MILLSPAUGH, S. 14

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 215576District 7CField 679952002 tax incentive programmesCondensateGasSaveExport
Value, all time
$760 k
Dec 2005 – May 2026
Value, last 12 filed months
$5 k
at the published price for each month
Months reported
246
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-08-14169655
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition21 bbl$1,347
GasProduction152,763 Mcf$758,365
Total$759,712

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5296, -101.4387. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.52959, -101.43870 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,900 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,900 ft.

Completions filed
Dec 2005
1 of 1 wells

1 well

42-10539786126,900 ftDec 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (246)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

246 months

May 20260194106.413.05$591
Apr 202604998.932.87$141
Mar 20260089.753.15$0
Feb 202605963.503.75$221
Jan 202616259.138.00$555
Dec 202516456.664.41$339
Nov 20250058.593.93$0
Oct 202514659.383.30$211
Sep 2025122662.743.08$758
Aug 2025223463.933.01$833
Jul 2025223266.743.32$903
Jun 2025124366.483.13$827
May 2025324360.553.23$967
Apr 2025325462.363.54$1,087
Mar 2025429867.704.27$1,543
Feb 2025218570.884.34$945
Jan 20250074.324.28$0
Dec 2024060768.993.12$1,895
Nov 2024034669.052.20$761
Oct 2024032571.372.28$741
Sep 2024035069.612.36$828
Aug 2024039975.632.06$823
Jul 2024039979.932.15$856
Jun 2024039178.082.63$1,030
May 2024040578.812.20$890
Apr 2024039684.451.66$657
Mar 2024041180.301.55$635
Feb 2024038376.091.78$683
Jan 2024041573.023.30$1,369
Dec 2023040471.262.61$1,055
Nov 2023040777.892.81$1,143
Oct 2023040985.443.09$1,263
Sep 2023042189.042.74$1,151
Aug 2023045880.522.67$1,224
Jul 2023046474.852.64$1,226
Jun 2023043768.962.26$987
May 2023036870.622.23$820
Apr 2023028078.122.24$627
Mar 2023031372.852.39$749
Feb 2023026275.112.47$646
Jan 2023029276.533.39$989
Dec 2022021476.415.73$1,226
Nov 2022021785.005.65$1,225
Oct 2022022487.185.86$1,313
Sep 2022021784.888.16$1,772
Aug 2022029894.529.13$2,720
Jul 20220369101.587.54$2,783
Jun 20220328115.097.98$2,617
May 20220366109.378.43$3,086
Apr 20220329104.226.84$2,250
Mar 20220325108.885.08$1,650
Feb 2022043391.054.86$2,104
Jan 2022055481.844.54$2,514
Dec 2021031671.323.90$1,232
Nov 2021028077.435.24$1,466
Oct 2021029179.795.71$1,663
Sep 2021029469.865.35$1,573
Aug 2021031766.024.22$1,338
Jul 2021034270.783.98$1,362
Jun 2021039569.493.38$1,335
May 2021035863.483.02$1,080
Apr 2021042060.362.76$1,159
Mar 2021077461.302.72$2,103
Feb 2021038457.805.55$2,130
Jan 202101,28650.412.81$3,614
Dec 2020046644.642.68$1,247
Nov 2020048338.772.71$1,307
Oct 2020062336.972.48$1,544
Sep 2020050637.091.99$1,007
Aug 2020051639.982.39$1,231
Jul 2020060838.371.83$1,110
Jun 2020026534.901.69$448
May 2020072216.921.81$1,310
Apr 2020079914.751.80$1,442
Mar 202001,09130.341.86$2,025
Feb 2020050849.881.98$1,006
Jan 2020054057.252.09$1,131
Dec 2019053259.012.30$1,226
Nov 2019051655.302.75$1,419
Oct 2019044553.472.42$1,076
Sep 2019040655.052.66$1,079
Aug 2019042353.112.30$975
Jul 2019038056.272.46$935
Jun 2019040952.782.49$1,019
May 2019042758.482.74$1,170
Apr 2019041262.632.75$1,133
Mar 2019044156.803.06$1,350
Feb 2019039250.852.79$1,095
Jan 2019046846.033.23$1,511
Dec 2018050446.594.19$2,109
Nov 2018044052.934.24$1,864
Oct 2018044661.443.40$1,516
Sep 2018049359.543.11$1,532
Aug 2018037259.403.07$1,141
Jul 2018048065.142.93$1,407
Jun 2018046660.183.08$1,434
May 2018045665.382.90$1,323
Apr 2018045563.842.90$1,320
Mar 2018048261.222.79$1,343
Feb 2018038161.782.77$1,054
Jan 2018033462.874.01$1,339
Dec 2017037657.272.92$1,098
Nov 2017054655.423.12$1,703
Oct 2017042049.292.98$1,253
Sep 2017028847.523.09$889
Aug 2017030445.373.00$913
Jul 2017031143.873.09$960
Jun 2017030942.493.09$954
May 2017033445.373.26$1,090
Apr 2017033747.933.21$1,082
Mar 2017036746.772.98$1,095
Feb 2017035150.452.95$1,036
Jan 2017043049.413.42$1,470
Dec 2016050548.763.72$1,880
Nov 2016059142.492.64$1,563
Oct 2016057446.193.09$1,774
Sep 2016056241.553.10$1,743
Aug 2016048641.442.92$1,421
Jul 2016043541.622.92$1,272
Jun 2016041245.352.69$1,107
May 2016042842.521.99$852
Apr 2016040936.561.99$814
Mar 2016042333.011.79$759
Feb 2016039026.472.06$805
Jan 2016042427.352.36$1,002
Dec 2015045732.362.00$915
Nov 2015053738.792.17$1,164
Oct 2015052843.552.43$1,281
Sep 2015040742.992.76$1,123
Aug 2015041840.162.87$1,201
Jul 2015046248.152.95$1,361
Jun 2015043456.152.88$1,251
May 2015050755.212.96$1,498
Apr 2015054049.822.71$1,462
Mar 2015055342.892.93$1,623
Feb 2015047544.662.98$1,414
Jan 2015054743.433.10$1,696
Dec 2014055354.693.59$1,986
Nov 2014055670.464.25$2,364
Oct 2014053978.303.90$2,103
Sep 2014054886.164.05$2,217
Aug 2014056189.394.04$2,264
Jul 2014047396.564.18$1,977
Jun 2014047698.164.74$2,255
May 2014051394.734.73$2,425
Apr 2014045895.944.81$2,203
Mar 2014040095.895.06$2,023
Feb 2014043697.406.19$2,700
Jan 2014049490.404.86$2,401
Dec 2013049791.824.35$2,164
Nov 2013049288.853.74$1,839
Oct 2013051297.423.78$1,935
Sep 20130497104.113.72$1,848
Aug 20130482104.253.52$1,698
Jul 20130499102.523.72$1,855
Jun 2013052094.403.93$2,045
May 2013035094.834.15$1,452
Apr 2013051393.964.28$2,197
Mar 2013034593.623.91$1,350
Feb 2013041891.233.42$1,430
Jan 2013048091.603.42$1,642
Dec 2012051786.773.42$1,768
Nov 2012044586.953.62$1,613
Oct 2012030989.383.40$1,051
Sep 2012049794.672.92$1,450
Aug 2012051492.662.91$1,495
Jul 2012052885.133.02$1,595
Jun 2012052179.822.52$1,312
May 2012054391.612.49$1,351
Apr 20120529101.652.00$1,056
Mar 20120556105.052.22$1,235
Feb 20120518101.102.57$1,331
Jan 2012055098.092.73$1,504
Dec 2011052796.873.24$1,707
Nov 2011054095.723.31$1,788
Oct 2011054684.983.65$1,992
Sep 2011054283.623.99$2,160
Aug 2011072583.404.15$3,008
Jul 2011072994.144.52$3,293
Jun 2011070792.904.64$3,280
May 2011074398.134.40$3,273
Apr 20110669105.964.33$2,899
Mar 2011077496.364.06$3,140
Feb 2011073685.644.18$3,076
Jan 2011074286.504.59$3,405
Dec 2010086685.734.35$3,765
Nov 2010057580.843.80$2,182
Oct 2010080778.103.51$2,832
Sep 2010071772.633.98$2,853
Aug 2010081473.684.42$3,597
Jul 2010090272.554.74$4,272
Jun 2010078170.364.91$3,835
May 2010089971.124.24$3,807
Apr 2010077081.694.12$3,174
Mar 2010092078.394.39$4,038
Feb 2010080673.585.44$4,387
Jan 2010090974.365.96$5,421
Dec 2009087671.445.48$4,804
Nov 2009087274.593.75$3,271
Oct 2009092772.544.11$3,810
Sep 2009095265.543.06$2,918
Aug 200901,01467.423.22$3,264
Jul 200901,03261.133.46$3,575
Jun 200901,02966.163.90$4,008
May 200901,10454.743.93$4,334
Apr 200901,10346.773.59$3,957
Mar 200901,01842.144.06$4,132
Feb 2009090532.814.63$4,193
Jan 200901,02135.865.37$5,484
Dec 200801,07337.105.98$6,413
Nov 2008093955.496.86$6,442
Oct 200801,07875.246.92$7,462
Sep 20080634101.767.88$4,994
Aug 200801,049114.228.48$8,899
Jul 200801,091131.0811.39$12,426
Jun 200801,065131.3313.03$13,880
May 200801,130123.1711.57$13,079
Apr 200801,092110.3110.45$11,417
Mar 20080997101.909.66$9,635
Feb 2008068992.538.77$6,043
Jan 2008086790.388.21$7,114
Dec 200701,99288.337.30$14,546
Nov 200701,31991.677.29$9,618
Oct 200701,26882.856.92$8,777
Sep 200701,22975.846.24$7,674
Aug 200701,16669.066.39$7,448
Jul 200701,32070.906.39$8,432
Jun 200701,38162.007.55$10,424
May 200701,43558.747.85$11,259
Apr 200701,31859.617.81$10,287
Mar 200701,46856.927.30$10,719
Feb 200701,36855.108.22$11,239
Jan 200701,52950.306.73$10,285
Dec 200601,56156.656.92$10,800
Nov 200601,38054.207.62$10,512
Oct 200601,62054.906.01$9,742
Sep 200601,67860.085.04$8,452
Aug 200602,89868.717.34$21,271
Jul 200601,84669.376.34$11,709
Jun 200601,60266.286.38$10,227
May 200601,06266.016.42$6,823
Apr 2006088564.397.36$6,514
Mar 200601,16956.707.08$8,280
Feb 200601,88657.597.75$14,619
Jan 200602,54460.598.93$22,726
Dec 200502,27154.9413.42$30,466

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  194 Mcf  × $  3.05 =       $591

────────────────────────────────────────────────────
Month total                                     $591

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/215576 is the state's own key, not one this site invented.