FIELDS 14

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 179471District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$298 k
Aug 2000 – May 2026
Value, last 12 filed months
$2 k
at the published price for each month
Months reported
310
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112000-11-17142686
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition104 bbl$4,071
GasProduction53,542 Mcf$294,268
Total$298,339

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5060, -100.5818. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.50604, -100.58184 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
5,800 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,800 ft.

Completions filed
Aug 2000
1 of 1 wells

1 well

42-4353517065,800 ftAug 2000

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (310)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

310 months

May 2026051106.413.05$155
Apr 202604998.932.87$141
Mar 202605389.753.15$167
Feb 202604563.503.75$169
Jan 202604759.138.00$376
Dec 202504756.664.41$207
Nov 202504858.593.93$188
Oct 202504859.383.30$159
Sep 202504762.743.08$145
Aug 202504963.933.01$148
Jul 202504966.743.32$162
Jun 202504866.483.13$150
May 202504960.553.23$158
Apr 202504762.363.54$167
Mar 202504867.704.27$205
Feb 202504370.884.34$187
Jan 202504874.324.28$205
Dec 202404868.993.12$150
Nov 202404769.052.20$103
Oct 202405071.372.28$114
Sep 202404969.612.36$116
Aug 202405175.632.06$105
Jul 202404879.932.15$103
Jun 202404478.082.63$116
May 202404478.812.20$97
Apr 202404484.451.66$73
Mar 202403080.301.55$46
Feb 202401076.091.78$18
Jan 20240573.023.30$16
Dec 20230571.262.61$13
Nov 202301077.892.81$28
Oct 20230885.443.09$25
Sep 20230889.042.74$22
Aug 20230880.522.67$21
Jul 20230874.852.64$21
Jun 20230768.962.26$16
May 20230770.622.23$16
Apr 20230778.122.24$16
Mar 20230872.852.39$19
Feb 20230175.112.47$2
Jan 20230176.533.39$3
Dec 20220876.415.73$46
Nov 202201085.005.65$56
Oct 20220987.185.86$53
Sep 20220884.888.16$65
Aug 20220794.529.13$64
Jul 202207101.587.54$53
Jun 202206115.097.98$48
May 202207109.378.43$59
Apr 202208104.226.84$55
Mar 202208108.885.08$41
Feb 20220791.054.86$34
Jan 20220981.844.54$41
Dec 20210971.323.90$35
Nov 20210877.435.24$42
Oct 20210779.795.71$40
Sep 20210669.865.35$32
Aug 20210366.024.22$13
Jul 20210270.783.98$8
Jun 20210269.493.38$7
May 20210263.483.02$6
Apr 20210260.362.76$6
Mar 20210161.302.72$3
Feb 20210157.805.55$6
Jan 20210150.412.81$3
Dec 20200144.642.68$3
Nov 20200138.772.71$3
Oct 20200136.972.48$2
Sep 20200137.091.99$2
Aug 20200239.982.39$5
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190259.012.30$5
Nov 20190055.302.75$0
Oct 20190153.472.42$2
Sep 20190055.052.66$0
Aug 20190153.112.30$2
Jul 20190156.272.46$2
Jun 20190152.782.49$2
May 20191258.482.74$64
Apr 20190262.632.75$6
Mar 20190256.803.06$6
Feb 20190250.852.79$6
Jan 20190846.033.23$26
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180359.543.11$9
Aug 20180359.403.07$9
Jul 20180365.142.93$9
Jun 20180360.183.08$9
May 20180265.382.90$6
Apr 20180363.842.90$9
Mar 20180361.222.79$8
Feb 20180361.782.77$8
Jan 20180362.874.01$12
Dec 20170457.272.92$12
Nov 20170355.423.12$9
Oct 20170449.292.98$12
Sep 20170347.523.09$9
Aug 20170345.373.00$9
Jul 20170343.873.09$9
Jun 20170342.493.09$9
May 20170345.373.26$10
Apr 20170347.933.21$10
Mar 20170246.772.98$6
Feb 20170250.452.95$6
Jan 20170249.413.42$7
Dec 20160248.763.72$7
Nov 20160342.492.64$8
Oct 20160346.193.09$9
Sep 20160241.553.10$6
Aug 20160241.442.92$6
Jul 20160241.622.92$6
Jun 20160245.352.69$5
May 20160242.521.99$4
Apr 20160236.561.99$4
Mar 20160333.011.79$5
Feb 20160826.472.06$17
Jan 201601427.352.36$33
Dec 20150432.362.00$8
Nov 201505838.792.17$126
Oct 201505343.552.43$129
Sep 201506242.992.76$171
Aug 201503940.162.87$112
Jul 201504448.152.95$130
Jun 201503756.152.88$107
May 201504555.212.96$133
Apr 201506249.822.71$168
Mar 201505942.892.93$173
Feb 201505744.662.98$170
Jan 201505743.433.10$177
Dec 201406454.693.59$230
Nov 201407770.464.25$327
Oct 201408078.303.90$312
Sep 201408086.164.05$324
Aug 201407889.394.04$315
Jul 201408396.564.18$347
Jun 201408298.164.74$388
May 201408694.734.73$406
Apr 201407895.944.81$375
Mar 201406895.895.06$344
Feb 201407797.406.19$477
Jan 201408890.404.86$428
Dec 201308291.824.35$357
Nov 201308388.853.74$310
Oct 201309197.423.78$344
Sep 2013087104.113.72$323
Aug 2013090104.253.52$317
Jul 2013085102.523.72$316
Jun 201308794.403.93$342
May 201308894.834.15$365
Apr 201308393.964.28$355
Mar 201308193.623.91$317
Feb 201307391.233.42$250
Jan 201308091.603.42$274
Dec 201208986.773.42$304
Nov 201207986.953.62$286
Oct 201208189.383.40$275
Sep 201208094.672.92$233
Aug 201208392.662.91$241
Jul 201208785.133.02$263
Jun 201209179.822.52$229
May 201209091.612.49$224
Apr 2012088101.652.00$176
Mar 20120104105.052.22$231
Feb 2012095101.102.57$244
Jan 2012010198.092.73$276
Dec 201109596.873.24$308
Nov 201109195.723.31$301
Oct 201109284.983.65$336
Sep 201109083.623.99$359
Aug 201109283.404.15$382
Jul 201109494.144.52$425
Jun 201108892.904.64$408
May 201109498.134.40$414
Apr 2011084105.964.33$364
Mar 201109396.364.06$377
Feb 201108185.644.18$339
Jan 201109186.504.59$418
Dec 201009385.734.35$404
Nov 201009280.843.80$349
Oct 201009478.103.51$330
Sep 201008872.633.98$350
Aug 201009273.684.42$407
Jul 201009172.554.74$431
Jun 201009070.364.91$442
May 201009671.124.24$407
Apr 2010010781.694.12$441
Mar 2010012078.394.39$527
Feb 2010010673.585.44$577
Jan 2010011574.365.96$686
Dec 2009011271.445.48$614
Nov 2009011974.593.75$446
Oct 2009011972.544.11$489
Sep 200909765.543.06$297
Aug 2009010367.423.22$332
Jul 2009010461.133.46$360
Jun 200909566.163.90$370
May 200909654.743.93$377
Apr 200908446.773.59$301
Mar 200909142.144.06$369
Feb 2009010632.814.63$491
Jan 2009012235.865.37$655
Dec 2008012837.105.98$765
Nov 2008011355.496.86$775
Oct 2008011175.246.92$768
Sep 20080114101.767.88$898
Aug 20080123114.228.48$1,043
Jul 20080129131.0811.39$1,469
Jun 20081127131.3313.03$1,786
May 20081132123.1711.57$1,651
Apr 20080123110.3110.45$1,286
Mar 20080115101.909.66$1,111
Feb 2008110692.538.77$1,022
Jan 2008012990.388.21$1,059
Dec 2007012988.337.30$942
Nov 2007013091.677.29$948
Oct 2007013882.856.92$955
Sep 2007013975.846.24$868
Aug 2007216069.066.39$1,160
Jul 2007019770.906.39$1,258
Jun 2007019762.007.55$1,487
May 2007024658.747.85$1,930
Apr 2007123559.617.81$1,894
Mar 2007026956.927.30$1,964
Feb 2007024455.108.22$2,005
Jan 2007026150.306.73$1,756
Dec 2006122756.656.92$1,627
Nov 2006029154.207.62$2,217
Oct 2006139154.906.01$2,406
Sep 2006035560.085.04$1,788
Aug 2006140668.717.34$3,049
Jul 2006040669.376.34$2,575
Jun 2006036366.286.38$2,317
May 2006136866.016.42$2,430
Apr 2006339064.397.36$3,064
Mar 2006041956.707.08$2,968
Feb 2006030957.597.75$2,395
Jan 2006448660.598.93$4,584
Dec 2005048754.9413.42$6,533
Nov 2005041054.6910.59$4,341
Oct 2005044158.3413.80$6,084
Sep 2005049661.4512.08$5,991
Aug 2005356061.519.80$5,671
Jul 2005038255.697.84$2,996
Jun 2005544452.337.38$3,539
May 2005051245.226.65$3,405
Apr 2005045049.207.36$3,312
Mar 2005332950.377.15$2,505
Feb 2005035645.226.31$2,247
Jan 2005039743.166.32$2,510
Dec 2004438339.866.75$2,745
Nov 2004036645.286.33$2,317
Oct 2004343749.706.52$2,996
Sep 2004042443.245.28$2,240
Aug 2004039642.375.55$2,198
Jul 2004340038.286.08$2,549
Jun 2004049236.106.43$3,165
May 2004238437.486.49$2,569
Apr 2004036134.475.86$2,115
Mar 2004131634.365.53$1,782
Feb 2004030932.455.51$1,702
Jan 2004039432.036.30$2,482
Dec 2003034830.266.30$2,193
Nov 2003235828.804.60$1,703
Oct 2003038228.174.76$1,818
Sep 2003239426.314.75$1,924
Aug 2003450029.765.13$2,684
Jul 2003064929.415.17$3,356
Jun 2003566528.565.98$4,121
May 2003568026.595.97$4,194
Apr 2003458226.675.41$3,254
Mar 2003056531.146.10$3,444
Feb 2003359233.487.93$4,793
Jan 2003078630.315.58$4,387
Dec 2002082226.914.85$3,990
Nov 2002051724.664.14$2,139
Oct 2002053226.464.23$2,250
Sep 2002356327.443.64$2,129
Aug 2002365125.963.16$2,138
Jul 2002262224.583.06$1,954
Jun 2002048123.733.34$1,606
May 2002057324.663.58$2,054
Apr 2002255223.653.51$1,986
Mar 2002361022.003.10$1,959
Feb 2002057718.222.38$1,371
Jan 2002063717.172.38$1,513
Dec 2001062216.932.36$1,471
Nov 2001261118.072.41$1,506
Oct 2001260319.782.53$1,564
Sep 2001353324.262.25$1,273
Aug 2001063024.873.05$1,923
Jul 2001256123.933.20$1,841
Jun 2001251324.563.82$2,011
May 2001251825.524.31$2,282
Apr 2001248524.685.34$2,637
Mar 2001047924.545.38$2,575
Feb 2001344827.755.77$2,667
Jan 2001052827.478.40$4,435
Dec 2000061726.889.12$5,629
Nov 200031,10432.215.66$6,343
Oct 200001,32331.235.15$6,808
Sep 200031,91531.875.19$10,028
Aug 200001,53329.644.54$6,961

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   51 Mcf  × $  3.05 =       $155

────────────────────────────────────────────────────
Month total                                     $155

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/179471 is the state's own key, not one this site invented.