PIERCE, V. I. 10

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 125150District 7CField 67995200NGPA filingGasSaveExport
Value, all time
$669 k
Jan 1993 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
401
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction204,577 Mcf$669,282
Total$669,282

65,024 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4742, -101.3531. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.47419, -101.35312 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,625 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,625 ft.

Completions filed
Sep 1987
1 of 1 wells

1 well

42-1053541066,625 ftSep 1987

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 20260106.413.05$0
Apr 2026098.932.87$0
Mar 2026089.753.15$0
Feb 2026063.503.75$0
Jan 2026059.138.00$0
Dec 2025056.664.41$0
Nov 2025058.593.93$0
Oct 2025059.383.30$0
Sep 2025062.743.08$0
Aug 2025063.933.01$0
Jul 2025066.743.32$0
Jun 2025066.483.13$0
May 2025060.553.23$0
Apr 2025062.363.54$0
Mar 2025067.704.27$0
Feb 2025070.884.34$0
Jan 2025074.324.28$0
Dec 2024068.993.12$0
Nov 2024069.052.20$0
Oct 2024071.372.28$0
Sep 2024069.612.36$0
Aug 2024075.632.06$0
Jul 2024079.932.15$0
Jun 2024078.082.63$0
May 2024078.812.20$0
Apr 2024084.451.66$0
Mar 2024080.301.55$0
Feb 2024076.091.78$0
Jan 2024073.023.30$0
Dec 2023071.262.61$0
Nov 2023077.892.81$0
Oct 2023085.443.09$0
Sep 2023089.042.74$0
Aug 2023080.522.67$0
Jul 2023074.852.64$0
Jun 2023068.962.26$0
May 2023070.622.23$0
Apr 2023078.122.24$0
Mar 2023072.852.39$0
Feb 2023075.112.47$0
Jan 2023076.533.39$0
Dec 2022076.415.73$0
Nov 2022085.005.65$0
Oct 2022087.185.86$0
Sep 2022084.888.16$0
Aug 2022094.529.13$0
Jul 20220101.587.54$0
Jun 20220115.097.98$0
May 20220109.378.43$0
Apr 20220104.226.84$0
Mar 20220108.885.08$0
Feb 2022091.054.86$0
Jan 2022081.844.54$0
Dec 2021071.323.90$0
Nov 2021077.435.24$0
Oct 2021079.795.71$0
Sep 2021069.865.35$0
Aug 2021066.024.22$0
Jul 2021070.783.98$0
Jun 2021069.493.38$0
May 2021063.483.02$0
Apr 2021060.362.76$0
Mar 2021061.302.72$0
Feb 2021057.805.55$0
Jan 2021050.412.81$0
Dec 2020044.642.68$0
Nov 2020038.772.71$0
Oct 2020036.972.48$0
Sep 2020037.091.99$0
Aug 2020039.982.39$0
Jul 2020038.371.83$0
Jun 2020034.901.69$0
May 2020016.921.81$0
Apr 2020014.751.80$0
Mar 2020030.341.86$0
Feb 2020049.881.98$0
Jan 2020057.252.09$0
Dec 2019059.012.30$0
Nov 2019055.302.75$0
Oct 2019053.472.42$0
Sep 2019055.052.66$0
Aug 2019053.112.30$0
Jul 2019056.272.46$0
Jun 2019052.782.49$0
May 2019058.482.74$0
Apr 2019062.632.75$0
Mar 2019056.803.06$0
Feb 2019050.852.79$0
Jan 2019046.033.23$0
Dec 2018046.594.19$0
Nov 2018052.934.24$0
Oct 2018061.443.40$0
Sep 2018059.543.11$0
Aug 2018059.403.07$0
Jul 2018065.142.93$0
Jun 2018060.183.08$0
May 2018065.382.90$0
Apr 2018063.842.90$0
Mar 2018061.222.79$0
Feb 2018061.782.77$0
Jan 2018062.874.01$0
Dec 2017057.272.92$0
Nov 2017055.423.12$0
Oct 2017049.292.98$0
Sep 2017047.523.09$0
Aug 2017045.373.00$0
Jul 2017043.873.09$0
Jun 2017042.493.09$0
May 2017045.373.26$0
Apr 2017047.933.21$0
Mar 2017046.772.98$0
Feb 2017050.452.95$0
Jan 2017049.413.42$0
Dec 2016048.763.72$0
Nov 2016042.492.64$0
Oct 2016046.193.09$0
Sep 2016041.553.10$0
Aug 2016041.442.92$0
Jul 2016041.622.92$0
Jun 2016045.352.69$0
May 2016042.521.99$0
Apr 2016036.561.99$0
Mar 2016033.011.79$0
Feb 2016026.472.06$0
Jan 2016027.352.36$0
Dec 2015032.362.00$0
Nov 2015038.792.17$0
Oct 2015043.552.43$0
Sep 2015042.992.76$0
Aug 2015040.162.87$0
Jul 2015048.152.95$0
Jun 2015056.152.88$0
May 2015055.212.96$0
Apr 2015049.822.71$0
Mar 2015042.892.93$0
Feb 2015044.662.98$0
Jan 2015043.433.10$0
Dec 2014054.693.59$0
Nov 2014070.464.25$0
Oct 2014078.303.90$0
Sep 2014086.164.05$0
Aug 2014089.394.04$0
Jul 2014096.564.18$0
Jun 2014098.164.74$0
May 2014094.734.73$0
Apr 2014095.944.81$0
Mar 2014095.895.06$0
Feb 2014097.406.19$0
Jan 2014090.404.86$0
Dec 2013091.824.35$0
Nov 2013088.853.74$0
Oct 2013097.423.78$0
Sep 20130104.113.72$0
Aug 20130104.253.52$0
Jul 20130102.523.72$0
Jun 2013094.403.93$0
May 2013094.834.15$0
Apr 2013093.964.28$0
Mar 2013093.623.91$0
Feb 2013091.233.42$0
Jan 2013091.603.42$0
Dec 2012086.773.42$0
Nov 2012086.953.62$0
Oct 2012089.383.40$0
Sep 2012094.672.92$0
Aug 2012092.662.91$0
Jul 2012085.133.02$0
Jun 2012079.822.52$0
May 2012091.612.49$0
Apr 20120101.652.00$0
Mar 20120105.052.22$0
Feb 20120101.102.57$0
Jan 2012098.092.73$0
Dec 20111296.873.24$39
Nov 2011495.723.31$13
Oct 2011084.983.65$0
Sep 2011083.623.99$0
Aug 2011183.404.15$4
Jul 201112294.144.52$551
Jun 201176992.904.64$3,568
May 201188298.134.40$3,885
Apr 2011278105.964.33$1,205
Mar 201170696.364.06$2,864
Feb 201141985.644.18$1,751
Jan 201175286.504.59$3,451
Dec 201076385.734.35$3,317
Nov 201077680.843.80$2,945
Oct 201077778.103.51$2,726
Sep 201044272.633.98$1,759
Aug 201088373.684.42$3,902
Jul 201079872.554.74$3,780
Jun 201058270.364.91$2,858
May 201065971.124.24$2,791
Apr 201023481.694.12$965
Mar 20101,15178.394.39$5,051
Feb 201076973.585.44$4,185
Jan 20101,02374.365.96$6,101
Dec 20091,18371.445.48$6,487
Nov 20091,36674.593.75$5,125
Oct 200998972.544.11$4,065
Sep 200951065.543.06$1,563
Aug 200928667.423.22$920
Jul 200928761.133.46$994
Jun 200927466.163.90$1,067
May 200928354.743.93$1,111
Apr 200926446.773.59$947
Mar 200927442.144.06$1,112
Feb 200924732.814.63$1,144
Jan 200927635.865.37$1,482
Dec 200826237.105.98$1,566
Nov 200836255.496.86$2,483
Oct 20085275.246.92$360
Sep 2008151101.767.88$1,189
Aug 2008209114.228.48$1,773
Jul 2008796131.0811.39$9,066
Jun 2008222131.3313.03$2,893
May 2008500123.1711.57$5,787
Apr 2008689110.3110.45$7,203
Mar 2008764101.909.66$7,383
Feb 200888692.538.77$7,771
Jan 200856290.388.21$4,612
Dec 200721188.337.30$1,541
Nov 200759491.677.29$4,331
Oct 200764882.856.92$4,485
Sep 200779975.846.24$4,989
Aug 200783669.066.39$5,340
Jul 200792170.906.39$5,883
Jun 200775362.007.55$5,684
May 200710658.747.85$832
Apr 200728659.617.81$2,232
Mar 200752656.927.30$3,841
Feb 200769855.108.22$5,735
Jan 200784250.306.73$5,664
Dec 200683556.656.92$5,777
Nov 200683354.207.62$6,345
Oct 200689254.906.01$5,364
Sep 20061,00860.085.04$5,078
Aug 20061,10468.717.34$8,103
Jul 200696269.376.34$6,102
Jun 20061,01966.286.38$6,505
May 200692566.016.42$5,943
Apr 200676064.397.36$5,594
Mar 200673056.707.08$5,171
Feb 200662057.597.75$4,806
Jan 200687760.598.93$7,835
Dec 20051,04454.9413.42$14,006
Nov 200543254.6910.59$4,574
Oct 200598958.3413.80$13,644
Sep 20051,10361.4512.08$13,323
Aug 20051,15261.519.80$11,286
Jul 20052455.697.84$188
Jun 20055052.337.38$369
May 20056645.226.65$439
Apr 200518149.207.36$1,332
Mar 200511350.377.15$809
Feb 200547545.226.31$2,998
Jan 200573843.166.32$4,666
Dec 200478039.866.75$5,266
Nov 200477945.286.33$4,931
Oct 200471149.706.52$4,632
Sep 200477943.245.28$4,116
Aug 200485942.375.55$4,768
Jul 200475538.286.08$4,594
Jun 200472836.106.43$4,683
May 200489537.486.49$5,813
Apr 200490534.475.86$5,302
Mar 200489234.365.53$4,933
Feb 200472932.455.51$4,017
Jan 200492732.036.30$5,840
Dec 200393430.266.30$5,886
Nov 200365828.804.60$3,024
Oct 200378728.174.76$3,746
Sep 200380526.314.75$3,823
Aug 200388929.765.13$4,560
Jul 200383029.415.17$4,292
Jun 200377728.565.98$4,649
May 200386926.595.97$5,190
Apr 200394226.675.41$5,094
Mar 200399731.146.10$6,078
Feb 200396833.487.93$7,672
Jan 20031,02830.315.58$5,738
Dec 20021,08626.914.85$5,271
Nov 20021,12524.664.14$4,654
Oct 200299026.464.23$4,187
Sep 20021,08927.443.64$3,959
Aug 20021,41525.963.16$4,477
Jul 200251424.583.06$1,574
Jun 20026223.733.34$207
May 200237024.663.58$1,326
Apr 200285423.653.51$3,000
Mar 20021,08222.003.10$3,357
Feb 200259218.222.38$1,406
Jan 20021,31917.172.38$3,134
Dec 200178616.932.36$1,858
Nov 200198818.072.41$2,377
Oct 200153919.782.53$1,363
Sep 20011,00624.262.25$2,265
Aug 20011,38724.873.05$4,235
Jul 200165623.933.20$2,097
Jun 200195824.563.82$3,664
May 200199525.524.31$4,286
Apr 20011,02024.685.34$5,442
Mar 20011,15824.545.38$6,226
Feb 20011,13427.755.77$6,540
Jan 20011,31727.478.40$11,061
Dec 20001,02526.889.12$9,351
Nov 200020332.215.66$1,149
Oct 20001,06031.235.15$5,454
Sep 20001,18731.875.19$6,156
Aug 20001,01129.644.54$4,591
Jul 20001,30028.534.09$5,317
Jun 200089329.304.40$3,927
May 20001,18927.263.68$4,375
Apr 20007924.513.12$246
Mar 20001,34228.422.86$3,838
Feb 200041127.622.73$1,121
Jan 20001,32125.272.48$3,277
Dec 19991,37524.282.42$3,333
Nov 19991,24823.192.43$3,038
Oct 19991,24320.982.80$3,485
Sep 19991,22521.752.62$3,208
Aug 19991,21319.262.88$3,488
Jul 19991,28017.892.37$3,037
Jun 19991,15615.942.36$2,731
May 19991,23615.792.32$2,869
Apr 19991,18015.102.21$2,606
Mar 19991,27412.471.84$2,342
Feb 19991,1109.981.82$2,018
Jan 19991,38910.381.90$2,639
Dec 19981,1439.201.77$2,027
Nov 19981,00610.892.19$2,199
Oct 19981,22612.421.97$2,414
Sep 199889412.592.08$1,862
Aug 199898611.301.91$1,881
Jul 19981,09111.742.24$2,441
Jun 199894911.242.24$2,123
May 19981,01812.622.21$2,246
Apr 19981,02713.042.51$2,573
Mar 199888412.802.31$2,042
Feb 199881413.952.30$1,871
Jan 19981,14014.702.15$2,456
Dec 19971,19316.322.41$2,876
Nov 199793218.193.09$2,878
Oct 199757819.253.15$1,821
Sep 199791617.742.95$2,707
Aug 19971,13617.862.55$2,902
Jul 19971,14517.582.25$2,573
Jun 199794617.242.26$2,135
May 199743118.972.31$995
Apr 19977817.882.08$162
Mar 19971,11118.951.94$2,154
Feb 199753920.492.21$1,189
Jan 19971,10723.483.54$3,918
Dec 199697823.32$0
Nov 19961,32321.97$0
Oct 19961,36823.31$0
Sep 19961,21622.22$0
Aug 19961,81220.26$0
Jul 199626019.55$0
Jun 19961,60418.73$0
May 199681019.43$0
Apr 19961,47621.51$0
Mar 19961,51119.38$0
Feb 199684716.98$0
Jan 19961,73617.07$0
Dec 199562917.19$0
Nov 199588816.00$0
Oct 199578615.43$0
Sep 19951,21116.18$0
Aug 19951,97215.92$0
Jul 19951,29515.24$0
Jun 19951,21416.41$0
May 199574517.56$0
Apr 19951,14117.73$0
Mar 19951,26716.44$0
Feb 19951,56416.58$0
Jan 19951,71215.92$0
Dec 19941,24315.03$0
Nov 19941,15415.90$0
Oct 19941,71115.58$0
Sep 19941,64815.29$0
Aug 19941,68216.13$0
Jul 19941,73217.56$0
Jun 19941,59717.09$0
May 19941,82615.88$0
Apr 19941,63814.14$0
Mar 19941,67412.46$0
Feb 19941,76312.50$0
Jan 19941,80512.66$0
Dec 19931,67912.33$0
Nov 19931,75014.49$0
Oct 19931,44615.85$0
Sep 19931,40215.03$0
Aug 19931,10415.66$0
Jul 19931,06315.46$0
Jun 19931,42516.79$0
May 19931,50317.68$0
Apr 19931,24418.05$0
Mar 19931,17318.14$0
Feb 199382517.90$0
Jan 19931,57216.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Dec 2011 — as filed, then multipliedworked
Gas                   12 Mcf  × $  3.24 =        $39

────────────────────────────────────────────────────
Month total                                      $39

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/125150 is the state's own key, not one this site invented.