DOBBS, FINSTERWALD

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 234039District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$3.4 M
Nov 2007 – May 2026
Value, last 12 filed months
$26 k
at the published price for each month
Months reported
223
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-07-16183013
NGPA2none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition10,060 bbl$781,663
GasProduction473,464 Mcf$2,604,242
Total$3,385,906

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6120, -100.3120. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.61203, -100.31200 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
13,740 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 13,740 ft.

Completions filed
Apr 2013
1 of 1 wells

1 well

42-48331980135113,740 ftApr 2013

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (223)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

223 months

May 202600106.413.05$0
Apr 20262824698.932.87$3,476
Mar 2026023389.753.15$734
Feb 2026027963.503.75$1,046
Jan 2026026359.138.00$2,103
Dec 2025049856.664.41$2,198
Nov 2025032658.593.93$1,280
Oct 202510129959.383.30$6,986
Sep 2025034362.743.08$1,055
Aug 2025010663.933.01$320
Jul 2025043966.743.32$1,455
Jun 20258114166.483.13$5,826
May 2025035860.553.23$1,157
Apr 2025064062.363.54$2,268
Mar 2025038467.704.27$1,639
Feb 20250070.884.34$0
Jan 2025041174.324.28$1,759
Dec 2024041168.993.12$1,283
Nov 2024043069.052.20$945
Oct 20249958271.372.28$8,393
Sep 2024053569.612.36$1,265
Aug 2024042675.632.06$879
Jul 2024031279.932.15$670
Jun 2024033678.082.63$885
May 20248637678.812.20$7,604
Apr 2024044784.451.66$742
Mar 202409780.301.55$150
Feb 2024031076.091.78$553
Jan 2024032073.023.30$1,055
Dec 2023029871.262.61$778
Nov 2023025177.892.81$705
Oct 20236617885.443.09$6,189
Sep 2023039489.042.74$1,078
Aug 2023064480.522.67$1,721
Jul 2023055774.852.64$1,471
Jun 20230068.962.26$0
May 20232070.622.23$141
Apr 2023184278.122.24$14,379
Mar 2023025272.852.39$603
Feb 2023026275.112.47$646
Jan 2023011576.533.39$390
Dec 2022016776.415.73$957
Nov 2022014685.005.65$824
Oct 2022034887.185.86$2,041
Sep 2022015084.888.16$1,225
Aug 2022010094.529.13$913
Jul 20220101101.587.54$762
Jun 20220407115.097.98$3,247
May 2022092109.378.43$776
Apr 20220536104.226.84$3,665
Mar 20220192108.885.08$975
Feb 2022018591.054.86$899
Jan 2022034081.844.54$1,543
Dec 2021021771.323.90$846
Nov 2021061977.435.24$3,242
Oct 2021024979.795.71$1,423
Sep 2021037469.865.35$2,001
Aug 2021035366.024.22$1,490
Jul 2021042670.783.98$1,696
Jun 2021038469.493.38$1,298
May 20211021,07363.483.02$9,713
Apr 2021068460.362.76$1,887
Mar 2021019761.302.72$535
Feb 202109657.805.55$533
Jan 2021012050.412.81$337
Dec 2020041844.642.68$1,118
Nov 2020052038.772.71$1,407
Oct 2020061936.972.48$1,534
Sep 2020066637.091.99$1,326
Aug 202018760439.982.39$8,917
Jul 2020051938.371.83$947
Jun 2020059834.901.69$1,011
May 2020047016.921.81$853
Apr 2020080114.751.80$1,445
Mar 2020052330.341.86$971
Feb 2020058049.881.98$1,149
Jan 2020079257.252.09$1,659
Dec 2019083659.012.30$1,926
Nov 2019081555.302.75$2,242
Oct 2019039853.472.42$963
Sep 2019018555.052.66$492
Aug 20190053.112.30$0
Jul 201918753056.272.46$11,826
Jun 2019052852.782.49$1,315
May 2019068158.482.74$1,866
Apr 2019029162.632.75$800
Mar 201981,36356.803.06$4,628
Feb 20192131,35350.852.79$14,609
Jan 201901,32746.033.23$4,284
Dec 201812,06846.594.19$8,702
Nov 2018483652.934.24$3,754
Oct 201881,12861.443.40$4,325
Sep 201801,10659.543.11$3,437
Aug 2018125159.403.07$829
Jul 2018027365.142.93$800
Jun 2018044660.183.08$1,372
May 2018026765.382.90$775
Apr 2018087363.842.90$2,532
Mar 2018774761.222.79$2,510
Feb 20182111,09261.782.77$16,056
Jan 201841,33462.874.01$5,600
Dec 2017854157.272.92$2,039
Nov 20176755.423.12$354
Oct 2017748249.292.98$1,783
Sep 201781,45747.523.09$4,878
Aug 201791,42445.373.00$4,687
Jul 2017101,51143.873.09$5,104
Jun 2017121,54842.493.09$5,289
May 2017111,70945.373.26$6,076
Apr 2017131,49447.933.21$5,421
Mar 2017211,38246.772.98$5,106
Feb 201719892550.452.95$12,720
Jan 201791,09449.413.42$4,185
Dec 201691,48248.763.72$5,956
Nov 201691,63742.492.64$4,711
Oct 201691,38646.193.09$4,699
Sep 201651,33141.553.10$4,335
Aug 2016111,46141.442.92$4,728
Jul 20161961,52841.622.92$12,626
Jun 2016101,43745.352.69$4,313
May 2016111,58442.521.99$3,622
Apr 2016101,59636.561.99$3,543
Mar 2016111,64033.011.79$3,305
Feb 201681,55926.472.06$3,429
Jan 2016131,72127.352.36$4,425
Dec 2015161,73032.362.00$3,980
Nov 2015101,36738.792.17$3,351
Oct 2015181,29443.552.43$3,924
Sep 2015101,35242.992.76$4,159
Aug 201501,31240.162.87$3,769
Jul 20151991,46548.152.95$13,896
Jun 201551,37656.152.88$4,248
May 201501,56955.212.96$4,637
Apr 2015231,18549.822.71$4,353
Mar 20152221,13142.892.93$12,841
Feb 201531,48044.662.98$4,539
Jan 201541,72943.433.10$5,535
Dec 201411,53854.693.59$5,578
Nov 20142021,06670.464.25$18,765
Oct 201421,08878.303.90$4,401
Sep 201411,15486.164.05$4,755
Aug 201431,13989.394.04$4,864
Jul 201411,71596.564.18$7,265
Jun 20142052,04098.164.74$29,786
May 201432,26494.734.73$10,985
Apr 201432,44695.944.81$12,051
Mar 2014111,84295.895.06$10,369
Feb 2014991,21497.406.19$17,160
Jan 2014038290.404.86$1,857
Dec 2013078191.824.35$3,401
Nov 201301,04188.853.74$3,892
Oct 201301,33897.423.78$5,057
Sep 201301,445104.113.72$5,372
Aug 201301,652104.253.52$5,819
Jul 201301,716102.523.72$6,380
Jun 20131001,52794.403.93$15,446
May 2013201,86594.834.15$9,635
Apr 201342,45593.964.28$10,890
Mar 2013893,05593.623.91$20,286
Feb 2013242,47791.233.42$10,661
Jan 2013202,49391.603.42$10,358
Dec 2012172,66686.773.42$10,593
Nov 20121192,84486.953.62$20,656
Oct 2012162,88989.383.40$11,252
Sep 201201294.672.92$35
Aug 201202,83792.662.91$8,250
Jul 201292,76085.133.02$9,104
Jun 201292,49679.822.52$7,006
May 201292,31191.612.49$6,575
Apr 2012122,417101.652.00$6,046
Mar 2012212,471105.052.22$7,697
Feb 2012222,278101.102.57$8,079
Jan 2012111,58298.092.73$5,404
Dec 201101,69796.873.24$5,498
Nov 2011131,83495.723.31$7,317
Oct 2011142,51584.983.65$10,366
Sep 2011122,71783.623.99$11,833
Aug 2011832,83583.404.15$18,686
Jul 2011133,08494.144.52$15,155
Jun 201103,18892.904.64$14,792
May 2011833,09498.134.40$21,773
Apr 201103,180105.964.33$13,780
Mar 2011903,16996.364.06$21,530
Feb 2011122,24685.644.18$10,416
Jan 2011183,46586.504.59$17,457
Dec 2010953,64385.734.35$23,983
Nov 20101033,48680.843.80$21,557
Oct 2010173,03878.103.51$11,988
Sep 2010213,66472.633.98$16,106
Aug 2010104,05873.684.42$18,671
Jul 2010184,30072.554.74$21,673
Jun 2010293,59570.364.91$19,693
May 20101174,38371.124.24$26,884
Apr 2010574,41981.694.12$22,875
Mar 20101284,08278.394.39$27,948
Feb 20101403,68473.585.44$30,351
Jan 20101314,39174.365.96$35,929
Dec 20091384,78571.445.48$36,098
Nov 2009574,81774.593.75$22,323
Oct 20091685,13572.544.11$33,293
Sep 2009765,02665.543.06$20,384
Aug 2009785,38867.423.22$22,600
Jul 20091675,51061.133.46$29,298
Jun 20091504,57166.163.90$27,728
May 20091535,32454.743.93$29,276
Apr 2009755,32446.773.59$22,608
Mar 2009876,03242.144.06$28,150
Feb 20091376,10632.814.63$32,784
Jan 20091194,08835.865.37$26,224
Dec 20081364,29137.105.98$30,694
Nov 20081265,48955.496.86$44,648
Oct 20081596,22475.246.92$55,046
Sep 20081707,036101.767.88$72,722
Aug 20081657,677114.228.48$83,970
Jul 20083258,378131.0811.39$138,022
Jun 20081788,819131.3313.03$138,312
May 200819110,650123.1711.57$146,792
Apr 20089812,063110.3110.45$136,927
Mar 200846913,372101.909.66$177,019
Feb 200846917,88792.538.77$200,276
Jan 200865313,43190.388.21$169,229
Dec 200755753,38888.337.30$439,037
Nov 20071876991.677.29$7,257

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Condensate            28 bbl  × $ 98.93 =     $2,770
Gas                  246 Mcf  × $  2.87 =       $706

────────────────────────────────────────────────────
Month total                                   $3,476

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/234039 is the state's own key, not one this site invented.