THOMSON "B"

Operated by UPP OPERATING, LLC (P-5 875310) in the SONORA (CANYON UPPER) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 208861District 7CField 846465002 tax incentive programmesGasSaveExport
Value, all time
$321 k
Jul 2004 – May 2026
Value, last 12 filed months
$912
at the published price for each month
Months reported
263
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 959 leases and 959 wells, and the rule below applies to all of them.

Discovered
1954-05-01
as the register files it
Field class
Gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1993-09-13.

The Commission's schedule remark for this field reads: EFFECTIVE JAN 1; ANNUAL TESTING. ALL WELLS EXEMPT FROM SIWHP.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-01-31159168
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction45,313 Mcf$320,933
Total$320,933

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6649, -100.5810. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.66490, -100.58098 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,200 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,200 ft.

Completions filed
Jul 2004
1 of 1 wells

1 well

42-4353683826,200 ftJul 2004

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (263)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

263 months

May 202618106.413.05$55
Apr 20261698.932.87$46
Mar 20261889.753.15$57
Feb 20262563.503.75$94
Jan 20261959.138.00$152
Dec 20253256.664.41$141
Nov 20253258.593.93$126
Oct 20252659.383.30$86
Sep 2025062.743.08$0
Aug 20252163.933.01$63
Jul 2025866.743.32$27
Jun 20252166.483.13$66
May 20251160.553.23$36
Apr 20255262.363.54$184
Mar 20252067.704.27$85
Feb 2025070.884.34$0
Jan 2025074.324.28$0
Dec 2024068.993.12$0
Nov 20243169.052.20$68
Oct 20242571.372.28$57
Sep 20242369.612.36$54
Aug 20241575.632.06$31
Jul 2024079.932.15$0
Jun 2024478.082.63$11
May 20241978.812.20$42
Apr 20241284.451.66$20
Mar 20242880.301.55$43
Feb 20242176.091.78$37
Jan 20244873.023.30$158
Dec 20232071.262.61$52
Nov 20231177.892.81$31
Oct 20234385.443.09$133
Sep 20233889.042.74$104
Aug 20231480.522.67$37
Jul 20232074.852.64$53
Jun 2023868.962.26$18
May 20232670.622.23$58
Apr 20232478.122.24$54
Mar 20233972.852.39$93
Feb 20232775.112.47$67
Jan 20232776.533.39$91
Dec 20221376.415.73$74
Nov 20222885.005.65$158
Oct 20224187.185.86$240
Sep 20221484.888.16$114
Aug 20223994.529.13$356
Jul 202225101.587.54$189
Jun 202218115.097.98$144
May 202212109.378.43$101
Apr 202222104.226.84$150
Mar 202239108.885.08$198
Feb 2022891.054.86$39
Jan 20221581.844.54$68
Dec 20211671.323.90$62
Nov 20213277.435.24$168
Oct 20212379.795.71$131
Sep 20212469.865.35$128
Aug 20212766.024.22$114
Jul 20212870.783.98$112
Jun 20212169.493.38$71
May 20212463.483.02$72
Apr 20213560.362.76$97
Mar 20211861.302.72$49
Feb 20212257.805.55$122
Jan 20211650.412.81$45
Dec 20202044.642.68$54
Nov 20202138.772.71$57
Oct 20202936.972.48$72
Sep 20202037.091.99$40
Aug 20202339.982.39$55
Jul 20203338.371.83$60
Jun 20202134.901.69$36
May 20202616.921.81$47
Apr 20202414.751.80$43
Mar 20203330.341.86$61
Feb 20202249.881.98$44
Jan 20202857.252.09$59
Dec 20192659.012.30$60
Nov 20192655.302.75$72
Oct 20194453.472.42$106
Sep 20192355.052.66$61
Aug 20192553.112.30$58
Jul 20192456.272.46$59
Jun 20192452.782.49$60
May 20192558.482.74$69
Apr 20192262.632.75$61
Mar 20193356.803.06$101
Feb 20191750.852.79$47
Jan 20191646.033.23$52
Dec 20182046.594.19$84
Nov 20184252.934.24$178
Oct 2018061.443.40$0
Sep 2018059.543.11$0
Aug 2018059.403.07$0
Jul 2018065.142.93$0
Jun 2018060.183.08$0
May 2018065.382.90$0
Apr 2018063.842.90$0
Mar 2018061.222.79$0
Feb 2018061.782.77$0
Jan 2018062.874.01$0
Dec 2017557.272.92$15
Nov 20173955.423.12$122
Oct 20174049.292.98$119
Sep 20173847.523.09$117
Aug 20173945.373.00$117
Jul 20176943.873.09$213
Jun 2017042.493.09$0
May 20172845.373.26$91
Apr 20174147.933.21$132
Mar 20173746.772.98$110
Feb 20174050.452.95$118
Jan 20173249.413.42$109
Dec 20163948.763.72$145
Nov 20163442.492.64$90
Oct 20164046.193.09$124
Sep 20164141.553.10$127
Aug 20164041.442.92$117
Jul 20164241.622.92$123
Jun 20163445.352.69$91
May 20164042.521.99$80
Apr 20162636.561.99$52
Mar 20163533.011.79$63
Feb 20164426.472.06$91
Jan 2016827.352.36$19
Dec 2015032.362.00$0
Nov 2015038.792.17$0
Oct 2015043.552.43$0
Sep 2015042.992.76$0
Aug 2015240.162.87$6
Jul 20154448.152.95$130
Jun 20155256.152.88$150
May 20155455.212.96$160
Apr 20155349.822.71$143
Mar 20155542.892.93$161
Feb 20155044.662.98$149
Jan 20155543.433.10$171
Dec 20145554.693.59$198
Nov 20145470.464.25$230
Oct 20145778.303.90$222
Sep 20145586.164.05$223
Aug 20145689.394.04$226
Jul 20145796.564.18$238
Jun 20145598.164.74$261
May 20145794.734.73$269
Apr 20145795.944.81$274
Mar 20145895.895.06$293
Feb 20145397.406.19$328
Jan 20145990.404.86$287
Dec 20136091.824.35$261
Nov 20135788.853.74$213
Oct 20135997.423.78$223
Sep 201357104.113.72$212
Aug 201361104.253.52$215
Jul 201358102.523.72$216
Jun 20135794.403.93$224
May 20135994.834.15$245
Apr 20135793.964.28$244
Mar 20136093.623.91$235
Feb 20135491.233.42$185
Jan 20135991.603.42$202
Dec 20126086.773.42$205
Nov 20126186.953.62$221
Oct 20126289.383.40$211
Sep 20126194.672.92$178
Aug 20126292.662.91$180
Jul 20126485.133.02$193
Jun 20126279.822.52$156
May 20126591.612.49$162
Apr 201264101.652.00$128
Mar 201263105.052.22$140
Feb 201234101.102.57$87
Jan 20123798.092.73$101
Dec 20116696.873.24$214
Nov 20116395.723.31$209
Oct 20116384.983.65$230
Sep 20116383.623.99$251
Aug 20116383.404.15$261
Jul 20116594.144.52$294
Jun 20116292.904.64$288
May 20116598.134.40$286
Apr 201164105.964.33$277
Mar 20116796.364.06$272
Feb 20115685.644.18$234
Jan 20116686.504.59$303
Dec 20106685.734.35$287
Nov 20106380.843.80$239
Oct 20105978.103.51$207
Sep 20105572.633.98$219
Aug 20104073.684.42$177
Jul 20103972.554.74$185
Jun 20103970.364.91$192
May 20104071.124.24$169
Apr 20103981.694.12$161
Mar 20103978.394.39$171
Feb 20103373.585.44$180
Jan 20103674.365.96$215
Dec 20093671.445.48$197
Nov 20093474.593.75$128
Oct 20093572.544.11$144
Sep 20093465.543.06$104
Aug 20097467.423.22$238
Jul 2009061.133.46$0
Jun 2009066.163.90$0
May 20094054.743.93$157
Apr 2009046.773.59$0
Mar 20095142.144.06$207
Feb 20094332.814.63$199
Jan 20094435.865.37$236
Dec 20084437.105.98$263
Nov 20084255.496.86$288
Oct 20083975.246.92$270
Sep 200859101.767.88$465
Aug 200850114.228.48$424
Jul 200857131.0811.39$649
Jun 200845131.3313.03$586
May 200850123.1711.57$579
Apr 200865110.3110.45$680
Mar 200855101.909.66$532
Feb 20084692.538.77$403
Jan 20085090.388.21$410
Dec 20075888.337.30$424
Nov 20075391.677.29$386
Oct 20078782.856.92$602
Sep 20077075.846.24$437
Aug 20076369.066.39$402
Jul 20078970.906.39$569
Jun 20077162.007.55$536
May 20079058.747.85$706
Apr 20075659.617.81$437
Mar 200710556.927.30$767
Feb 20074555.108.22$370
Jan 20076350.306.73$424
Dec 200647956.656.92$3,314
Nov 200662754.207.62$4,776
Oct 200615554.906.01$932
Sep 200615060.085.04$756
Aug 200615968.717.34$1,167
Jul 200616469.376.34$1,040
Jun 200616366.286.38$1,041
May 200617366.016.42$1,112
Apr 200617464.397.36$1,281
Mar 200618456.707.08$1,303
Feb 200616857.597.75$1,302
Jan 200617360.598.93$1,545
Dec 200546154.9413.42$6,185
Nov 20051,78354.6910.59$18,879
Oct 20051,61358.3413.80$22,253
Sep 20051,98961.4512.08$24,025
Aug 20051,92861.519.80$18,888
Jul 20052,46055.697.84$19,295
Jun 20052,09352.337.38$15,449
May 20051,77245.226.65$11,786
Apr 20051,36649.207.36$10,054
Mar 20052,25250.377.15$16,113
Feb 20052,29445.226.31$14,480
Jan 20052,64843.166.32$16,741
Dec 20042,37839.866.75$16,054
Nov 20041,95445.286.33$12,370
Oct 20041,88449.706.52$12,274
Sep 20041,53343.245.28$8,100
Aug 20041,68542.375.55$9,353
Jul 20041,96638.286.08$11,962

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Gas                   18 Mcf  × $  3.05 =        $55

────────────────────────────────────────────────────
Month total                                      $55

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/208861 is the state's own key, not one this site invented.