201701,89043.873.09$5,835
Jun 201701,80842.493.09$5,582
May 20171891,83145.373.26$14,550
Apr 201701,94147.933.21$6,234
Mar 201702,10346.772.98$6,275
Feb 201701,74950.452.95$5,164
Jan 20171891,51549.413.42$14,518
Dec 201601,32448.763.72$4,929
Nov 201601,04142.492.64$2,753
Oct 201601,06446.193.09$3,288
Sep 2016094341.553.10$2,924
Aug 201601,04341.442.92$3,050
Jul 20161921,05541.622.92$11,076
Jun 2016095245.352.69$2,557
May 201601,00742.521.99$2,005
Apr 201601,10136.561.99$2,192
Mar 20161931,18233.011.79$8,491
Feb 201601,15626.472.06$2,386
Jan 20161631,42227.352.36$7,820
Dec 20151401,23632.362.00$7,004
Nov 201501,28838.792.17$2,792
Oct 201501,52843.552.43$3,708
Sep 201501,77742.992.76$4,902
Aug 201502,26140.162.87$6,495
Jul 201503,03948.152.95$8,950
Jun 201503,67556.152.88$10,595
May 2015013155.212.96$387
Apr 2015011649.822.71$314
Mar 2015014342.892.93$420
Feb 2015074344.662.98$2,211
Jan 201501,39043.433.10$4,310
Dec 2014011054.693.59$395
Nov 201405970.464.25$251
Oct 201404078.303.90$156
Sep 2014017186.164.05$692
Aug 2014714089.394.04$6,508
Jul 201408896.564.18$368
Jun 2014011898.164.74$559
May 2014014094.734.73$662
Apr 2014020695.944.81$991
Mar 201408695.895.06$435
Feb 2014030597.406.19$1,889
Jan 2014022290.404.86$1,079
Dec 2013032691.824.35$1,420
Nov 201309688.853.74$359
Oct 2013027197.423.78$1,024
Sep 20130344104.113.72$1,279
Aug 20130347104.253.52$1,222
Jul 201310350102.523.72$2,326
Jun 20136934794.403.93$7,878
May 2013014494.834.15$597
Apr 201305893.964.28$248
Mar 2013010293.623.91$399
Feb 201301491.233.42$48
Jan 20131115491.603.42$10,352
Dec 201202986.773.42$99
Nov 2012010786.953.62$388
Oct 201205689.383.40$190
Sep 20120394.672.92$9
Aug 201202892.662.91$81
Jul 201209485.133.02$284
Jun 20123317979.822.52$3,085
May 20126919591.612.49$6,806
Apr 20120145101.652.00$290
Mar 20121285105.052.22$738
Feb 20121102101.102.57$363
Jan 2012272298.092.73$2,170
Dec 20115267496.873.24$7,221
Nov 2011277895.723.31$2,768
Oct 2011462684.983.65$2,624
Sep 2011556383.623.99$2,662
Aug 20114173983.404.15$6,486
Jul 2011354694.144.52$2,749
Jun 201171,62592.904.64$8,190
May 20114585598.134.40$8,182
Apr 2011864,763105.964.33$29,752
Mar 201101,15696.364.06$4,690
Feb 201101,31885.644.18$5,509
Jan 2011932,02786.504.59$17,346
Dec 201002,05785.734.35$8,943
Nov 2010781,97480.843.80$13,798
Oct 201012,14278.103.51$7,594
Sep 201002,17472.633.98$8,651
Aug 201002,03073.684.42$8,971
Jul 2010692,17172.554.74$15,289
Jun 201062,26670.364.91$11,549
May 2010842,38671.124.24$16,079
Apr 201022,38181.694.12$9,980
Mar 2010711,82778.394.39$13,584
Feb 201011,81073.585.44$9,924
Jan 2010822,42774.365.96$20,572
Dec 200952,30771.445.48$13,008
Nov 2009772,10174.593.75$13,625
Oct 200942,77172.544.11$11,680
Sep 2009742,78665.543.06$13,388
Aug 200903,09967.423.22$9,974
Jul 2009723,19461.133.46$15,467
Jun 2009123,07866.163.90$12,783
May 2009213,13754.743.93$13,465
Apr 2009893,05146.773.59$15,108
Mar 2009162,34742.144.06$10,201
Feb 2009792,60332.814.63$14,652
Jan 200973,70535.865.37$20,151
Dec 2008932,38837.105.98$17,724
Nov 2008933,44955.496.86$28,822
Oct 20081043,26275.246.92$30,404
Sep 2008803,580101.767.88$36,341
Aug 2008623,822114.228.48$39,504
Jul 20081033,703131.0811.39$55,676
Jun 2008633,670131.3313.03$56,104
May 2008693,936123.1711.57$54,055
Apr 2008954,372110.3110.45$56,188
Mar 20081434,372101.909.66$56,823
Feb 20082445,01692.538.77$66,571
Jan 20082415,45490.388.21$66,536
Dec 20072236,38088.337.30$66,284
Nov 2007546,88391.677.29$55,139
Oct 2007566,69082.856.92$50,948
Sep 2007506,23875.846.24$42,743
Aug 2007796,76969.066.39$48,696
Jul 2007646,90970.906.39$48,672
Jun 2007587,85562.007.55$62,889
May 2007467,35958.747.85$60,443
Apr 20071058,16859.617.81$70,012
Mar 200715110,24256.927.30$83,382
Feb 20072899,29455.108.22$92,283
Jan 20075510,99850.306.73$76,748
Dec 200625412,05956.656.92$97,819
Nov 200629911,62654.207.62$104,767
Oct 200610513,24254.906.01$85,399
Sep 20068812,78660.085.04$69,693
Aug 20069216,10768.717.34$124,545
Jul 200614015,48569.376.34$107,929
Jun 200611616,41866.286.38$112,499
May 200620722,29166.016.42$156,884
Apr 200688333,34664.397.36$302,299
Mar 20061,04749,13056.707.08$407,349
Feb 2006444,62157.597.75$38,352

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2018 — as filed, then multipliedworked
Condensate           135 bbl  × $ 61.44 =     $8,294
Gas                    0 Mcf  × $  3.40 =         $0

────────────────────────────────────────────────────
Month total                                   $8,294

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/215688 is the state's own key, not one this site invented.