FIELDS 14

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 219032District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.2 M
Feb 2006 – May 2026
Value, last 12 filed months
$440
at the published price for each month
Months reported
244
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-10-19168807
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition270 bbl$18,864
GasProduction189,414 Mcf$1,200,047
Total$1,218,911

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5077, -100.5788. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.50770, -100.57883 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
5,779 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,779 ft.

Completions filed
Feb 2006
1 of 1 wells

1 well

42-4353778285,779 ftFeb 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (244)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

244 months

May 2026011106.413.05$34
Apr 20260698.932.87$17
Mar 20260789.753.15$22
Feb 20260763.503.75$26
Jan 20260859.138.00$64
Dec 20250756.664.41$31
Nov 20250858.593.93$31
Oct 202501059.383.30$33
Sep 202501262.743.08$37
Aug 202501563.933.01$45
Jul 202501566.743.32$50
Jun 202501666.483.13$50
May 202501060.553.23$32
Apr 202501062.363.54$35
Mar 202503167.704.27$132
Feb 202507170.884.34$308
Jan 202507874.324.28$334
Dec 202407668.993.12$237
Nov 202407369.052.20$160
Oct 202406971.372.28$157
Sep 202405869.612.36$137
Aug 202403575.632.06$72
Jul 20240779.932.15$15
Jun 202402378.082.63$61
May 202435678.812.20$360
Apr 202405584.451.66$91
Mar 202406080.301.55$93
Feb 202405876.091.78$103
Jan 202406173.023.30$201
Dec 202306471.262.61$167
Nov 202306377.892.81$177
Oct 202304685.443.09$142
Sep 202305989.042.74$161
Aug 202306380.522.67$168
Jul 202306574.852.64$172
Jun 202306268.962.26$140
May 202307070.622.23$156
Apr 202306878.122.24$152
Mar 202306672.852.39$158
Feb 202305875.112.47$143
Jan 202326076.533.39$356
Dec 202204676.415.73$264
Nov 202204685.005.65$260
Oct 202203487.185.86$199
Sep 202205584.888.16$449
Aug 202205594.529.13$502
Jul 2022054101.587.54$407
Jun 2022052115.097.98$415
May 2022052109.378.43$439
Apr 2022258104.226.84$605
Mar 2022061108.885.08$310
Feb 202205291.054.86$253
Jan 202206181.844.54$277
Dec 202106071.323.90$234
Nov 202105677.435.24$293
Oct 202105979.795.71$337
Sep 202125669.865.35$439
Aug 202105666.024.22$236
Jul 202105770.783.98$227
Jun 202105369.493.38$179
May 202105463.483.02$163
Apr 202105460.362.76$149
Mar 202104461.302.72$120
Feb 202103257.805.55$178
Jan 202104450.412.81$124
Dec 202013044.642.68$125
Nov 202002838.772.71$76
Oct 202002836.972.48$69
Sep 202003237.091.99$64
Aug 202002939.982.39$69
Jul 202001338.371.83$24
Jun 202001834.901.69$30
May 202001416.921.81$25
Apr 202001614.751.80$29
Mar 202011730.341.86$62
Feb 202003449.881.98$67
Jan 202003657.252.09$75
Dec 201904059.012.30$92
Nov 201904155.302.75$113
Oct 201904153.472.42$99
Sep 201904955.052.66$130
Aug 201903953.112.30$90
Jul 201903656.272.46$89
Jun 201903652.782.49$90
May 201914158.482.74$171
Apr 201904062.632.75$110
Mar 201903756.803.06$113
Feb 201903150.852.79$87
Jan 201904646.033.23$149
Dec 201805046.594.19$209
Nov 201804552.934.24$191
Oct 201803661.443.40$122
Sep 201804359.543.11$134
Aug 201804659.403.07$141
Jul 201804565.142.93$132
Jun 201804860.183.08$148
May 201805165.382.90$148
Apr 201805263.842.90$151
Mar 201805561.222.79$153
Feb 201805361.782.77$147
Jan 201805462.874.01$217
Dec 201705757.272.92$167
Nov 201705655.423.12$175
Oct 201705549.292.98$164
Sep 201715847.523.09$227
Aug 201706345.373.00$189
Jul 201706343.873.09$195
Jun 201706442.493.09$198
May 201706245.373.26$202
Apr 201706947.933.21$222
Mar 201705446.772.98$161
Feb 201704950.452.95$145
Jan 201706549.413.42$222
Dec 201607248.763.72$268
Nov 201608142.492.64$214
Oct 201608746.193.09$269
Sep 201608941.553.10$276
Aug 201609241.442.92$269
Jul 2016010241.622.92$298
Jun 2016010845.352.69$290
May 2016010842.521.99$215
Apr 2016014036.561.99$279
Mar 201609833.011.79$176
Feb 2016015526.472.06$320
Jan 2016012527.352.36$296
Dec 20150132.362.00$2
Nov 20150038.792.17$0
Oct 201509743.552.43$235
Sep 2015013242.992.76$364
Aug 2015012440.162.87$356
Jul 2015017148.152.95$504
Jun 2015017156.152.88$493
May 2015020655.212.96$609
Apr 2015029249.822.71$790
Mar 2015021042.892.93$616
Feb 2015020744.662.98$616
Jan 2015025443.433.10$788
Dec 2014030554.693.59$1,095
Nov 2014010470.464.25$442
Oct 20140078.303.90$0
Sep 2014019486.164.05$785
Aug 2014035989.394.04$1,449
Jul 2014043396.564.18$1,810
Jun 2014043498.164.74$2,056
May 2014047894.734.73$2,259
Apr 2014043995.944.81$2,111
Mar 2014016395.895.06$824
Feb 2014031797.406.19$1,963
Jan 2014035290.404.86$1,711
Dec 2013033491.824.35$1,454
Nov 2013030688.853.74$1,144
Oct 2013060397.423.78$2,279
Sep 20130595104.113.72$2,212
Aug 20130661104.253.52$2,328
Jul 20130597102.523.72$2,219
Jun 2013036894.403.93$1,447
May 2013032994.834.15$1,365
Apr 2013044393.964.28$1,897
Mar 2013051793.623.91$2,023
Feb 2013046991.233.42$1,604
Jan 2013057191.603.42$1,953
Dec 2012048986.773.42$1,672
Nov 2012046586.953.62$1,686
Oct 2012051189.383.40$1,737
Sep 2012039894.672.92$1,162
Aug 2012050092.662.91$1,454
Jul 2012051285.133.02$1,547
Jun 2012055179.822.52$1,388
May 2012057791.612.49$1,436
Apr 20120559101.652.00$1,116
Mar 20120576105.052.22$1,280
Feb 20120510101.102.57$1,311
Jan 2012046798.092.73$1,277
Dec 2011051796.873.24$1,675
Nov 2011065895.723.31$2,179
Oct 2011071884.983.65$2,620
Sep 2011068583.623.99$2,730
Aug 2011083283.404.15$3,452
Jul 2011098294.144.52$4,436
Jun 2011037992.904.64$1,759
May 2011053598.134.40$2,357
Apr 20110505105.964.33$2,188
Mar 2011069896.364.06$2,832
Feb 2011070285.644.18$2,934
Jan 2011271186.504.59$3,436
Dec 2010049285.734.35$2,139
Nov 2010061980.843.80$2,349
Oct 2010055178.103.51$1,933
Sep 2010081772.633.98$3,251
Aug 2010086673.684.42$3,827
Jul 2010088072.554.74$4,168
Jun 2010089570.364.91$4,395
May 2010093171.124.24$3,943
Apr 2010083781.694.12$3,451
Mar 201001,00178.394.39$4,393
Feb 2010089573.585.44$4,871
Jan 201001,06774.365.96$6,364
Dec 200901,07371.445.48$5,884
Nov 200901,15674.593.75$4,337
Oct 200901,18972.544.11$4,887
Sep 200901,13065.543.06$3,463
Aug 200901,25867.423.22$4,049
Jul 200901,26061.133.46$4,365
Jun 200901,21466.163.90$4,729
May 200901,13454.743.93$4,452
Apr 2009098946.773.59$3,548
Mar 200901,05942.144.06$4,298
Feb 2009087832.814.63$4,068
Jan 200901,19735.865.37$6,429
Dec 200801,59937.105.98$9,557
Nov 200801,61955.496.86$11,107
Oct 200801,60875.246.92$11,131
Sep 200801,646101.767.88$12,966
Aug 200801,827114.228.48$15,498
Jul 200801,763131.0811.39$20,080
Jun 200871,841131.3313.03$24,912
May 2008151,980123.1711.57$24,765
Apr 200801,923110.3110.45$20,105
Mar 200802,087101.909.66$20,169
Feb 2008152,00392.538.77$18,955
Jan 200802,06090.388.21$16,904
Dec 200702,14288.337.30$15,641
Nov 200702,20291.677.29$16,056
Oct 200702,39682.856.92$16,585
Sep 200702,45775.846.24$15,342
Aug 2007162,34269.066.39$16,066
Jul 200701,77670.906.39$11,345
Jun 200701,59562.007.55$12,040
May 200702,72858.747.85$21,405
Apr 2007222,91859.617.81$24,087
Mar 200703,20956.927.30$23,432
Feb 200703,25655.108.22$26,751
Jan 200703,21750.306.73$21,640
Dec 2006373,66456.656.92$27,445
Nov 200604,04854.207.62$30,836
Oct 2006374,89454.906.01$31,463
Sep 200605,16060.085.04$25,992
Aug 2006405,97468.717.34$46,597
Jul 200606,53069.376.34$41,418
Jun 200606,88466.286.38$43,947
May 2006478,03666.016.42$54,734
Apr 2006199,76564.397.36$73,099
Mar 2006014,33956.707.08$101,562
Feb 2006012,99557.597.75$100,726

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   11 Mcf  × $  3.05 =        $34

────────────────────────────────────────────────────
Month total                                      $34

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/219032 is the state's own key, not one this site invented.