Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 228753District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$3.0 M
May 2007 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
229
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-07-23176755
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition10,283 bbl$741,339
GasProduction462,181 Mcf$2,282,223
Total$3,023,562

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6253, -100.3286. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.62528, -100.32863 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
13,470 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 13,470 ft.

Completions filed
Jan 2013
1 of 1 wells

1 well

42-211337281559A13,470 ftJan 2013

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (229)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

229 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20215069.865.35$349
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 202195069.493.38$6,602
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 2020072634.901.69$1,227
May 202001,09616.921.81$1,989
Apr 2020098514.751.80$1,777
Mar 2020050330.341.86$934
Feb 2020962,04449.881.98$8,837
Jan 20201072,39157.252.09$11,134
Dec 201903,01659.012.30$6,950
Nov 20191092,50155.302.75$12,907
Oct 201901,92353.472.42$4,651
Sep 201901,92255.052.66$5,107
Aug 20191411,64553.112.30$11,279
Jul 2019053656.272.46$1,319
Jun 2019044052.782.49$1,096
May 20191511,15558.482.74$11,996
Apr 201911,63062.632.75$4,546
Mar 201991,13956.803.06$3,999
Feb 20191581,10250.852.79$11,111
Jan 2019111,75746.033.23$6,178
Dec 201841,16846.594.19$5,075
Nov 20181521,76152.934.24$15,507
Oct 201882,18261.443.40$7,906
Sep 201802,79359.543.11$8,681
Aug 201892,73659.403.07$8,925
Jul 2018992,15065.142.93$12,752
Jun 20181212,35560.183.08$14,528
May 2018282,12265.382.90$7,986
Apr 2018901,72163.842.90$10,738
Mar 20181222,18461.222.79$13,555
Feb 2018311,60161.782.77$6,344
Jan 2018371,50362.874.01$8,352
Dec 20172388857.272.92$3,912
Nov 20171012,29755.423.12$12,760
Oct 2017132,79249.292.98$8,971
Sep 2017762,88347.523.09$12,512
Aug 2017183,03145.373.00$9,923
Jul 2017913,13443.873.09$13,668
Jun 2017231,87942.493.09$6,778
May 2017851,40545.373.26$8,442
Apr 2017261,79347.933.21$7,005
Mar 20171042,83646.772.98$13,326
Feb 2017323,05850.452.95$10,643
Jan 2017312,95749.413.42$11,641
Dec 2016922,52448.763.72$13,882
Nov 2016311,88342.492.64$6,297
Oct 2016501,77546.193.09$7,795
Sep 2016241,00141.553.10$4,101
Aug 2016055941.442.92$1,635
Jul 20166454041.622.92$4,243
Jun 2016055045.352.69$1,477
May 2016045042.521.99$896
Apr 2016073836.561.99$1,469
Mar 2016682,02733.011.79$5,881
Feb 2016692,47226.472.06$6,928
Jan 201622,57427.352.36$6,141
Dec 201562,45232.362.00$5,102
Nov 2015673,01338.792.17$9,129
Oct 2015693,32543.552.43$11,073
Sep 201553,13542.992.76$8,863
Aug 2015641,68040.162.87$7,396
Jul 201545448.152.95$352
Jun 2015712,26856.152.88$10,525
May 2015653,45355.212.96$13,794
Apr 2015793,57549.822.71$13,612
Mar 2015793,36242.892.93$13,255
Feb 201562,98244.662.98$9,143
Jan 20151481,89043.433.10$12,288
Dec 201422,25154.693.59$8,194
Nov 2014712,85470.464.25$17,137
Oct 20141373,45578.303.90$24,205
Sep 201475,88486.164.05$24,406
Aug 20141508,78589.394.04$48,857
Jul 2014177,61096.564.18$33,448
Jun 2014956,04998.164.74$37,979
May 2014245,02794.734.73$26,034
Apr 2014885,29095.944.81$33,883
Mar 2014906,57195.895.06$41,858
Feb 201403,82097.406.19$23,653
Jan 2014954,73990.404.86$31,623
Dec 201303,82391.824.35$16,647
Nov 2013933,73888.853.74$22,237
Oct 2013484,34397.423.78$21,090
Sep 2013515,596104.113.72$26,114
Aug 20131014,532104.253.52$26,494
Jul 201305,778102.523.72$21,481
Jun 20131154,14494.403.93$27,156
May 20131212,43494.834.15$21,573
Apr 20131551,30193.964.28$20,135
Mar 20131821,59593.623.91$23,280
Feb 201381,33791.233.42$5,302
Jan 20131041,49791.603.42$14,646
Dec 201211,60886.773.42$5,586
Nov 201201,64686.953.62$5,967
Oct 201211,47489.383.40$5,101
Sep 20120094.672.92$0
Aug 2012045792.662.91$1,329
Jul 201201,55385.133.02$4,691
Jun 201201,41579.822.52$3,564
May 20121031,57191.612.49$13,345
Apr 201211,653101.652.00$3,402
Mar 201211,619105.052.22$3,703
Feb 20122899101.102.57$2,513
Jan 201211,55098.092.73$4,336
Dec 201101,64196.873.24$5,316
Nov 2011661,53295.723.31$11,390
Oct 2011184884.983.65$3,179
Sep 2011081383.623.99$3,240
Aug 2011170583.404.15$3,009
Jul 2011181594.144.52$3,776
Jun 201111,24892.904.64$5,883
May 2011571,28998.134.40$11,271
Apr 201101,747105.964.33$7,570
Mar 20112999196.364.06$6,815
Feb 2011066585.644.18$2,780
Jan 2011321,23986.504.59$8,454
Dec 2010311,27585.734.35$8,201
Nov 2010301,32080.843.80$7,435
Oct 201001,42478.103.51$4,997
Sep 201001,43972.633.98$5,726
Aug 201001,50973.684.42$6,669
Jul 2010271,54772.554.74$9,286
Jun 2010291,57670.364.91$9,779
May 2010281,67771.124.24$9,094
Apr 201011,65081.694.12$6,884
Mar 2010281,29378.394.39$7,869
Feb 2010261,58273.585.44$10,523
Jan 2010231,81974.365.96$12,559
Dec 2009441,48271.445.48$11,270
Nov 2009191,46974.593.75$6,928
Oct 2009122,03272.544.11$9,223
Sep 2009512,04865.543.06$9,619
Aug 200902,27067.423.22$7,306
Jul 2009442,39761.133.46$10,994
Jun 2009462,36066.163.90$12,236
May 200902,51854.743.93$9,885
Apr 2009843,21246.773.59$15,452
Mar 20091064,51042.144.06$22,773
Feb 2009785,72232.814.63$29,069
Jan 200902,96935.865.37$15,947
Dec 20081535,43637.105.98$38,168
Nov 2008704,99455.496.86$38,145
Oct 20081194,29875.246.92$38,704
Sep 2008953,925101.767.88$40,585
Aug 20081133,870114.228.48$45,736
Jul 20081423,675131.0811.39$60,470
Jun 20081253,675131.3313.03$64,311
May 20081593,979123.1711.57$65,638
Apr 20081624,060110.3110.45$60,317
Mar 20082224,060101.909.66$61,858
Feb 20081175,02192.538.77$54,863
Jan 20081716,19890.388.21$66,314
Dec 20071897,01188.337.30$67,888
Nov 20071387,98091.677.29$70,838
Oct 20071709,21082.856.92$77,836
Sep 20071719,89775.846.24$74,767
Aug 200720811,80569.066.39$89,774
Jul 200739613,33170.906.39$113,234
Jun 200749920,28162.007.55$184,028
May 200783518,92258.747.85$197,515

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Sep 2021 — as filed, then multipliedworked
Condensate             5 bbl  × $ 69.86 =       $349
Gas                    0 Mcf  × $  5.35 =         $0

────────────────────────────────────────────────────
Month total                                     $349

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/228753 is the state's own key, not one this site invented.