THOMSON

Operated by UPP OPERATING, LLC (P-5 875310) in the SONORA (CANYON UPPER) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 19233District 7CField 84646500NGPA filingCondensateGasSaveExport
Value, all time
$640 k
Jan 1993 – May 2026
Value, last 12 filed months
$7 k
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 959 leases and 959 wells, and the rule below applies to all of them.

Discovered
1954-05-01
as the register files it
Field class
Gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1993-09-13.

The Commission's schedule remark for this field reads: EFFECTIVE JAN 1; ANNUAL TESTING. ALL WELLS EXEMPT FROM SIWHP.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1 bbl$16
GasProduction176,450 Mcf$639,775
Total$639,791

28,251 Mcf of this lease's gas, across 47 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6654, -100.5723. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.66543, -100.57232 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
5,605 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,605 ft.

Completions filed
Sep 1954
1 of 1 wells

1 well

42-435001581 F5,605 ftSep 1954

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 20260159106.413.05$484
Apr 2026015598.932.87$445
Mar 2026016189.753.15$507
Feb 2026015863.503.75$593
Jan 2026017659.138.00$1,408
Dec 2025016456.664.41$724
Nov 2025015058.593.93$589
Oct 2025016059.383.30$529
Sep 2025015762.743.08$483
Aug 2025016363.933.01$491
Jul 2025016766.743.32$554
Jun 2025015666.483.13$488
May 2025016260.553.23$524
Apr 2025015562.363.54$549
Mar 2025015567.704.27$662
Feb 2025013970.884.34$603
Jan 2025015374.324.28$655
Dec 2024015968.993.12$496
Nov 2024015669.052.20$343
Oct 2024016471.372.28$374
Sep 2024015869.612.36$374
Aug 2024016675.632.06$343
Jul 2024016579.932.15$354
Jun 2024015578.082.63$408
May 2024015578.812.20$341
Apr 2024015184.451.66$251
Mar 2024015480.301.55$238
Feb 2024014476.091.78$257
Jan 2024014973.023.30$491
Dec 2023015771.262.61$410
Nov 2023015277.892.81$427
Oct 2023016185.443.09$497
Sep 2023015789.042.74$429
Aug 2023016280.522.67$433
Jul 2023016374.852.64$431
Jun 2023015868.962.26$357
May 2023016370.622.23$363
Apr 2023015578.122.24$347
Mar 2023015872.852.39$378
Feb 2023013875.112.47$340
Jan 2023015276.533.39$515
Dec 2022015276.415.73$871
Nov 2022015185.005.65$853
Oct 2022016087.185.86$938
Sep 2022015184.888.16$1,233
Aug 2022016194.529.13$1,469
Jul 20220161101.587.54$1,214
Jun 20220155115.097.98$1,236
May 20220159109.378.43$1,341
Apr 20220152104.226.84$1,039
Mar 20220159108.885.08$807
Feb 2022013591.054.86$656
Jan 2022015481.844.54$699
Dec 2021016071.323.90$624
Nov 2021015577.435.24$812
Oct 2021016079.795.71$914
Sep 2021015969.865.35$851
Aug 2021016366.024.22$688
Jul 2021015770.783.98$625
Jun 2021016069.493.38$541
May 2021016163.483.02$486
Apr 2021015760.362.76$433
Mar 2021015561.302.72$421
Feb 2021013657.805.55$755
Jan 2021015750.412.81$441
Dec 2020015744.642.68$420
Nov 2020015538.772.71$420
Oct 2020016936.972.48$419
Sep 2020016337.091.99$325
Aug 2020017439.982.39$415
Jul 2020017938.371.83$327
Jun 2020017334.901.69$292
May 2020017216.921.81$312
Apr 2020016814.751.80$303
Mar 2020017730.341.86$329
Feb 2020015449.881.98$305
Jan 2020015957.252.09$333
Dec 2019015859.012.30$364
Nov 2019016055.302.75$440
Oct 2019017553.472.42$423
Sep 2019017755.052.66$470
Aug 2019018553.112.30$426
Jul 2019018756.272.46$460
Jun 2019016852.782.49$419
May 2019017758.482.74$485
Apr 2019016362.632.75$448
Mar 2019016856.803.06$514
Feb 2019015650.852.79$436
Jan 2019015646.033.23$504
Dec 2018017246.594.19$720
Nov 2018016852.934.24$712
Oct 2018017861.443.40$605
Sep 2018017759.543.11$550
Aug 2018018159.403.07$555
Jul 2018018365.142.93$537
Jun 2018017760.183.08$545
May 2018018665.382.90$540
Apr 2018019463.842.90$563
Mar 2018021561.222.79$599
Feb 2018019561.782.77$539
Jan 2018021862.874.01$874
Dec 2017021057.272.92$614
Nov 2017019755.423.12$614
Oct 2017019149.292.98$570
Sep 2017017847.523.09$550
Aug 2017017445.373.00$523
Jul 2017017343.873.09$534
Jun 2017017242.493.09$531
May 2017018445.373.26$600
Apr 2017018147.933.21$581
Mar 2017018646.772.98$555
Feb 2017017150.452.95$505
Jan 2017018949.413.42$646
Dec 2016018048.763.72$670
Nov 2016016442.492.64$434
Oct 2016017046.193.09$525
Sep 2016016441.553.10$509
Aug 2016016741.442.92$488
Jul 2016016841.622.92$491
Jun 2016016345.352.69$438
May 2016017242.521.99$342
Apr 2016016936.561.99$336
Mar 2016018133.011.79$325
Feb 2016018526.472.06$382
Jan 2016020727.352.36$489
Dec 2015019432.362.00$388
Nov 2015018838.792.17$407
Oct 2015018943.552.43$459
Sep 2015018142.992.76$499
Aug 2015017240.162.87$494
Jul 2015017648.152.95$518
Jun 2015017456.152.88$502
May 2015018455.212.96$544
Apr 2015018149.822.71$490
Mar 2015019742.892.93$578
Feb 2015018044.662.98$536
Jan 2015022043.433.10$682
Dec 2014020054.693.59$718
Nov 2014020170.464.25$855
Oct 2014020178.303.90$784
Sep 2014019386.164.05$781
Aug 2014019789.394.04$795
Jul 2014020296.564.18$844
Jun 2014019798.164.74$933
May 2014021194.734.73$997
Apr 2014021895.944.81$1,048
Mar 2014022495.895.06$1,133
Feb 2014018697.406.19$1,152
Jan 2014020990.404.86$1,016
Dec 2013020391.824.35$884
Nov 2013019288.853.74$718
Oct 2013019897.423.78$748
Sep 20130194104.113.72$721
Aug 20130209104.253.52$736
Jul 20130217102.523.72$807
Jun 2013021494.403.93$842
May 2013020994.834.15$867
Apr 2013020593.964.28$878
Mar 2013019993.623.91$779
Feb 2013018491.233.42$629
Jan 2013022391.603.42$763
Dec 2012022386.773.42$763
Nov 2012021486.953.62$776
Oct 2012022689.383.40$768
Sep 2012022394.672.92$651
Aug 2012023092.662.91$669
Jul 2012023485.133.02$707
Jun 2012022779.822.52$572
May 2012023791.612.49$590
Apr 20120234101.652.00$467
Mar 20120247105.052.22$549
Feb 20120236101.102.57$607
Jan 2012025898.092.73$705
Dec 2011026096.873.24$842
Nov 2011024795.723.31$818
Oct 2011025484.983.65$927
Sep 2011024083.623.99$957
Aug 2011025583.404.15$1,058
Jul 2011026294.144.52$1,184
Jun 2011025692.904.64$1,188
May 2011027698.134.40$1,216
Apr 20110281105.964.33$1,218
Mar 2011034796.364.06$1,408
Feb 2011032085.644.18$1,338
Jan 2011031586.504.59$1,445
Dec 2010031985.734.35$1,387
Nov 2010031680.843.80$1,199
Oct 2010033178.103.51$1,161
Sep 2010030472.633.98$1,210
Aug 2010031273.684.42$1,379
Jul 2010032472.554.74$1,535
Jun 2010031570.364.91$1,547
May 2010034271.124.24$1,448
Apr 2010033581.694.12$1,381
Mar 2010034878.394.39$1,527
Feb 2010031573.585.44$1,714
Jan 2010035074.365.96$2,087
Dec 2009035571.445.48$1,947
Nov 2009034874.593.75$1,306
Oct 2009035772.544.11$1,467
Sep 2009034465.543.06$1,054
Aug 2009087967.423.22$2,829
Jul 2009035161.133.46$1,216
Jun 2009034066.163.90$1,324
May 2009037054.743.93$1,453
Apr 2009037646.773.59$1,349
Mar 2009039242.144.06$1,591
Feb 2009035832.814.63$1,659
Jan 2009039435.865.37$2,116
Dec 2008039937.105.98$2,385
Nov 2008039355.496.86$2,696
Oct 2008040575.246.92$2,803
Sep 20080361101.767.88$2,844
Aug 20080356114.228.48$3,020
Jul 20080382131.0811.39$4,351
Jun 20080412131.3313.03$5,369
May 20080428123.1711.57$4,954
Apr 20080421110.3110.45$4,402
Mar 20080435101.909.66$4,204
Feb 2008040892.538.77$3,578
Jan 2008043890.388.21$3,594
Dec 2007044588.337.30$3,249
Nov 2007044591.677.29$3,245
Oct 2007045582.856.92$3,150
Sep 2007043175.846.24$2,691
Aug 2007046669.066.39$2,977
Jul 2007046970.906.39$2,996
Jun 2007046162.007.55$3,480
May 2007048358.747.85$3,790
Apr 2007047759.617.81$3,723
Mar 2007049656.927.30$3,622
Feb 2007044955.108.22$3,689
Jan 2007051650.306.73$3,471
Dec 2006052356.656.92$3,618
Nov 2006047954.207.62$3,649
Oct 2006050054.906.01$3,007
Sep 2006047960.085.04$2,413
Aug 2006046568.717.34$3,413
Jul 2006048269.376.34$3,057
Jun 2006047866.286.38$3,051
May 2006053566.016.42$3,437
Apr 2006054364.397.36$3,997
Mar 2006056856.707.08$4,023
Feb 2006051757.597.75$4,007
Jan 2006057560.598.93$5,137
Dec 2005056154.9413.42$7,526
Nov 2005052754.6910.59$5,580
Oct 2005060258.3413.80$8,305
Sep 2005053461.4512.08$6,450
Aug 2005055961.519.80$5,476
Jul 2005056055.697.84$4,392
Jun 2005055252.337.38$4,074
May 2005057145.226.65$3,798
Apr 2005053949.207.36$3,967
Mar 2005059550.377.15$4,257
Feb 2005056245.226.31$3,547
Jan 2005066543.166.32$4,204
Dec 2004068639.866.75$4,631
Nov 2004068245.286.33$4,317
Oct 2004068449.706.52$4,456
Sep 2004066343.245.28$3,503
Aug 2004065042.375.55$3,608
Jul 2004063238.286.08$3,845
Jun 2004065736.106.43$4,226
May 2004063637.486.49$4,131
Apr 2004062134.475.86$3,638
Mar 2004064134.365.53$3,545
Feb 2004062332.455.51$3,432
Jan 2004068232.036.30$4,296
Dec 2003067830.266.30$4,273
Nov 2003068728.804.60$3,157
Oct 2003070828.174.76$3,370
Sep 2003069726.314.75$3,310
Aug 2003065229.765.13$3,345
Jul 2003071429.415.17$3,692
Jun 2003072628.565.98$4,344
May 2003029926.595.97$1,786
Apr 2003071226.675.41$3,850
Mar 2003071931.146.10$4,383
Feb 2003066533.487.93$5,271
Jan 2003074530.315.58$4,159
Dec 2002073926.914.85$3,587
Nov 2002071624.664.14$2,962
Oct 2002075726.464.23$3,201
Sep 2002072127.443.64$2,621
Aug 2002072825.963.16$2,304
Jul 2002076024.583.06$2,327
Jun 2002076623.733.34$2,557
May 2002069924.663.58$2,505
Apr 2002075823.653.51$2,662
Mar 2002080522.003.10$2,498
Feb 2002063518.222.38$1,509
Jan 2002069017.172.38$1,639
Dec 2001084916.932.36$2,007
Nov 2001069018.072.41$1,660
Oct 2001074319.782.53$1,879
Sep 2001076524.262.25$1,722
Aug 2001073224.873.05$2,235
Jul 2001099523.933.20$3,181
Jun 2001064024.563.82$2,447
May 2001085325.524.31$3,674
Apr 2001079524.685.34$4,242
Mar 2001085324.545.38$4,586
Feb 2001083527.755.77$4,816
Jan 2001088827.478.40$7,458
Dec 2000082126.889.12$7,490
Nov 2000081732.215.66$4,623
Oct 2000094531.235.15$4,863
Sep 2000092631.875.19$4,803
Aug 2000099429.644.54$4,514
Jul 200001,03128.534.09$4,217
Jun 200001,02529.304.40$4,507
May 200001,07927.263.68$3,970
Apr 200001,00824.513.12$3,141
Mar 200001,04228.422.86$2,980
Feb 2000097127.622.73$2,647
Jan 200001,11425.272.48$2,763
Dec 199901,12224.282.42$2,719
Nov 1999096323.192.43$2,344
Oct 1999093120.982.80$2,610
Sep 1999090921.752.62$2,381
Aug 1999095219.262.88$2,738
Jul 1999095417.892.37$2,263
Jun 1999095415.942.36$2,253
May 1999097215.792.32$2,256
Apr 199901,01815.102.21$2,248
Mar 199901,03912.471.84$1,910
Feb 199909319.981.82$1,692
Jan 199901,04110.381.90$1,978
Dec 199801,0919.201.77$1,935
Nov 199801,08810.892.19$2,378
Oct 199801,10012.421.97$2,166
Sep 1998093212.592.08$1,941
Aug 199801,15811.301.91$2,209
Jul 199801,07211.742.24$2,398
Jun 199801,15211.242.24$2,577
May 199801,21512.622.21$2,681
Apr 199801,27213.042.51$3,187
Mar 199801,27512.802.31$2,945
Feb 199801,14813.952.30$2,639
Jan 199801,25714.702.15$2,709
Dec 1997099816.322.41$2,406
Nov 1997090218.193.09$2,786
Oct 199701,07219.253.15$3,377
Sep 199701,04617.742.95$3,091
Aug 1997099917.862.55$2,552
Jul 1997073717.582.25$1,656
Jun 1997073917.242.26$1,668
May 1997076518.972.31$1,766
Apr 1997077017.882.08$1,604
Mar 1997084118.951.94$1,631
Feb 1997078420.492.21$1,729
Jan 1997081323.483.54$2,878
Dec 1996079023.32$0
Nov 1996077321.97$0
Oct 1996080623.31$0
Sep 1996079322.22$0
Aug 1996079520.26$0
Jul 1996080319.55$0
Jun 1996078718.73$0
May 1996085119.43$0
Apr 1996078321.51$0
Mar 1996082019.38$0
Feb 1996073216.98$0
Jan 1996072117.07$0
Dec 1995071917.19$0
Nov 1995082916.00$0
Oct 1995077715.43$0
Sep 1995063716.18$0
Aug 1995074315.92$0
Jul 1995065115.24$0
Jun 1995080916.41$0
May 1995065417.56$0
Apr 1995054117.73$0
Mar 1995072316.44$0
Feb 1995085716.58$0
Jan 1995077815.92$0
Dec 1994071115.03$0
Nov 1994162915.90$16
Oct 1994055015.58$0
Sep 1994071015.29$0
Aug 1994070116.13$0
Jul 1994035117.56$0
Jun 19940017.09$0
May 1994045715.88$0
Apr 1994059814.14$0
Mar 1994035812.46$0
Feb 1994039512.50$0
Jan 1994054912.66$0
Dec 1993052912.33$0
Nov 1993049214.49$0
Oct 1993063315.85$0
Sep 1993025115.03$0
Aug 1993028715.66$0
Jul 1993028715.46$0
Jun 1993021016.79$0
May 1993017517.68$0
Apr 1993022618.05$0
Mar 1993033818.14$0
Feb 1993036017.90$0
Jan 1993028216.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  159 Mcf  × $  3.05 =       $484

────────────────────────────────────────────────────
Month total                                     $484

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/19233 is the state's own key, not one this site invented.