RICHARDSON 4

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 175860District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$661 k
Oct 1999 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
320
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas222001-03-30 – 2001-05-162 dockets
NGPA2none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition182 bbl$7,829
GasProduction144,052 Mcf$653,510
Total$661,339

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5890, -100.7794. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.58899, -100.77940 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,400 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,400 ft.

Completions filed
Oct 1999
1 of 1 wells

1 well

42-4353493968,400 ftOct 1999

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (320)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

320 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180161.443.40$3
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 201422078.303.90$1,723
Sep 201401986.164.05$77
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 2014054395.895.06$2,746
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 2013020104.113.72$74
Aug 20130215104.253.52$757
Jul 20130213102.523.72$792
Jun 2013020894.403.93$818
May 2013020794.834.15$859
Apr 2013019093.964.28$814
Mar 2013019993.623.91$779
Feb 2013018391.233.42$626
Jan 2013020591.603.42$701
Dec 2012020586.773.42$701
Nov 2012020086.953.62$725
Oct 2012021389.383.40$724
Sep 2012020494.672.92$595
Aug 2012021392.662.91$619
Jul 2012022085.133.02$665
Jun 2012020179.822.52$506
May 2012021891.612.49$542
Apr 20120208101.652.00$415
Mar 20120227105.052.22$504
Feb 20120222101.102.57$571
Jan 2012024198.092.73$659
Dec 2011025596.873.24$826
Nov 2011020995.723.31$692
Oct 2011020884.983.65$759
Sep 2011021483.623.99$853
Aug 2011022683.404.15$938
Jul 2011022494.144.52$1,012
Jun 2011121592.904.64$1,090
May 2011022198.134.40$973
Apr 20111209105.964.33$1,012
Mar 2011022096.364.06$893
Feb 2011119785.644.18$909
Jan 2011021786.504.59$996
Dec 2010021685.734.35$939
Nov 2010020480.843.80$774
Oct 2010021678.103.51$758
Sep 2010021272.633.98$844
Aug 2010021773.684.42$959
Jul 2010022172.554.74$1,047
Jun 2010021770.364.91$1,066
May 2010022371.124.24$944
Apr 2010021781.694.12$895
Mar 2010023078.394.39$1,009
Feb 2010019973.585.44$1,083
Jan 2010022074.365.96$1,312
Dec 2009021571.445.48$1,179
Nov 2009021674.593.75$810
Oct 2009025172.544.11$1,032
Sep 2009028165.543.06$861
Aug 2009033667.423.22$1,081
Jul 2009048461.133.46$1,677
Jun 2009040766.163.90$1,585
May 200902254.743.93$86
Apr 200901446.773.59$50
Mar 200901542.144.06$61
Feb 200901332.814.63$60
Jan 200901535.865.37$81
Dec 20080937.105.98$54
Nov 200801155.496.86$75
Oct 200801075.246.92$69
Sep 20080128101.767.88$1,008
Aug 20080256114.228.48$2,172
Jul 20080260131.0811.39$2,961
Jun 20080252131.3313.03$3,284
May 20080259123.1711.57$2,998
Apr 20081272110.3110.45$2,954
Mar 20080289101.909.66$2,793
Feb 2008026292.538.77$2,298
Jan 2008027190.388.21$2,224
Dec 2007128388.337.30$2,155
Nov 2007028391.677.29$2,064
Oct 2007029382.856.92$2,028
Sep 2007031175.846.24$1,942
Aug 2007026469.066.39$1,686
Jul 2007261870.906.39$4,090
Jun 200701,12162.007.55$8,462
May 2007023158.747.85$1,812
Apr 2007021759.617.81$1,694
Mar 2007019856.927.30$1,446
Feb 2007017155.108.22$1,405
Jan 2007019050.306.73$1,278
Dec 2006015256.656.92$1,052
Nov 2006112154.207.62$976
Oct 2006321354.906.01$1,446
Sep 2006231960.085.04$1,727
Aug 2006335268.717.34$2,790
Jul 2006133669.376.34$2,201
Jun 2006328866.286.38$2,037
May 2006131966.016.42$2,116
Apr 2006331164.397.36$2,482
Mar 2006332356.707.08$2,458
Feb 2006329157.597.75$2,428
Jan 2006232560.598.93$3,025
Dec 2005135454.9413.42$4,804
Nov 2005337154.6910.59$4,092
Oct 2005138458.3413.80$5,356
Sep 2005032461.4512.08$3,914
Aug 2005140361.519.80$4,010
Jul 2005147755.697.84$3,797
Jun 2005044952.337.38$3,314
May 2005112245.226.65$857
Apr 2005164949.207.36$4,826
Mar 2005151550.377.15$3,735
Feb 2005142845.226.31$2,747
Jan 2005283443.166.32$5,359
Dec 200411,23739.866.75$8,391
Nov 2004165545.286.33$4,192
Oct 2004167449.706.52$4,441
Sep 2004171243.245.28$3,805
Aug 2004184342.375.55$4,722
Jul 2004168938.286.08$4,230
Jun 2004165536.106.43$4,250
May 2004171037.486.49$4,649
Apr 2004167834.475.86$4,007
Mar 2004266034.365.53$3,719
Feb 2004171832.455.51$3,988
Jan 2004190032.036.30$5,702
Dec 200321,17430.266.30$7,459
Nov 200311,01328.804.60$4,684
Oct 200321,26428.174.76$6,073
Sep 2003290226.314.75$4,337
Aug 200311,09629.765.13$5,652
Jul 200311,08629.415.17$5,645
Jun 2003199928.565.98$6,006
May 200321,05726.595.97$6,366
Apr 200331,15826.675.41$6,342
Mar 200301,12331.146.10$6,846
Feb 200301,05433.487.93$8,354
Jan 200301,19830.315.58$6,687
Dec 200201,21826.914.85$5,912
Nov 200201,18624.664.14$4,906
Oct 200201,18926.464.23$5,028
Sep 200201,21327.443.64$4,410
Aug 200201,20625.963.16$3,816
Jul 200201,28424.583.06$3,931
Jun 200201,30023.733.34$4,340
May 200201,43124.663.58$5,129
Apr 200201,60523.653.51$5,637
Mar 200201,45822.003.10$4,524
Feb 200201,30418.222.38$3,098
Jan 200201,45517.172.38$3,457
Dec 200101,51716.932.36$3,587
Nov 200101,27418.072.41$3,065
Oct 200101,51219.782.53$3,824
Sep 200101,67024.262.25$3,760
Aug 200102,06324.873.05$6,299
Jul 200101,25623.933.20$4,016
Jun 200101,46024.563.82$5,583
May 200101,53425.524.31$6,607
Apr 200101,62824.685.34$8,686
Mar 200101,91424.545.38$10,291
Feb 200101,81827.755.77$10,485
Jan 2001102,23027.478.40$19,004
Dec 2000122,72526.889.12$25,181
Nov 2000123,07432.215.66$17,779
Oct 200003,13831.235.15$16,147
Sep 200002,94731.875.19$15,285
Aug 2000102,88829.644.54$13,410
Jul 2000113,31028.534.09$13,851
Jun 200003,16829.304.40$13,930
May 200003,29727.263.68$12,132
Apr 200003,35224.513.12$10,445
Mar 200004,05028.422.86$11,582
Feb 200004,66527.622.73$12,719
Jan 200005,30725.272.48$13,164
Dec 1999176,91224.282.42$17,166
Nov 1999158,23823.192.43$20,399
Oct 199901,63120.982.80$4,573

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2018 — as filed, then multipliedworked
Condensate             0 bbl  × $ 61.44 =         $0
Gas                    1 Mcf  × $  3.40 =         $3

────────────────────────────────────────────────────
Month total                                       $3

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/175860 is the state's own key, not one this site invented.