FINSTERWALD DOBBS

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 228820District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$3.8 M
Jun 2007 – May 2026
Value, last 12 filed months
$200
at the published price for each month
Months reported
228
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-07-23176759
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition14,142 bbl$1,086,747
GasProduction505,426 Mcf$2,710,302
Total$3,797,049

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6139, -100.3097. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.61389, -100.30965 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
13,700 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 13,700 ft.

Completions filed
Mar 2012
1 of 1 wells

1 well

42-483323151151A13,700 ftMar 2012

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (228)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

228 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20252066.743.32$133
Jun 20251066.483.13$66
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20244071.372.28$285
Sep 20240069.612.36$0
Aug 202410075.632.06$756
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20246078.812.20$473
Apr 20240084.451.66$0
Mar 202448180.301.55$3,856
Feb 20240076.091.78$0
Jan 2024652173.023.30$4,816
Dec 2023031071.262.61$809
Nov 202312039377.892.81$10,450
Oct 20238557185.443.09$9,025
Sep 2023052189.042.74$1,425
Aug 2023056980.522.67$1,521
Jul 2023062174.852.64$1,641
Jun 2023076868.962.26$1,735
May 2023024770.622.23$550
Apr 202314032878.122.24$11,671
Mar 2023063572.852.39$1,520
Feb 2023057575.112.47$1,418
Jan 2023062876.533.39$2,127
Dec 2022012976.415.73$739
Nov 2022034285.005.65$1,931
Oct 2022029487.185.86$1,724
Sep 20222341584.888.16$5,340
Aug 2022060294.529.13$5,495
Jul 20220194101.587.54$1,463
Jun 20220334115.097.98$2,664
May 2022147650109.378.43$21,559
Apr 20220578104.226.84$3,952
Mar 20220629108.885.08$3,193
Feb 2022038291.054.86$1,856
Jan 2022086081.844.54$3,902
Dec 20214559771.323.90$5,537
Nov 2021038277.435.24$2,000
Oct 202110967779.795.71$12,565
Sep 2021058369.865.35$3,120
Aug 2021060566.024.22$2,553
Jul 202113377670.783.98$12,504
Jun 2021050869.493.38$1,717
May 2021046563.483.02$1,403
Apr 2021057960.362.76$1,597
Mar 2021069861.302.72$1,896
Feb 2021047957.805.55$2,657
Jan 20212964650.412.81$3,277
Dec 202001,26044.642.68$3,371
Nov 202006838.772.71$184
Oct 20200036.972.48$0
Sep 2020031637.091.99$629
Aug 20202055839.982.39$2,130
Jul 2020371,06138.371.83$3,356
Jun 20207172234.901.69$3,698
May 2020050716.921.81$920
Apr 2020058014.751.80$1,047
Mar 20202431,11330.341.86$9,439
Feb 202001,29649.881.98$2,567
Jan 202001,30757.252.09$2,738
Dec 20191061,36659.012.30$9,403
Nov 201902,32455.302.75$6,393
Oct 201901,91753.472.42$4,636
Sep 201901,53755.052.66$4,084
Aug 201901,68053.112.30$3,871
Jul 201901,40756.272.46$3,461
Jun 201901,00852.782.49$2,511
May 2019097158.482.74$2,661
Apr 20191011,51962.632.75$10,504
Mar 201991,69056.803.06$5,686
Feb 201981,29850.852.79$4,031
Jan 20191061,40146.033.23$9,402
Dec 201832,03346.594.19$8,649
Nov 201861,43452.934.24$6,394
Oct 201871,52961.443.40$5,626
Sep 20181011,63059.543.11$11,080
Aug 201851,88459.403.07$6,074
Jul 201801,77165.142.93$5,192
Jun 20181281,41060.183.08$12,042
May 20181131,53365.382.90$11,835
Apr 201801,13663.842.90$3,295
Mar 20181289961.222.79$3,240
Feb 2018101,01461.782.77$3,423
Jan 20181091,16162.874.01$11,508
Dec 201781,34557.272.92$4,388
Nov 20171061,39555.423.12$10,225
Oct 201771,41549.292.98$4,567
Sep 20171011,48347.523.09$9,378
Aug 201791,46545.373.00$4,810
Jul 2017111,52843.873.09$5,200
Jun 20171051,46042.493.09$8,969
May 2017111,51045.373.26$5,427
Apr 2017141,32947.933.21$4,939
Mar 20171111,38746.772.98$9,330
Feb 2017111,19450.452.95$4,080
Jan 2017101,16849.413.42$4,487
Dec 20161061,08248.763.72$9,197
Nov 201691,48342.492.64$4,304
Oct 201691,26946.193.09$4,337
Sep 201671,22141.553.10$4,077
Aug 20161071,34541.442.92$8,367
Jul 201681,32541.622.92$4,208
Jun 201671,25945.352.69$3,699
May 2016111,56742.521.99$3,588
Apr 2016111,51936.561.99$3,427
Mar 2016151,49333.011.79$3,174
Feb 2016121,73326.472.06$3,894
Jan 2016101,52827.352.36$3,886
Dec 201591,65832.362.00$3,610
Nov 201571,39438.792.17$3,293
Oct 201581,30743.552.43$3,520
Sep 201561,48042.992.76$4,340
Aug 20151061,19940.162.87$7,701
Jul 2015121,43648.152.95$4,807
Jun 2015101,45856.152.88$4,765
May 201501,65255.212.96$4,882
Apr 20151211,53249.822.71$10,175
Mar 201561,65442.892.93$5,111
Feb 20151261,25644.662.98$9,365
Jan 201541,54043.433.10$4,949
Dec 201481,74654.693.59$6,708
Nov 20141251,69670.464.25$16,019
Oct 20141291,67978.303.90$16,650
Sep 201441,93286.164.05$8,160
Aug 20141192,11289.394.04$19,160
Jul 201492,41796.564.18$10,971
Jun 20141242,03098.164.74$21,788
May 2014332,24094.734.73$13,714
Apr 20142352,17995.944.81$33,025
Mar 201401,40895.895.06$7,120
Feb 201401,79597.406.19$11,115
Jan 20141701,90390.404.86$24,618
Dec 2013088391.824.35$3,845
Nov 201318822888.853.74$17,556
Oct 20131891,23397.423.78$23,072
Sep 20132081,972104.113.72$28,986
Aug 2013184713104.253.52$21,694
Jul 201302,794102.523.72$10,387
Jun 201382,22594.403.93$9,507
May 20131971,04994.834.15$23,034
Apr 20131522,13493.964.28$23,421
Mar 20131062,86393.623.91$21,126
Feb 20131092,03991.233.42$16,917
Jan 2013202,23291.603.42$9,465
Dec 2012962,41886.773.42$16,600
Nov 2012982,24486.953.62$16,656
Oct 20121012,72089.383.40$18,275
Sep 2012919294.672.92$8,883
Aug 2012853,38092.662.91$17,706
Jul 20121113,28785.133.02$19,379
Jun 2012812,99279.822.52$14,002
May 2012482,91991.612.49$11,661
Apr 2012102,351101.652.00$5,711
Mar 2012181,420105.052.22$5,046
Feb 201282,792101.102.57$7,985
Jan 2012181,72798.092.73$6,487
Dec 201101,55796.873.24$5,044
Nov 20111001,62395.723.31$14,946
Oct 2011112,31784.983.65$9,388
Sep 201171,77083.623.99$7,640
Aug 20111431,99983.404.15$20,221
Jul 2011102,23094.144.52$11,015
Jun 201102,17592.904.64$10,092
May 20111412,34998.134.40$24,183
Apr 20110800105.964.33$3,467
Mar 20111561,67896.364.06$21,840
Feb 2011102,41885.644.18$10,964
Jan 20111322,24986.504.59$21,738
Dec 20101532,66085.734.35$24,682
Nov 2010242,53180.843.80$11,546
Oct 20101502,90878.103.51$21,919
Sep 2010252,85072.633.98$13,157
Aug 201023,06973.684.42$13,710
Jul 201003,21072.554.74$15,204
Jun 201043,11970.364.91$15,597
May 201043,29671.124.24$14,244
Apr 201093,69681.694.12$15,973
Mar 2010156,31578.394.39$28,890
Feb 2010286,05473.585.44$35,008
Jan 2010145,51274.365.96$33,915
Dec 2009282,93871.445.48$18,112
Nov 2009602,76774.593.75$14,856
Oct 2009763,03972.544.11$18,004
Sep 2009782,90665.543.06$14,018
Aug 200903,08867.423.22$9,939
Jul 20091053,14761.133.46$17,321
Jun 2009862,93666.163.90$17,125
May 20091133,04954.743.93$18,155
Apr 2009233,13646.773.59$12,326
Mar 20091023,56742.144.06$18,777
Feb 200943,52932.814.63$16,481
Jan 200944,87135.865.37$26,306
Dec 2008745,98537.105.98$38,519
Nov 2008713,96555.496.86$31,141
Oct 2008764,76875.246.92$38,722
Sep 2008794,715101.767.88$45,180
Aug 2008854,922114.228.48$51,462
Jul 20081505,339131.0811.39$80,470
Jun 2008825,281131.3313.03$79,594
May 20081975,940123.1711.57$93,016
Apr 2008765,724110.3110.45$68,227
Mar 200827615,625101.909.66$179,125
Feb 20081865,24492.538.77$63,204
Jan 20081695,06190.388.21$56,803
Dec 20072907,02288.337.30$76,890
Nov 20073279,63791.677.29$100,246
Oct 200746912,42782.856.92$124,876
Sep 200748214,56375.846.24$127,489
Aug 200756919,56669.066.39$164,282
Jul 200773031,30170.906.39$251,706
Jun 20071,46245,13862.007.55$431,366

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jul 2025 — as filed, then multipliedworked
Condensate             2 bbl  × $ 66.74 =       $133
Gas                    0 Mcf  × $  3.32 =         $0

────────────────────────────────────────────────────
Month total                                     $133

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/228820 is the state's own key, not one this site invented.