PIERCE, V. I. 10

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 107975District 7CField 67995200NGPA filingCondensateGasSaveExport
Value, all time
$828 k
Jan 1993 – May 2026
Value, last 12 filed months
$14 k
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition55 bbl$4,370
GasProduction251,488 Mcf$823,392
Total$827,761

58,640 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4789, -101.3585. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.47890, -101.35855 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,680 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,680 ft.

Completions filed
Nov 1983
1 of 1 wells

1 well

42-1053462456,680 ftNov 1983

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 202617245106.413.05$2,555
Apr 2026425598.932.87$1,128
Mar 20261089.753.15$90
Feb 2026519663.503.75$1,053
Jan 2026222059.138.00$1,878
Dec 2025326556.664.41$1,340
Nov 2025326858.593.93$1,228
Oct 2025225559.383.30$961
Sep 2025126162.743.08$866
Aug 2025226763.933.01$933
Jul 2025226266.743.32$1,002
Jun 2025126066.483.13$880
May 2025326060.553.23$1,022
Apr 2025325262.363.54$1,080
Mar 2025325967.704.27$1,309
Feb 2025319370.884.34$1,050
Jan 20250074.324.28$0
Dec 2024025068.993.12$780
Nov 2024025869.052.20$567
Oct 2024027571.372.28$627
Sep 2024025769.612.36$608
Aug 2024029175.632.06$601
Jul 2024040079.932.15$859
Jun 202409478.082.63$248
May 2024010078.812.20$220
Apr 2024029184.451.66$483
Mar 2024024980.301.55$385
Feb 2024026676.091.78$474
Jan 2024027873.023.30$917
Dec 2023027871.262.61$726
Nov 2023019277.892.81$539
Oct 2023027785.443.09$855
Sep 2023025089.042.74$684
Aug 2023020080.522.67$535
Jul 2023026674.852.64$703
Jun 2023028468.962.26$641
May 2023025570.622.23$568
Apr 2023032878.122.24$734
Mar 2023041372.852.39$988
Feb 2023037675.112.47$927
Jan 2023046376.533.39$1,569
Dec 2022043876.415.73$2,509
Nov 2022040685.005.65$2,292
Oct 2022056087.185.86$3,284
Sep 2022050484.888.16$4,114
Aug 2022045194.529.13$4,116
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 2022079104.226.84$540
Mar 2022033108.885.08$168
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 2021026077.435.24$1,362
Oct 2021046679.795.71$2,663
Sep 2021046169.865.35$2,467
Aug 2021047766.024.22$2,013
Jul 2021037770.783.98$1,501
Jun 2021050269.493.38$1,697
May 2021026463.483.02$797
Apr 2021042160.362.76$1,161
Mar 2021040861.302.72$1,109
Feb 2021033557.805.55$1,859
Jan 2021040050.412.81$1,124
Dec 2020032844.642.68$878
Nov 2020035338.772.71$955
Oct 2020037536.972.48$929
Sep 2020032037.091.99$637
Aug 2020035339.982.39$842
Jul 2020035838.371.83$653
Jun 2020035834.901.69$605
May 2020037716.921.81$684
Apr 2020041814.751.80$754
Mar 2020042230.341.86$783
Feb 2020041449.881.98$820
Jan 2020041757.252.09$874
Dec 2019044359.012.30$1,021
Nov 2019043055.302.75$1,183
Oct 2019049553.472.42$1,197
Sep 2019019555.052.66$518
Aug 2019033553.112.30$772
Jul 2019045656.272.46$1,122
Jun 2019043452.782.49$1,081
May 2019046558.482.74$1,274
Apr 2019045562.632.75$1,252
Mar 2019046956.803.06$1,436
Feb 2019032250.852.79$899
Jan 2019042446.033.23$1,369
Dec 2018045946.594.19$1,921
Nov 2018030352.934.24$1,284
Oct 2018040561.443.40$1,376
Sep 2018044959.543.11$1,395
Aug 2018038859.403.07$1,190
Jul 2018043465.142.93$1,272
Jun 2018038660.183.08$1,188
May 2018042365.382.90$1,227
Apr 2018045463.842.90$1,317
Mar 2018047761.222.79$1,329
Feb 2018035961.782.77$993
Jan 2018048062.874.01$1,924
Dec 2017049257.272.92$1,437
Nov 2017047955.423.12$1,494
Oct 2017051149.292.98$1,525
Sep 2017033547.523.09$1,034
Aug 2017053045.373.00$1,592
Jul 2017033343.873.09$1,028
Jun 2017043942.493.09$1,355
May 2017052245.373.26$1,703
Apr 2017049747.933.21$1,596
Mar 2017041146.772.98$1,226
Feb 2017053650.452.95$1,583
Jan 2017049249.413.42$1,682
Dec 2016021848.763.72$812
Nov 2016043442.492.64$1,148
Oct 2016034146.193.09$1,054
Sep 2016029041.553.10$899
Aug 2016033141.442.92$968
Jul 2016046641.622.92$1,363
Jun 2016035345.352.69$948
May 2016039242.521.99$780
Apr 2016042636.561.99$848
Mar 2016043533.011.79$780
Feb 2016042226.472.06$871
Jan 2016035927.352.36$849
Dec 2015033532.362.00$670
Nov 2015041938.792.17$908
Oct 2015046843.552.43$1,136
Sep 2015042942.992.76$1,183
Aug 2015041240.162.87$1,183
Jul 2015042448.152.95$1,249
Jun 2015040256.152.88$1,159
May 2015037155.212.96$1,096
Apr 2015047549.822.71$1,286
Mar 2015039042.892.93$1,145
Feb 2015042144.662.98$1,253
Jan 2015045243.433.10$1,401
Dec 2014051454.693.59$1,846
Nov 2014041870.464.25$1,777
Oct 2014044778.303.90$1,744
Sep 2014044086.164.05$1,780
Aug 2014034689.394.04$1,396
Jul 2014047796.564.18$1,994
Jun 2014052198.164.74$2,468
May 2014055394.734.73$2,614
Apr 2014049495.944.81$2,376
Mar 2014046595.895.06$2,351
Feb 2014055197.406.19$3,412
Jan 2014055990.404.86$2,717
Dec 2013020291.824.35$880
Nov 2013033688.853.74$1,256
Oct 2013048897.423.78$1,844
Sep 20130399104.113.72$1,483
Aug 20130422104.253.52$1,487
Jul 20130423102.523.72$1,573
Jun 2013049494.403.93$1,943
May 2013027194.834.15$1,124
Apr 2013047593.964.28$2,034
Mar 2013041493.623.91$1,620
Feb 2013034991.233.42$1,194
Jan 2013043791.603.42$1,495
Dec 2012052386.773.42$1,789
Nov 2012034186.953.62$1,236
Oct 2012048989.383.40$1,662
Sep 2012030794.672.92$896
Aug 2012053192.662.91$1,544
Jul 2012044285.133.02$1,335
Jun 2012027979.822.52$703
May 2012050191.612.49$1,247
Apr 20120453101.652.00$905
Mar 20120424105.052.22$942
Feb 20120545101.102.57$1,401
Jan 2012057598.092.73$1,572
Dec 2011030496.873.24$985
Nov 2011031295.723.31$1,033
Oct 2011050284.983.65$1,832
Sep 2011050983.623.99$2,029
Aug 2011076183.404.15$3,158
Jul 2011059594.144.52$2,688
Jun 2011048092.904.64$2,227
May 2011058298.134.40$2,564
Apr 20110519105.964.33$2,249
Mar 2011065896.364.06$2,670
Feb 2011055885.644.18$2,332
Jan 2011063286.504.59$2,900
Dec 2010063585.734.35$2,761
Nov 2010057880.843.80$2,194
Oct 2010053678.103.51$1,881
Sep 2010047372.633.98$1,882
Aug 2010062673.684.42$2,767
Jul 2010069072.554.74$3,268
Jun 2010053470.364.91$2,622
May 2010063371.124.24$2,681
Apr 2010051981.694.12$2,140
Mar 2010053478.394.39$2,344
Feb 2010084773.585.44$4,610
Jan 2010059974.365.96$3,572
Dec 2009060871.445.48$3,334
Nov 2009055174.593.75$2,067
Oct 2009053372.544.11$2,191
Sep 2009027965.543.06$855
Aug 2009021567.423.22$692
Jul 2009062161.133.46$2,151
Jun 2009071766.163.90$2,793
May 2009083354.743.93$3,270
Apr 2009084946.773.59$3,046
Mar 2009052042.144.06$2,111
Feb 200908832.814.63$408
Jan 2009014135.865.37$757
Dec 2008030037.105.98$1,793
Nov 2008014955.496.86$1,022
Oct 2008021775.246.92$1,502
Sep 20080144101.767.88$1,134
Aug 20080310114.228.48$2,630
Jul 20080644131.0811.39$7,335
Jun 20080514131.3313.03$6,699
May 20080506123.1711.57$5,857
Apr 20080222110.3110.45$2,321
Mar 20080283101.909.66$2,735
Feb 2008023992.538.77$2,096
Jan 2008025290.388.21$2,068
Dec 2007027888.337.30$2,030
Nov 2007021791.677.29$1,582
Oct 2007040782.856.92$2,817
Sep 2007079275.846.24$4,945
Aug 2007084169.066.39$5,372
Jul 2007087970.906.39$5,615
Jun 2007095862.007.55$7,231
May 2007084158.747.85$6,599
Apr 2007070059.617.81$5,464
Mar 2007071956.927.30$5,250
Feb 2007069455.108.22$5,702
Jan 2007097650.306.73$6,565
Dec 2006076056.656.92$5,258
Nov 2006074254.207.62$5,652
Oct 2006078354.906.01$4,709
Sep 2006082460.085.04$4,151
Aug 2006085068.717.34$6,239
Jul 2006083569.376.34$5,296
Jun 2006089766.286.38$5,726
May 2006086766.016.42$5,570
Apr 2006079364.397.36$5,837
Mar 2006071656.707.08$5,071
Feb 2006032257.597.75$2,496
Jan 2006065060.598.93$5,807
Dec 2005059254.9413.42$7,942
Nov 2005052254.6910.59$5,527
Oct 2005082458.3413.80$11,368
Sep 2005073561.4512.08$8,878
Aug 2005088461.519.80$8,660
Jul 2005085455.697.84$6,698
Jun 2005026952.337.38$1,986
May 2005046845.226.65$3,113
Apr 2005061949.207.36$4,556
Mar 2005065050.377.15$4,651
Feb 2005069045.226.31$4,355
Jan 2005087643.166.32$5,538
Dec 2004078339.866.75$5,286
Nov 2004078245.286.33$4,950
Oct 2004079249.706.52$5,160
Sep 2004088443.245.28$4,671
Aug 2004072242.375.55$4,008
Jul 2004088538.286.08$5,385
Jun 2004089636.106.43$5,764
May 2004097437.486.49$6,326
Apr 2004085934.475.86$5,032
Mar 2004096634.365.53$5,342
Feb 2004089232.455.51$4,915
Jan 2004098632.036.30$6,211
Dec 2003097930.266.30$6,169
Nov 2003091428.804.60$4,200
Oct 2003095228.174.76$4,531
Sep 2003089426.314.75$4,246
Aug 2003095829.765.13$4,914
Jul 2003085829.415.17$4,437
Jun 200301,00528.565.98$6,013
May 2003080726.595.97$4,820
Apr 2003053126.675.41$2,871
Mar 200301,08631.146.10$6,620
Feb 2003097333.487.93$7,712
Jan 200301,09330.315.58$6,101
Dec 2002053826.914.85$2,611
Nov 2002093424.664.14$3,864
Oct 200201,13226.464.23$4,787
Sep 200201,08027.443.64$3,926
Aug 200201,26125.963.16$3,990
Jul 200201,00924.583.06$3,089
Jun 2002034923.733.34$1,165
May 2002051424.663.58$1,842
Apr 2002034323.653.51$1,205
Mar 2002039822.003.10$1,235
Feb 2002034718.222.38$824
Jan 2002038817.172.38$922
Dec 2001040316.932.36$953
Nov 2001047418.072.41$1,140
Oct 2001045519.782.53$1,151
Sep 2001034524.262.25$777
Aug 2001053424.873.05$1,630
Jul 2001044623.933.20$1,426
Jun 2001078224.563.82$2,990
May 200101,04825.524.31$4,514
Apr 2001075324.685.34$4,018
Mar 2001058024.545.38$3,118
Feb 2001036527.755.77$2,105
Jan 2001069227.478.40$5,812
Dec 2000045826.889.12$4,178
Nov 2000040232.215.66$2,275
Oct 2000041631.235.15$2,141
Sep 2000058331.875.19$3,024
Aug 2000065429.644.54$2,970
Jul 2000080728.534.09$3,300
Jun 2000043929.304.40$1,930
May 2000050627.263.68$1,862
Apr 2000063324.513.12$1,972
Mar 2000066528.422.86$1,902
Feb 2000054327.622.73$1,480
Jan 2000049225.272.48$1,220
Dec 1999062224.282.42$1,508
Nov 1999063223.192.43$1,538
Oct 1999054820.982.80$1,536
Sep 1999099021.752.62$2,593
Aug 199901,48819.262.88$4,279
Jul 1999083717.892.37$1,986
Jun 199901,10015.942.36$2,598
May 199901,16415.792.32$2,702
Apr 1999079715.102.21$1,760
Mar 199901,56112.471.84$2,870
Feb 199901,4659.981.82$2,663
Jan 1999092010.381.90$1,748
Dec 199805529.201.77$979
Nov 1998051110.892.19$1,117
Oct 1998054912.421.97$1,081
Sep 1998078012.592.08$1,624
Aug 199801,35411.301.91$2,583
Jul 199801,74111.742.24$3,895
Jun 199801,58211.242.24$3,539
May 1998050112.622.21$1,105
Apr 1998064513.042.51$1,616
Mar 1998071612.802.31$1,654
Feb 1998057713.952.30$1,327
Jan 1998070814.702.15$1,526
Dec 199701,40716.322.41$3,392
Nov 199701,06518.193.09$3,289
Oct 199701,52319.253.15$4,797
Sep 1997089917.742.95$2,656
Aug 199701,35517.862.55$3,462
Jul 1997095417.582.25$2,144
Jun 199701,24217.242.26$2,803
May 199702,12818.972.31$4,912
Apr 199701,77017.882.08$3,687
Mar 199701,96818.951.94$3,816
Feb 1997074620.492.21$1,646
Jan 199701,00623.483.54$3,561
Dec 199601,19823.32$0
Nov 199601,85521.97$0
Oct 199601,96223.31$0
Sep 199601,69422.22$0
Aug 199602,19620.26$0
Jul 199601,30019.55$0
Jun 199601,00518.73$0
May 199601,10919.43$0
Apr 199602,51321.51$0
Mar 1996091019.38$0
Feb 1996071216.98$0
Jan 1996079817.07$0
Dec 1995076117.19$0
Nov 1995094016.00$0
Oct 1995090015.43$0
Sep 1995076116.18$0
Aug 1995096015.92$0
Jul 1995078715.24$0
Jun 1995091016.41$0
May 199501,07917.56$0
Apr 199501,08817.73$0
Mar 1995095016.44$0
Feb 199501,10916.58$0
Jan 199501,42115.92$0
Dec 199401,74915.03$0
Nov 199401,50315.90$0
Oct 199401,12615.58$0
Sep 199401,03715.29$0
Aug 199401,19716.13$0
Jul 1994099417.56$0
Jun 199401,11517.09$0
May 199401,22215.88$0
Apr 199401,16114.14$0
Mar 199401,09412.46$0
Feb 199401,06812.50$0
Jan 199401,56512.66$0
Dec 199301,81512.33$0
Nov 199301,63514.49$0
Oct 199301,10015.85$0
Sep 1993094115.03$0
Aug 199301,25015.66$0
Jul 1993080015.46$0
Jun 199301,02916.79$0
May 199301,07617.68$0
Apr 199301,19818.05$0
Mar 199301,38118.14$0
Feb 199301,30517.90$0
Jan 199301,36116.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate            17 bbl  × $106.41 =     $1,809
Gas                  245 Mcf  × $  3.05 =       $746

────────────────────────────────────────────────────
Month total                                   $2,555

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/107975 is the state's own key, not one this site invented.