PIERCE, V. I. 10

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 65694District 7CField 67995200CondensateGasSaveExport
Value, all time
$283 k
Jan 1993 – May 2026
Value, last 12 filed months
$8 k
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition34 bbl$2,679
GasProduction83,869 Mcf$279,911
Total$282,590

18,078 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4760, -101.3570. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.47599, -101.35702 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,710 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,710 ft.

Completions filed
Mar 1976
1 of 1 wells

1 well

42-1053080336,710 ftMar 1976

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 202610134106.413.05$1,472
Apr 202629498.932.87$468
Mar 20261089.753.15$90
Feb 2026412863.503.75$734
Jan 2026114559.138.00$1,219
Dec 2025214656.664.41$758
Nov 2025114558.593.93$628
Oct 2025113559.383.30$506
Sep 2025114762.743.08$515
Aug 2025115063.933.01$516
Jul 2025115166.743.32$567
Jun 2025115166.483.13$539
May 2025215160.553.23$609
Apr 2025214762.363.54$646
Mar 2025215267.704.27$784
Feb 2025213770.884.34$736
Jan 20250074.324.28$0
Dec 2024014868.993.12$462
Nov 2024015069.052.20$330
Oct 2024015371.372.28$349
Sep 2024016669.612.36$392
Aug 202408975.632.06$184
Jul 2024012679.932.15$270
Jun 2024014078.082.63$369
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 2024010280.301.55$158
Feb 20240076.091.78$0
Jan 2024015273.023.30$501
Dec 2023016671.262.61$433
Nov 2023014477.892.81$404
Oct 2023019385.443.09$596
Sep 2023018589.042.74$506
Aug 2023019480.522.67$519
Jul 2023019474.852.64$513
Jun 2023018968.962.26$427
May 2023020770.622.23$461
Apr 2023018778.122.24$418
Mar 2023019772.852.39$471
Feb 2023017375.112.47$427
Jan 2023019976.533.39$674
Dec 2022019376.415.73$1,106
Nov 2022019885.005.65$1,118
Oct 2022021087.185.86$1,231
Sep 2022019384.888.16$1,576
Aug 2022019994.529.13$1,816
Jul 20220207101.587.54$1,561
Jun 20220204115.097.98$1,627
May 20220169109.378.43$1,425
Apr 20220207104.226.84$1,415
Mar 20220212108.885.08$1,076
Feb 2022019691.054.86$952
Jan 2022023181.844.54$1,048
Dec 2021027071.323.90$1,053
Nov 2021022677.435.24$1,184
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210161.302.72$3
Feb 202108657.805.55$477
Jan 2021016250.412.81$455
Dec 2020014244.642.68$380
Nov 2020015438.772.71$417
Oct 2020016236.972.48$402
Sep 2020013937.091.99$277
Aug 2020015339.982.39$365
Jul 2020015538.371.83$283
Jun 2020015534.901.69$262
May 2020016416.921.81$298
Apr 2020018114.751.80$327
Mar 2020018430.341.86$342
Feb 2020017849.881.98$353
Jan 2020019157.252.09$400
Dec 2019019259.012.30$442
Nov 2019018955.302.75$520
Oct 2019020153.472.42$486
Sep 2019020855.052.66$553
Aug 2019018353.112.30$422
Jul 2019019556.272.46$480
Jun 2019019252.782.49$478
May 2019019458.482.74$532
Apr 2019018762.632.75$514
Mar 2019019256.803.06$588
Feb 2019017250.852.79$480
Jan 2019018346.033.23$591
Dec 2018018346.594.19$766
Nov 2018017852.934.24$754
Oct 2018018361.443.40$622
Sep 2018018459.543.11$572
Aug 2018015759.403.07$481
Jul 2018018365.142.93$537
Jun 2018017760.183.08$545
May 2018017765.382.90$513
Apr 2018018263.842.90$528
Mar 2018018861.222.79$524
Feb 2018016561.782.77$456
Jan 2018017762.874.01$710
Dec 2017018557.272.92$540
Nov 2017017755.423.12$552
Oct 2017018549.292.98$552
Sep 2017017847.523.09$550
Aug 2017018345.373.00$550
Jul 2017018343.873.09$565
Jun 2017034142.493.09$1,053
May 2017018945.373.26$617
Apr 2017017847.933.21$572
Mar 2017017346.772.98$516
Feb 2017017050.452.95$502
Jan 2017018849.413.42$643
Dec 2016017748.763.72$659
Nov 2016018642.492.64$492
Oct 2016018346.193.09$566
Sep 2016018141.553.10$561
Aug 2016018541.442.92$541
Jul 2016017941.622.92$523
Jun 2016018145.352.69$486
May 2016018142.521.99$360
Apr 2016018636.561.99$370
Mar 2016018333.011.79$328
Feb 2016017426.472.06$359
Jan 2016018227.352.36$430
Dec 2015018632.362.00$372
Nov 2015017638.792.17$381
Oct 2015018543.552.43$449
Sep 2015017942.992.76$494
Aug 2015018340.162.87$526
Jul 2015018448.152.95$542
Jun 2015017856.152.88$513
May 2015018555.212.96$547
Apr 2015017849.822.71$482
Mar 2015018442.892.93$540
Feb 2015016544.662.98$491
Jan 2015017943.433.10$555
Dec 2014018454.693.59$661
Nov 2014017870.464.25$757
Oct 2014018678.303.90$726
Sep 2014017986.164.05$724
Aug 2014018389.394.04$738
Jul 2014013896.564.18$577
Jun 2014012398.164.74$583
May 2014016594.734.73$780
Apr 2014014595.944.81$697
Mar 2014016095.895.06$809
Feb 2014015997.406.19$985
Jan 2014013690.404.86$661
Dec 2013013391.824.35$579
Nov 2013013988.853.74$520
Oct 2013014697.423.78$552
Sep 20130132104.113.72$491
Aug 20130115104.253.52$405
Jul 2013098102.523.72$364
Jun 2013010994.403.93$429
May 2013017094.834.15$705
Apr 2013013093.964.28$557
Mar 2013015193.623.91$591
Feb 2013010191.233.42$345
Jan 2013013291.603.42$451
Dec 2012012986.773.42$441
Nov 2012014286.953.62$515
Oct 2012011689.383.40$394
Sep 2012010294.672.92$298
Aug 2012015092.662.91$436
Jul 2012017385.133.02$523
Jun 2012017279.822.52$433
May 2012017891.612.49$443
Apr 20120173101.652.00$345
Mar 20120180105.052.22$400
Feb 20120167101.102.57$429
Jan 2012017598.092.73$478
Dec 2011018496.873.24$596
Nov 2011017195.723.31$566
Oct 2011017984.983.65$653
Sep 2011023483.623.99$933
Aug 2011017783.404.15$734
Jul 2011017394.144.52$781
Jun 2011017092.904.64$789
May 2011018198.134.40$797
Apr 20110170105.964.33$737
Mar 2011018196.364.06$734
Feb 2011016585.644.18$690
Jan 2011018186.504.59$831
Dec 2010018185.734.35$787
Nov 2010017680.843.80$668
Oct 2010018678.103.51$653
Sep 2010017472.633.98$692
Aug 2010018673.684.42$822
Jul 2010019372.554.74$914
Jun 2010018470.364.91$904
May 2010019771.124.24$834
Apr 2010019481.694.12$800
Mar 2010019678.394.39$860
Feb 2010017373.585.44$942
Jan 2010019674.365.96$1,169
Dec 2009018771.445.48$1,025
Nov 2009019774.593.75$739
Oct 2009020372.544.11$834
Sep 2009017965.543.06$549
Aug 2009019267.423.22$618
Jul 2009019161.133.46$662
Jun 2009018566.163.90$721
May 2009019254.743.93$754
Apr 2009019146.773.59$685
Mar 2009019842.144.06$804
Feb 2009017532.814.63$811
Jan 2009019635.865.37$1,053
Dec 2008019137.105.98$1,142
Nov 2008018855.496.86$1,290
Oct 2008019775.246.92$1,364
Sep 20080126101.767.88$993
Aug 20080188114.228.48$1,595
Jul 20080198131.0811.39$2,255
Jun 20080191131.3313.03$2,489
May 20080202123.1711.57$2,338
Apr 20080235110.3110.45$2,457
Mar 20080174101.909.66$1,682
Feb 2008018192.538.77$1,587
Jan 2008019790.388.21$1,617
Dec 2007019288.337.30$1,402
Nov 2007019191.677.29$1,393
Oct 2007018982.856.92$1,308
Sep 2007018675.846.24$1,161
Aug 2007017969.066.39$1,143
Jul 2007018270.906.39$1,163
Jun 2007017762.007.55$1,336
May 2007018058.747.85$1,412
Apr 2007018559.617.81$1,444
Mar 2007019256.927.30$1,402
Feb 2007017255.108.22$1,413
Jan 2007018950.306.73$1,271
Dec 2006020956.656.92$1,446
Nov 2006022154.207.62$1,683
Oct 2006016054.906.01$962
Sep 2006021060.085.04$1,058
Aug 2006022568.717.34$1,651
Jul 2006024769.376.34$1,567
Jun 2006022066.286.38$1,404
May 2006015366.016.42$983
Apr 2006015164.397.36$1,111
Mar 2006015656.707.08$1,105
Feb 2006012557.597.75$969
Jan 2006017060.598.93$1,519
Dec 2005021854.9413.42$2,925
Nov 2005019154.6910.59$2,022
Oct 2005021558.3413.80$2,966
Sep 2005021861.4512.08$2,633
Aug 2005021361.519.80$2,087
Jul 2005021655.697.84$1,694
Jun 2005019552.337.38$1,439
May 2005024445.226.65$1,623
Apr 2005017249.207.36$1,266
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 2005012743.166.32$803
Dec 2004019339.866.75$1,303
Nov 2004016945.286.33$1,070
Oct 2004024049.706.52$1,564
Sep 2004022043.245.28$1,162
Aug 2004027542.375.55$1,526
Jul 2004025638.286.08$1,558
Jun 2004026736.106.43$1,718
May 2004023837.486.49$1,546
Apr 2004024434.475.86$1,429
Mar 2004028534.365.53$1,576
Feb 2004023532.455.51$1,295
Jan 2004027532.036.30$1,732
Dec 2003024630.266.30$1,550
Nov 2003021828.804.60$1,002
Oct 2003023428.174.76$1,114
Sep 2003024526.314.75$1,164
Aug 2003029529.765.13$1,513
Jul 2003029129.415.17$1,505
Jun 2003026628.565.98$1,591
May 2003027026.595.97$1,613
Apr 2003030126.675.41$1,628
Mar 2003028731.146.10$1,750
Feb 2003015433.487.93$1,221
Jan 2003022030.315.58$1,228
Dec 2002022226.914.85$1,078
Nov 2002020524.664.14$848
Oct 2002028726.464.23$1,214
Sep 2002023827.443.64$865
Aug 2002023025.963.16$728
Jul 2002021024.583.06$643
Jun 2002022023.733.34$734
May 2002022224.663.58$796
Apr 2002022223.653.51$780
Mar 2002021422.003.10$664
Feb 2002022018.222.38$523
Jan 2002024517.172.38$582
Dec 2001023416.932.36$553
Nov 2001022018.072.41$529
Oct 2001023619.782.53$597
Sep 2001027824.262.25$626
Aug 2001023424.873.05$714
Jul 2001016223.933.20$518
Jun 2001020624.563.82$788
May 2001022025.524.31$948
Apr 2001025624.685.34$1,366
Mar 2001025424.545.38$1,366
Feb 2001017427.755.77$1,003
Jan 2001015827.478.40$1,327
Dec 2000024126.889.12$2,199
Nov 2000022332.215.66$1,262
Oct 2000021031.235.15$1,081
Sep 2000020731.875.19$1,074
Aug 2000028929.644.54$1,312
Jul 2000025228.534.09$1,031
Jun 2000023329.304.40$1,025
May 2000029727.263.68$1,093
Apr 2000032524.513.12$1,013
Mar 2000033428.422.86$955
Feb 2000024627.622.73$671
Jan 2000034225.272.48$848
Dec 1999028724.282.42$696
Nov 1999015023.192.43$365
Oct 1999031820.982.80$892
Sep 1999019321.752.62$505
Aug 1999033919.262.88$975
Jul 1999015517.892.37$368
Jun 1999028715.942.36$678
May 1999024215.792.32$562
Apr 1999028415.102.21$627
Mar 1999030512.471.84$561
Feb 199903229.981.82$585
Jan 1999013110.381.90$249
Dec 199803209.201.77$567
Nov 1998022210.892.19$485
Oct 1998026512.421.97$522
Sep 1998016912.592.08$352
Aug 1998014311.301.91$273
Jul 1998016211.742.24$362
Jun 1998028811.242.24$644
May 1998022712.622.21$501
Apr 1998024813.042.51$621
Mar 1998022712.802.31$524
Feb 1998021613.952.30$497
Jan 1998022814.702.15$491
Dec 1997023216.322.41$559
Nov 1997022818.193.09$704
Oct 1997027619.253.15$869
Sep 1997025917.742.95$765
Aug 1997031417.862.55$802
Jul 1997019617.582.25$440
Jun 1997019017.242.26$429
May 1997021418.972.31$494
Apr 1997026817.882.08$558
Mar 1997032618.951.94$632
Feb 1997028420.492.21$626
Jan 1997023023.483.54$814
Dec 1996027123.32$0
Nov 1996036221.97$0
Oct 1996033623.31$0
Sep 1996036122.22$0
Aug 1996027720.26$0
Jul 1996035919.55$0
Jun 1996035018.73$0
May 1996041219.43$0
Apr 1996039721.51$0
Mar 1996036719.38$0
Feb 1996049616.98$0
Jan 1996045117.07$0
Dec 1995043117.19$0
Nov 1995035016.00$0
Oct 1995020315.43$0
Sep 1995023116.18$0
Aug 1995040215.92$0
Jul 1995039615.24$0
Jun 1995037416.41$0
May 1995034817.56$0
Apr 1995034017.73$0
Mar 1995031116.44$0
Feb 1995035116.58$0
Jan 1995040915.92$0
Dec 1994033615.03$0
Nov 1994033515.90$0
Oct 1994042615.58$0
Sep 1994028615.29$0
Aug 1994031916.13$0
Jul 1994032717.56$0
Jun 1994041017.09$0
May 1994046415.88$0
Apr 1994040714.14$0
Mar 1994030112.46$0
Feb 1994028612.50$0
Jan 1994036212.66$0
Dec 1993037312.33$0
Nov 1993033214.49$0
Oct 1993047515.85$0
Sep 1993047915.03$0
Aug 1993050515.66$0
Jul 1993043215.46$0
Jun 1993057516.79$0
May 1993035217.68$0
Apr 1993036618.05$0
Mar 1993046818.14$0
Feb 1993039217.90$0
Jan 1993048516.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate            10 bbl  × $106.41 =     $1,064
Gas                  134 Mcf  × $  3.05 =       $408

────────────────────────────────────────────────────
Month total                                   $1,472

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/65694 is the state's own key, not one this site invented.