MILLSPAUGH, S. #14

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 214985District 7CField 679952002 tax incentive programmesCondensateGasSaveExport
Value, all time
$842 k
Nov 2005 – May 2026
Value, last 12 filed months
$11 k
at the published price for each month
Months reported
247
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-01-09172394
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition34 bbl$2,196
GasProduction154,350 Mcf$840,112
Total$842,308

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5287, -101.4358. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.52873, -101.43581 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,000 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,000 ft.

Completions filed
Nov 2005
1 of 1 wells

1 well

42-1053975797,000 ftNov 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (247)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

247 months

May 20260129106.413.05$393
Apr 2026132098.932.87$1,017
Mar 20260089.753.15$0
Feb 2026119363.503.75$787
Jan 2026221059.138.00$1,798
Dec 2025322856.664.41$1,176
Nov 2025325658.593.93$1,181
Oct 2025226559.383.30$995
Sep 2025126462.743.08$875
Aug 2025225263.933.01$888
Jul 2025229866.743.32$1,121
Jun 2025229166.483.13$1,043
May 2025329160.553.23$1,122
Apr 2025328562.363.54$1,197
Mar 2025429167.704.27$1,513
Feb 2025529270.884.34$1,622
Jan 20250074.324.28$0
Dec 2024017368.993.12$540
Nov 2024017969.052.20$394
Oct 2024022271.372.28$506
Sep 2024020869.612.36$492
Aug 2024040875.632.06$842
Jul 2024023379.932.15$500
Jun 2024021278.082.63$558
May 2024029078.812.20$638
Apr 2024036984.451.66$612
Mar 2024030080.301.55$464
Feb 2024033976.091.78$605
Jan 2024038273.023.30$1,260
Dec 2023043271.262.61$1,128
Nov 2023035477.892.81$994
Oct 2023042785.443.09$1,318
Sep 2023038189.042.74$1,042
Aug 2023018680.522.67$497
Jul 202306674.852.64$174
Jun 2023013068.962.26$294
May 2023010670.622.23$236
Apr 2023021678.122.24$483
Mar 202307172.852.39$170
Feb 202307375.112.47$180
Jan 2023018976.533.39$640
Dec 2022017176.415.73$980
Nov 2022018285.005.65$1,028
Oct 2022020487.185.86$1,196
Sep 2022019484.888.16$1,584
Aug 2022024594.529.13$2,236
Jul 20220260101.587.54$1,961
Jun 20220271115.097.98$2,162
May 20220269109.378.43$2,268
Apr 20220253104.226.84$1,730
Mar 20220154108.885.08$782
Feb 2022029191.054.86$1,414
Jan 2022028881.844.54$1,307
Dec 2021029271.323.90$1,139
Nov 2021029577.435.24$1,545
Oct 2021032579.795.71$1,857
Sep 2021033069.865.35$1,766
Aug 2021036166.024.22$1,524
Jul 2021030770.783.98$1,223
Jun 2021036269.493.38$1,224
May 2021028463.483.02$857
Apr 2021036360.362.76$1,001
Mar 2021038661.302.72$1,049
Feb 2021031057.805.55$1,720
Jan 2021038250.412.81$1,074
Dec 2020027544.642.68$736
Nov 2020029438.772.71$796
Oct 2020033636.972.48$833
Sep 2020028137.091.99$559
Aug 2020030139.982.39$718
Jul 2020032438.371.83$591
Jun 2020024634.901.69$416
May 2020036016.921.81$653
Apr 2020039814.751.80$718
Mar 2020040230.341.86$746
Feb 2020039449.881.98$780
Jan 2020041557.252.09$869
Dec 2019043059.012.30$991
Nov 2019040855.302.75$1,122
Oct 2019040853.472.42$987
Sep 2019040655.052.66$1,079
Aug 2019033453.112.30$770
Jul 2019021756.272.46$534
Jun 2019035952.782.49$894
May 2019035858.482.74$981
Apr 2019032062.632.75$880
Mar 2019026856.803.06$821
Feb 2019024850.852.79$692
Jan 2019028146.033.23$907
Dec 2018031146.594.19$1,302
Nov 2018031252.934.24$1,322
Oct 2018034161.443.40$1,159
Sep 2018036359.543.11$1,128
Aug 2018025959.403.07$794
Jul 2018036965.142.93$1,082
Jun 2018037060.183.08$1,138
May 2018034565.382.90$1,001
Apr 2018025663.842.90$743
Mar 2018043661.222.79$1,215
Feb 2018035661.782.77$985
Jan 2018027062.874.01$1,083
Dec 2017027957.272.92$815
Nov 2017032955.423.12$1,026
Oct 2017029749.292.98$886
Sep 2017029347.523.09$905
Aug 2017031045.373.00$931
Jul 2017033343.873.09$1,028
Jun 2017036542.493.09$1,127
May 2017043045.373.26$1,403
Apr 2017042747.933.21$1,371
Mar 2017044046.772.98$1,313
Feb 2017041050.452.95$1,211
Jan 2017045749.413.42$1,562
Dec 2016046748.763.72$1,739
Nov 2016046642.492.64$1,232
Oct 2016047646.193.09$1,471
Sep 2016048241.553.10$1,495
Aug 2016048741.442.92$1,424
Jul 2016047141.622.92$1,377
Jun 2016046945.352.69$1,260
May 2016047842.521.99$952
Apr 2016046136.561.99$918
Mar 2016034833.011.79$624
Feb 2016032926.472.06$679
Jan 2016032127.352.36$759
Dec 2015036832.362.00$737
Nov 2015032738.792.17$709
Oct 2015036143.552.43$876
Sep 2015038442.992.76$1,059
Aug 2015047940.162.87$1,376
Jul 2015052848.152.95$1,555
Jun 2015050256.152.88$1,447
May 2015058455.212.96$1,726
Apr 2015054949.822.71$1,486
Mar 2015056042.892.93$1,643
Feb 2015049644.662.98$1,476
Jan 2015050543.433.10$1,566
Dec 2014042254.693.59$1,516
Nov 2014042070.464.25$1,786
Oct 2014044278.303.90$1,724
Sep 2014046186.164.05$1,865
Aug 2014047189.394.04$1,901
Jul 2014045296.564.18$1,889
Jun 2014044698.164.74$2,113
May 2014049294.734.73$2,325
Apr 2014053995.944.81$2,592
Mar 2014052095.895.06$2,630
Feb 2014056397.406.19$3,486
Jan 2014054190.404.86$2,630
Dec 2013033791.824.35$1,467
Nov 2013057288.853.74$2,138
Oct 2013060397.423.78$2,279
Sep 20130584104.113.72$2,171
Aug 20130623104.253.52$2,195
Jul 20130654102.523.72$2,431
Jun 2013048994.403.93$1,923
May 2013044394.834.15$1,838
Apr 2013048393.964.28$2,068
Mar 2013042593.623.91$1,663
Feb 2013049691.233.42$1,696
Jan 2013063191.603.42$2,158
Dec 2012063686.773.42$2,175
Nov 2012062286.953.62$2,255
Oct 2012065389.383.40$2,220
Sep 2012063194.672.92$1,842
Aug 2012066292.662.91$1,925
Jul 2012070885.133.02$2,139
Jun 2012063979.822.52$1,610
May 2012072391.612.49$1,799
Apr 20120552101.652.00$1,102
Mar 20120748105.052.22$1,662
Feb 20120690101.102.57$1,773
Jan 2012076698.092.73$2,094
Dec 2011077396.873.24$2,504
Nov 2011091095.723.31$3,013
Oct 2011039484.983.65$1,438
Sep 2011067583.623.99$2,690
Aug 2011074283.404.15$3,079
Jul 2011075394.144.52$3,401
Jun 2011073492.904.64$3,406
May 2011076498.134.40$3,365
Apr 20110683105.964.33$2,960
Mar 2011077796.364.06$3,153
Feb 2011072685.644.18$3,035
Jan 2011076386.504.59$3,501
Dec 2010075085.734.35$3,261
Nov 2010075980.843.80$2,881
Oct 2010082278.103.51$2,884
Sep 2010076172.633.98$3,028
Aug 2010084873.684.42$3,748
Jul 2010091172.554.74$4,315
Jun 2010078570.364.91$3,855
May 2010096771.124.24$4,095
Apr 2010075481.694.12$3,109
Mar 2010053278.394.39$2,335
Feb 2010068273.585.44$3,712
Jan 2010093874.365.96$5,594
Dec 2009095471.445.48$5,232
Nov 200901,28774.593.75$4,828
Oct 200901,00272.544.11$4,118
Sep 2009098765.543.06$3,025
Aug 200901,03667.423.22$3,334
Jul 200901,07861.133.46$3,735
Jun 200901,12266.163.90$4,370
May 2009087654.743.93$3,439
Apr 200901,14846.773.59$4,118
Mar 200901,25442.144.06$5,090
Feb 200901,18632.814.63$5,495
Jan 200901,45435.865.37$7,809
Dec 200801,19237.105.98$7,125
Nov 200801,26955.496.86$8,706
Oct 200801,61875.246.92$11,200
Sep 20080463101.767.88$3,647
Aug 200801,648114.228.48$13,980
Jul 200801,689131.0811.39$19,237
Jun 200801,569131.3313.03$20,448
May 200801,978123.1711.57$22,894
Apr 200801,840110.3110.45$19,237
Mar 200801,805101.909.66$17,444
Feb 2008070592.538.77$6,183
Jan 2008065490.388.21$5,367
Dec 2007070588.337.30$5,148
Nov 2007069991.677.29$5,097
Oct 2007089982.856.92$6,223
Sep 2007090275.846.24$5,632
Aug 2007090569.066.39$5,781
Jul 2007079070.906.39$5,046
Jun 2007080262.007.55$6,054
May 2007098758.747.85$7,744
Apr 2007083659.617.81$6,525
Mar 2007096956.927.30$7,076
Feb 2007084655.108.22$6,951
Jan 200701,14650.306.73$7,709
Dec 200601,28356.656.92$8,876
Nov 200601,47954.207.62$11,266
Oct 200601,52354.906.01$9,159
Sep 200601,60260.085.04$8,070
Aug 200601,63268.717.34$11,979
Jul 200601,60369.376.34$10,167
Jun 200602,08666.286.38$13,317
May 200602,09866.016.42$13,480
Apr 200602,34364.397.36$17,246
Mar 200602,80056.707.08$19,832
Feb 200602,69057.597.75$20,851
Jan 200603,55760.598.93$31,776
Dec 200504,77054.9413.42$63,991
Nov 200502,33354.6910.59$24,703

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  129 Mcf  × $  3.05 =       $393

────────────────────────────────────────────────────
Month total                                     $393

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/214985 is the state's own key, not one this site invented.