Value, all time
$4.7 M
Mar 2006 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
243
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-11-21170475
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition14,531 bbl$964,025
GasProduction642,924 Mcf$3,718,015
Total$4,682,040

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6293, -100.3293. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.62931, -100.32925 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
13,465 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 13,465 ft.

Completions filed
Mar 2006
1 of 1 wells

1 well

42-21133474155913,465 ftMar 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (243)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

243 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20231070.622.23$71
Apr 2023109078.122.24$8,515
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 20220164115.097.98$1,308
May 20220158109.378.43$1,332
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 2020066334.901.69$1,121
May 2020050416.921.81$915
Apr 2020052014.751.80$938
Mar 2020012630.341.86$234
Feb 2020017149.881.98$339
Jan 2020074457.252.09$1,558
Dec 201918356459.012.30$12,098
Nov 2019054755.302.75$1,505
Oct 201901,84253.472.42$4,455
Sep 20191342,24755.052.66$13,348
Aug 201902,38653.112.30$5,498
Jul 201902,42956.272.46$5,975
Jun 201901,58652.782.49$3,951
May 201901,80258.482.74$4,938
Apr 201942,32962.632.75$6,657
Mar 2019171,98956.803.06$7,056
Feb 2019151,97450.852.79$6,275
Jan 20191132,40946.033.23$12,978
Dec 2018182,27246.594.19$10,348
Nov 2018162,26552.934.24$10,444
Oct 2018141,95861.443.40$7,514
Sep 201801,74059.543.11$5,408
Aug 20181132,53159.403.07$14,474
Jul 201802,35365.142.93$6,899
Jun 2018222,62160.183.08$9,389
May 2018262,17765.382.90$8,015
Apr 20181041,55463.842.90$11,147
Mar 2018461,61361.222.79$7,311
Feb 2018301,45361.782.77$5,873
Jan 2018321,16862.874.01$6,695
Dec 2017131,06857.272.92$3,865
Nov 20171131,21255.423.12$10,042
Oct 2017111,36749.292.98$4,621
Sep 20171091,44947.523.09$9,653
Aug 2017101,63745.373.00$5,372
Jul 20171091,68543.873.09$9,984
Jun 2017131,63542.493.09$5,600
May 20171111,69245.373.26$10,558
Apr 2017201,61947.933.21$6,158
Mar 20171221,61446.772.98$10,522
Feb 2017151,38150.452.95$4,834
Jan 20171131,73949.413.42$11,529
Dec 2016161,78348.763.72$7,418
Nov 20161191,77642.492.64$9,753
Oct 20161301,99146.193.09$12,157
Sep 2016141,83641.553.10$6,274
Aug 20161311,99641.442.92$11,266
Jul 2016141,81841.622.92$5,899
Jun 20161172,10845.352.69$10,968
May 2016202,33142.521.99$5,492
Apr 20161202,40436.561.99$9,174
Mar 2016282,48433.011.79$5,381
Feb 2016232,48526.472.06$5,737
Jan 20161182,49127.352.36$9,117
Dec 2015362,10232.362.00$5,372
Nov 20151232,59338.792.17$10,391
Oct 20151412,67243.552.43$12,624
Sep 20151322,00342.992.76$11,200
Aug 20151012,87640.162.87$12,317
Jul 20151883,42148.152.95$19,127
Jun 20152222,22556.152.88$18,880
May 201507555.212.96$222
Apr 2015010249.822.71$276
Mar 201509942.892.93$291
Feb 2015022444.662.98$667
Jan 2015037743.433.10$1,169
Dec 2014051054.693.59$1,832
Nov 2014053770.464.25$2,283
Oct 2014055278.303.90$2,153
Sep 2014056186.164.05$2,269
Aug 2014061289.394.04$2,469
Jul 2014061396.564.18$2,562
Jun 2014061998.164.74$2,932
May 2014163094.734.73$3,072
Apr 2014168195.944.81$3,371
Mar 2014067695.895.06$3,418
Feb 2014064297.406.19$3,975
Jan 2014076590.404.86$3,718
Dec 2013070591.824.35$3,070
Nov 2013066488.853.74$2,482
Oct 2013069797.423.78$2,634
Sep 20130694104.113.72$2,580
Aug 20130718104.253.52$2,529
Jul 201320719102.523.72$4,723
Jun 201315074094.403.93$17,071
May 2013180094.834.15$3,414
Apr 2013161493.964.28$2,723
Mar 2013178693.623.91$3,169
Feb 2013276791.233.42$2,806
Jan 201317778191.603.42$18,884
Dec 2012384986.773.42$3,164
Nov 2012092686.953.62$3,357
Oct 2012179889.383.40$2,802
Sep 201202394.672.92$67
Aug 2012026292.662.91$762
Jul 2012090485.133.02$2,731
Jun 201211,01079.822.52$2,624
May 2012431,13691.612.49$6,766
Apr 201201,156101.652.00$2,308
Mar 201211,246105.052.22$2,874
Feb 20122720101.102.57$2,053
Jan 20121181,33098.092.73$15,211
Dec 201101,39396.873.24$4,513
Nov 201111,43795.723.31$4,854
Oct 2011184484.983.65$3,164
Sep 2011187883.623.99$3,583
Aug 2011091983.404.15$3,813
Jul 201101,13694.144.52$5,132
Jun 201111,82892.904.64$8,575
May 2011881,99598.134.40$17,423
Apr 201102,418105.964.33$10,478
Mar 20111091,55496.364.06$16,808
Feb 201101,34685.644.18$5,626
Jan 201102,63286.504.59$12,078
Dec 20101022,87485.734.35$21,240
Nov 201003,01380.843.80$11,435
Oct 20102353,71278.103.51$31,379
Sep 20101203,61372.633.98$23,093
Aug 201003,72673.684.42$16,467
Jul 20101174,26372.554.74$28,680
Jun 2010154,34170.364.91$22,371
May 20101344,58971.124.24$28,966
Apr 20101314,42681.694.12$28,948
Mar 2010283,45478.394.39$17,353
Feb 2010364,11673.585.44$25,050
Jan 20101214,52774.365.96$35,997
Dec 2009413,82771.445.48$23,915
Nov 2009343,75474.593.75$16,619
Oct 2009394,72972.544.11$22,266
Sep 20091224,51165.543.06$21,821
Aug 200904,92167.423.22$15,838
Jul 2009495,03261.133.46$20,429
Jun 20091094,87266.163.90$26,188
May 2009545,07054.743.93$22,860
Apr 2009474,79546.773.59$19,400
Mar 2009763,12842.144.06$15,899
Feb 2009433,14632.814.63$15,986
Jan 2009483,00735.865.37$17,872
Dec 2008603,22537.105.98$21,502
Nov 2008923,40155.496.86$28,437
Oct 20082073,76575.246.92$41,636
Sep 2008284,181101.767.88$35,783
Aug 20082094,477114.228.48$61,850
Jul 2008584,653131.0811.39$60,598
Jun 20082154,653131.3313.03$88,877
May 2008345,093123.1711.57$63,136
Apr 20082105,105110.3110.45$76,537
Mar 20082175,105101.909.66$71,447
Feb 2008485,67692.538.77$54,223
Jan 20082116,51290.388.21$72,506
Dec 20072236,65488.337.30$68,285
Nov 2007486,83991.677.29$54,268
Oct 20072197,09982.856.92$67,283
Sep 20072327,14475.846.24$62,203
Aug 20072367,52969.066.39$64,393
Jul 20072617,22870.906.39$64,677
Jun 2007587,58162.007.55$60,821
May 20072728,63558.747.85$83,730
Apr 20072438,52959.617.81$81,056
Mar 20073519,27256.927.30$87,683
Feb 20072638,96955.108.22$88,181
Jan 200728010,30350.306.73$83,391
Dec 200628411,16356.656.92$93,319
Nov 200627311,19054.207.62$100,036
Oct 200627613,41254.906.01$95,809
Sep 200627613,99960.085.04$87,098
Aug 200647217,55468.717.34$161,276
Jul 200650721,40269.376.34$170,918
Jun 200627525,15566.286.38$178,814
May 200657137,73966.016.42$280,165
Apr 200682669,94664.397.36$568,022
Mar 200652216,23856.707.08$144,610

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2023 — as filed, then multipliedworked
Condensate             1 bbl  × $ 70.62 =        $71
Gas                    0 Mcf  × $  2.23 =         $0

────────────────────────────────────────────────────
Month total                                      $71

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/218200 is the state's own key, not one this site invented.