FIELDS 14

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 229118District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$697 k
Dec 2006 – May 2026
Value, last 12 filed months
$2 k
at the published price for each month
Months reported
234
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-09-18178197
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition92 bbl$7,415
GasProduction122,014 Mcf$689,321
Total$696,736

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5023, -100.5820. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.50234, -100.58195 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
5,781 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,781 ft.

Completions filed
Dec 2006
1 of 1 wells

1 well

42-43538135145,781 ftDec 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (234)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

234 months

May 2026058106.413.05$177
Apr 202604998.932.87$141
Mar 202605489.753.15$170
Feb 202605863.503.75$218
Jan 202605159.138.00$408
Dec 202504456.664.41$194
Nov 202504758.593.93$185
Oct 202504459.383.30$145
Sep 202505262.743.08$160
Aug 202505663.933.01$169
Jul 202505566.743.32$182
Jun 202504866.483.13$150
May 202506560.553.23$210
Apr 202505362.363.54$188
Mar 202505367.704.27$226
Feb 202505770.884.34$247
Jan 202505174.324.28$218
Dec 202405068.993.12$156
Nov 202404369.052.20$95
Oct 202405571.372.28$125
Sep 202405469.612.36$128
Aug 202406175.632.06$126
Jul 202405379.932.15$114
Jun 202405978.082.63$155
May 202424278.812.20$250
Apr 202404884.451.66$80
Mar 202406080.301.55$93
Feb 202405376.091.78$95
Jan 202405773.023.30$188
Dec 202306171.262.61$159
Nov 202306977.892.81$194
Oct 202304885.443.09$148
Sep 202305789.042.74$156
Aug 202305580.522.67$147
Jul 202307374.852.64$193
Jun 202304568.962.26$102
May 202305870.622.23$129
Apr 202306378.122.24$141
Mar 202307172.852.39$170
Feb 202306275.112.47$153
Jan 202346676.533.39$530
Dec 202207176.415.73$407
Nov 202206385.005.65$356
Oct 202209187.185.86$534
Sep 202209084.888.16$735
Aug 2022020494.529.13$1,862
Jul 20220172101.587.54$1,297
Jun 20220155115.097.98$1,236
May 20220108109.378.43$911
Apr 20221158104.226.84$1,185
Mar 20220192108.885.08$975
Feb 2022018791.054.86$909
Jan 2022016481.844.54$744
Dec 2021016871.323.90$655
Nov 2021019877.435.24$1,037
Oct 2021019079.795.71$1,086
Sep 202105669.865.35$300
Aug 202107566.024.22$317
Jul 202107470.783.98$295
Jun 202108069.493.38$270
May 202106163.483.02$184
Apr 202108760.362.76$240
Mar 202106661.302.72$179
Feb 202104357.805.55$239
Jan 202107750.412.81$216
Dec 202017144.642.68$235
Nov 202005938.772.71$160
Oct 202009336.972.48$230
Sep 202007437.091.99$147
Aug 202008539.982.39$203
Jul 202005538.371.83$100
Jun 202004934.901.69$83
May 202005916.921.81$107
Apr 202006514.751.80$117
Mar 202015930.341.86$140
Feb 202007049.881.98$139
Jan 202007257.252.09$151
Dec 201908259.012.30$189
Nov 201908455.302.75$231
Oct 201908153.472.42$196
Sep 201908855.052.66$234
Aug 201908453.112.30$194
Jul 201908256.272.46$202
Jun 201907952.782.49$197
May 201929658.482.74$380
Apr 201909962.632.75$272
Mar 2019011256.803.06$343
Feb 2019010150.852.79$282
Jan 2019010946.033.23$352
Dec 2018011746.594.19$490
Nov 2018012552.934.24$530
Oct 2018012961.443.40$438
Sep 2018011859.543.11$367
Aug 2018012559.403.07$383
Jul 2018012365.142.93$361
Jun 2018013160.183.08$403
May 2018013865.382.90$400
Apr 2018014763.842.90$426
Mar 2018015261.222.79$424
Feb 2018014661.782.77$404
Jan 2018014962.874.01$597
Dec 2017015557.272.92$453
Nov 2017015155.423.12$471
Oct 2017014949.292.98$445
Sep 2017316147.523.09$640
Aug 2017017245.373.00$517
Jul 2017016943.873.09$522
Jun 2017016442.493.09$506
May 2017015145.373.26$493
Apr 2017016647.933.21$533
Mar 2017013446.772.98$400
Feb 2017011650.452.95$343
Jan 2017014249.413.42$485
Dec 2016015948.763.72$592
Nov 2016016542.492.64$436
Oct 2016017246.193.09$532
Sep 2016016841.553.10$521
Aug 2016017241.442.92$503
Jul 2016019141.622.92$559
Jun 2016018945.352.69$508
May 2016019142.521.99$380
Apr 2016020636.561.99$410
Mar 2016025633.011.79$459
Feb 2016027126.472.06$559
Jan 2016024327.352.36$575
Dec 2015024132.362.00$482
Nov 2015022738.792.17$492
Oct 2015024143.552.43$585
Sep 2015024442.992.76$673
Aug 2015026440.162.87$758
Jul 2015027148.152.95$798
Jun 2015025856.152.88$744
May 2015027755.212.96$819
Apr 2015027149.822.71$733
Mar 2015025942.892.93$760
Feb 2015026244.662.98$780
Jan 2015028543.433.10$884
Dec 2014031654.693.59$1,135
Nov 2014031170.464.25$1,322
Oct 2014032178.303.90$1,252
Sep 2014032086.164.05$1,295
Aug 2014031589.394.04$1,271
Jul 2014033696.564.18$1,404
Jun 2014033898.164.74$1,601
May 2014035594.734.73$1,678
Apr 2014033795.944.81$1,621
Mar 2014026695.895.06$1,345
Feb 2014032497.406.19$2,006
Jan 2014040190.404.86$1,949
Dec 2013036791.824.35$1,598
Nov 2013035788.853.74$1,335
Oct 2013039997.423.78$1,508
Sep 20130374104.113.72$1,390
Aug 20130386104.253.52$1,360
Jul 20130385102.523.72$1,431
Jun 2013034294.403.93$1,345
May 2013043294.834.15$1,792
Apr 2013052893.964.28$2,261
Mar 2013053193.623.91$2,078
Feb 2013057791.233.42$1,973
Jan 201305791.603.42$195
Dec 2012072586.773.42$2,480
Nov 2012061386.953.62$2,222
Oct 2012057889.383.40$1,965
Sep 2012058194.672.92$1,696
Aug 2012048592.662.91$1,410
Jul 2012058185.133.02$1,755
Jun 2012058679.822.52$1,476
May 2012062791.612.49$1,560
Apr 20120626101.652.00$1,250
Mar 20120702105.052.22$1,560
Feb 20120656101.102.57$1,686
Jan 2012071098.092.73$1,941
Dec 2011065696.873.24$2,125
Nov 2011072295.723.31$2,391
Oct 2011072684.983.65$2,649
Sep 2011073083.623.99$2,910
Aug 2011075983.404.15$3,149
Jul 2011078794.144.52$3,555
Jun 2011078492.904.64$3,638
May 2011082498.134.40$3,630
Apr 20110750105.964.33$3,250
Mar 2011087096.364.06$3,530
Feb 2011077385.644.18$3,231
Jan 2011086286.504.59$3,956
Dec 2010085385.734.35$3,709
Nov 2010091580.843.80$3,473
Oct 2010094278.103.51$3,305
Sep 2010092672.633.98$3,685
Aug 2010096973.684.42$4,282
Jul 2010098372.554.74$4,656
Jun 2010090970.364.91$4,464
May 2010091371.124.24$3,867
Apr 201001,06681.694.12$4,395
Mar 201001,26578.394.39$5,552
Feb 201001,21273.585.44$6,596
Jan 2010083974.365.96$5,004
Dec 200901,02271.445.48$5,604
Nov 200901,22074.593.75$4,577
Oct 200901,23672.544.11$5,080
Sep 200901,15365.543.06$3,534
Aug 200901,38567.423.22$4,458
Jul 200901,34061.133.46$4,642
Jun 200901,24866.163.90$4,861
May 200901,26354.743.93$4,958
Apr 200901,08846.773.59$3,903
Mar 200901,17142.144.06$4,753
Feb 200901,32232.814.63$6,125
Jan 200901,48735.865.37$7,987
Dec 200801,55637.105.98$9,300
Nov 200801,45655.496.86$9,989
Oct 200801,24075.246.92$8,583
Sep 200801,481101.767.88$11,666
Aug 200801,644114.228.48$13,946
Jul 200801,696131.0811.39$19,316
Jun 200861,742131.3313.03$23,491
May 2008141,502123.1711.57$19,109
Apr 200801,778110.3110.45$18,589
Mar 200801,969101.909.66$19,029
Feb 2008131,94592.538.77$18,262
Jan 200802,17590.388.21$17,847
Dec 200702,33588.337.30$17,050
Nov 200701,80191.677.29$13,132
Oct 200701,96682.856.92$13,609
Sep 200702,06975.846.24$12,919
Aug 2007141,88669.066.39$13,014
Jul 200701,61170.906.39$10,291
Jun 200701,41262.007.55$10,658
May 200702,56558.747.85$20,126
Apr 2007252,68059.617.81$22,408
Mar 200702,94756.927.30$21,519
Feb 200703,16955.108.22$26,037
Jan 200703,90550.306.73$26,268
Dec 200665,46056.656.92$38,115

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   58 Mcf  × $  3.05 =       $177

────────────────────────────────────────────────────
Month total                                     $177

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/229118 is the state's own key, not one this site invented.