Operated by UPP OPERATING, LLC (P-5 875310) in the SONORA (CANYON UPPER) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 234371District 7CField 846465002 tax incentive programmesCondensateGasSaveExport
Value, all time
$588 k
Feb 2007 – May 2026
Value, last 12 filed months
$8 k
at the published price for each month
Months reported
232
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 959 leases and 959 wells, and the rule below applies to all of them.

Discovered
1954-05-01
as the register files it
Field class
Gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1993-09-13.

The Commission's schedule remark for this field reads: EFFECTIVE JAN 1; ANNUAL TESTING. ALL WELLS EXEMPT FROM SIWHP.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-05-21176660
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition8 bbl$659
GasProduction115,292 Mcf$587,281
Total$587,940

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6623, -100.5763. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.66228, -100.57626 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,219 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,219 ft.

Completions filed
Mar 2007
1 of 1 wells

1 well

42-43538278136,219 ftMar 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (232)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

232 months

May 20260174106.413.05$530
Apr 2026016698.932.87$476
Mar 2026018289.753.15$573
Feb 2026020663.503.75$773
Jan 2026015959.138.00$1,272
Dec 2025013656.664.41$600
Nov 2025015058.593.93$589
Oct 2025017659.383.30$582
Sep 2025018362.743.08$563
Aug 2025019663.933.01$591
Jul 2025017366.743.32$574
Jun 2025016166.483.13$504
May 2025016860.553.23$543
Apr 2025016362.363.54$578
Mar 2025017167.704.27$730
Feb 2025015270.884.34$660
Jan 2025016874.324.28$719
Dec 2024016868.993.12$524
Nov 2024015769.052.20$345
Oct 2024012971.372.28$294
Sep 2024015669.612.36$369
Aug 2024016175.632.06$332
Jul 2024015979.932.15$341
Jun 2024015678.082.63$411
May 2024016878.812.20$369
Apr 2024015984.451.66$264
Mar 2024017180.301.55$264
Feb 20240976.091.78$16
Jan 202401573.023.30$49
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230280.522.67$5
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230770.622.23$16
Apr 20230678.122.24$13
Mar 20230272.852.39$5
Feb 20230275.112.47$5
Jan 20230876.533.39$27
Dec 20220376.415.73$17
Nov 20220485.005.65$23
Oct 202201587.185.86$88
Sep 202203184.888.16$253
Aug 202201494.529.13$128
Jul 2022014101.587.54$106
Jun 202209115.097.98$72
May 2022024109.378.43$202
Apr 202201104.226.84$7
Mar 202201108.885.08$5
Feb 20220291.054.86$10
Jan 20220581.844.54$23
Dec 20210571.323.90$20
Nov 20210777.435.24$37
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 2021010770.783.98$426
Jun 2021017869.493.38$602
May 2021014463.483.02$435
Apr 20210060.362.76$0
Mar 202101761.302.72$46
Feb 20210657.805.55$33
Jan 202106950.412.81$194
Dec 202002644.642.68$70
Nov 202001438.772.71$38
Oct 202001136.972.48$27
Sep 202005437.091.99$108
Aug 202001339.982.39$31
Jul 2020010938.371.83$199
Jun 2020011734.901.69$198
May 2020011916.921.81$216
Apr 2020011514.751.80$208
Mar 2020011530.341.86$213
Feb 2020011449.881.98$226
Jan 2020015957.252.09$333
Dec 2019011359.012.30$260
Nov 2019012655.302.75$347
Oct 2019014853.472.42$358
Sep 2019017755.052.66$470
Aug 2019026053.112.30$599
Jul 2019025356.272.46$622
Jun 2019017752.782.49$441
May 2019017658.482.74$482
Apr 201909962.632.75$272
Mar 2019014656.803.06$447
Feb 2019015050.852.79$419
Jan 2019017846.033.23$575
Dec 2018020846.594.19$871
Nov 2018023152.934.24$979
Oct 2018015361.443.40$520
Sep 2018017059.543.11$528
Aug 2018023959.403.07$733
Jul 2018024265.142.93$710
Jun 2018023760.183.08$729
May 2018024565.382.90$711
Apr 2018027463.842.90$795
Mar 2018042061.222.79$1,170
Feb 2018020461.782.77$564
Jan 2018026862.874.01$1,075
Dec 2017027457.272.92$801
Nov 2017027555.423.12$858
Oct 2017033749.292.98$1,006
Sep 2017037947.523.09$1,170
Aug 2017039045.373.00$1,172
Jul 2017038243.873.09$1,179
Jun 2017038242.493.09$1,179
May 2017039745.373.26$1,296
Apr 2017040647.933.21$1,304
Mar 2017044346.772.98$1,322
Feb 2017040750.452.95$1,202
Jan 2017048249.413.42$1,648
Dec 2016048648.763.72$1,809
Nov 2016046842.492.64$1,238
Oct 2016048246.193.09$1,490
Sep 2016045441.553.10$1,408
Aug 2016049741.442.92$1,453
Jul 2016046341.622.92$1,354
Jun 2016046145.352.69$1,238
May 2016046242.521.99$920
Apr 2016044136.561.99$878
Mar 2016049733.011.79$892
Feb 2016045426.472.06$937
Jan 2016049127.352.36$1,161
Dec 2015051232.362.00$1,025
Nov 2015056138.792.17$1,216
Oct 2015054743.552.43$1,327
Sep 2015040742.992.76$1,123
Aug 2015052640.162.87$1,511
Jul 2015051348.152.95$1,511
Jun 2015049256.152.88$1,418
May 2015057455.212.96$1,696
Apr 2015047349.822.71$1,280
Mar 2015024742.892.93$725
Feb 2015020744.662.98$616
Jan 2015054243.433.10$1,681
Dec 2014058854.693.59$2,112
Nov 2014059070.464.25$2,509
Oct 2014160178.303.90$2,423
Sep 2014156086.164.05$2,352
Aug 2014052489.394.04$2,114
Jul 2014037596.564.18$1,567
Jun 2014040098.164.74$1,895
May 2014047794.734.73$2,255
Apr 2014155795.944.81$2,775
Mar 2014048995.895.06$2,473
Feb 2014047097.406.19$2,910
Jan 2014052690.404.86$2,557
Dec 2013058091.824.35$2,526
Nov 2013058088.853.74$2,168
Oct 2013063397.423.78$2,392
Sep 20131574104.113.72$2,238
Aug 20130556104.253.52$1,959
Jul 20130621102.523.72$2,309
Jun 2013030194.403.93$1,184
May 2013042194.834.15$1,747
Apr 2013058093.964.28$2,484
Mar 2013054993.623.91$2,148
Feb 2013057691.233.42$1,970
Jan 2013055091.603.42$1,881
Dec 2012064886.773.42$2,216
Nov 2012063986.953.62$2,316
Oct 2012066389.383.40$2,254
Sep 2012064994.672.92$1,894
Aug 2012067692.662.91$1,966
Jul 2012068385.133.02$2,063
Jun 2012066179.822.52$1,665
May 2012069891.612.49$1,737
Apr 20120692101.652.00$1,382
Mar 20120683105.052.22$1,518
Feb 20120282101.102.57$725
Jan 2012066898.092.73$1,826
Dec 2011068196.873.24$2,206
Nov 2011066995.723.31$2,215
Oct 2011070084.983.65$2,554
Sep 2011067583.623.99$2,690
Aug 2011071083.404.15$2,946
Jul 2011071294.144.52$3,216
Jun 2011069892.904.64$3,239
May 2011072898.134.40$3,207
Apr 20110706105.964.33$3,059
Mar 2011072896.364.06$2,954
Feb 2011065385.644.18$2,730
Jan 2011072986.504.59$3,345
Dec 2010073885.734.35$3,209
Nov 2010072080.843.80$2,733
Oct 2010074978.103.51$2,628
Sep 2010274072.633.98$3,090
Aug 2010080273.684.42$3,544
Jul 2010081972.554.74$3,879
Jun 2010180570.364.91$4,023
May 2010084571.124.24$3,579
Apr 2010082781.694.12$3,409
Mar 2010185978.394.39$3,848
Feb 2010077773.585.44$4,229
Jan 2010086474.365.96$5,153
Dec 2009087871.445.48$4,815
Nov 2009074974.593.75$2,810
Oct 2009083072.544.11$3,412
Sep 2009081965.543.06$2,510
Aug 2009087167.423.22$2,803
Jul 2009094961.133.46$3,288
Jun 2009085866.163.90$3,342
May 2009084754.743.93$3,325
Apr 2009090446.773.59$3,243
Mar 200901,03242.144.06$4,189
Feb 2009091532.814.63$4,239
Jan 200901,08935.865.37$5,849
Dec 200801,12937.105.98$6,748
Nov 200801,12355.496.86$7,704
Oct 200801,20275.246.92$8,320
Sep 200801,029101.767.88$8,106
Aug 200801,245114.228.48$10,561
Jul 200801,264131.0811.39$14,396
Jun 200801,265131.3313.03$16,486
May 200801,347123.1711.57$15,591
Apr 200801,336110.3110.45$13,968
Mar 200801,448101.909.66$13,994
Feb 200801,39692.538.77$12,244
Jan 200801,51790.388.21$12,448
Dec 200701,58088.337.30$11,537
Nov 200701,61491.677.29$11,769
Oct 200701,79382.856.92$12,411
Sep 200701,82175.846.24$11,371
Aug 200702,03069.066.39$12,968
Jul 200702,26570.906.39$14,469
Jun 200702,60662.007.55$19,671
May 200702,19158.747.85$17,191
Apr 200702,52259.617.81$19,685
Mar 200705,02256.927.30$36,670
Feb 2007070655.108.22$5,801

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  174 Mcf  × $  3.05 =       $530

────────────────────────────────────────────────────
Month total                                     $530

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/234371 is the state's own key, not one this site invented.