MILLSPAUGH, S. 14

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 216886District 7CField 679952002 tax incentive programmesGasSaveExport
Value, all time
$321 k
Jan 2006 – May 2026
Value, last 12 filed months
$1 k
at the published price for each month
Months reported
245
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-01-09172382
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction54,136 Mcf$320,540
Total$320,540

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5271, -101.4394. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.52712, -101.43937 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,875 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,875 ft.

Completions filed
Jan 2006
1 of 1 wells

1 well

42-10539809116,875 ftJan 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (245)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

245 months

May 202616106.413.05$49
Apr 20263298.932.87$92
Mar 2026089.753.15$0
Feb 20262163.503.75$79
Jan 20262359.138.00$184
Dec 20252856.664.41$124
Nov 20252858.593.93$110
Oct 20252859.383.30$93
Sep 20252562.743.08$77
Aug 20252563.933.01$75
Jul 20252766.743.32$90
Jun 20252866.483.13$88
May 20252860.553.23$91
Apr 20253262.363.54$113
Mar 20252967.704.27$124
Feb 20252570.884.34$109
Jan 2025074.324.28$0
Dec 20242468.993.12$75
Nov 20242569.052.20$55
Oct 20242971.372.28$66
Sep 20242769.612.36$64
Aug 20242875.632.06$58
Jul 20241779.932.15$36
Jun 20242978.082.63$76
May 20242278.812.20$48
Apr 20242484.451.66$40
Mar 20242880.301.55$43
Feb 20242176.091.78$37
Jan 20242773.023.30$89
Dec 20232671.262.61$68
Nov 20232977.892.81$81
Oct 20234085.443.09$123
Sep 2023089.042.74$0
Aug 20233080.522.67$80
Jul 20232974.852.64$77
Jun 20233168.962.26$70
May 20233070.622.23$67
Apr 20233778.122.24$83
Mar 20233372.852.39$79
Feb 20233075.112.47$74
Jan 20233976.533.39$132
Dec 20223576.415.73$201
Nov 20223385.005.65$186
Oct 20223687.185.86$211
Sep 20224184.888.16$335
Aug 20224094.529.13$365
Jul 202227101.587.54$204
Jun 202227115.097.98$215
May 202228109.378.43$236
Apr 202228104.226.84$191
Mar 202229108.885.08$147
Feb 202258591.054.86$2,842
Jan 202245581.844.54$2,065
Dec 20212971.323.90$113
Nov 20213277.435.24$168
Oct 20214179.795.71$234
Sep 20212969.865.35$155
Aug 20214766.024.22$198
Jul 20215570.783.98$219
Jun 20214269.493.38$142
May 20213563.483.02$106
Apr 20214260.362.76$116
Mar 20214761.302.72$128
Feb 20213657.805.55$200
Jan 20213650.412.81$101
Dec 2020844.642.68$21
Nov 2020638.772.71$16
Oct 2020536.972.48$12
Sep 2020637.091.99$12
Aug 2020939.982.39$21
Jul 2020438.371.83$7
Jun 20202434.901.69$41
May 2020016.921.81$0
Apr 2020014.751.80$0
Mar 2020030.341.86$0
Feb 2020049.881.98$0
Jan 2020057.252.09$0
Dec 2019059.012.30$0
Nov 2019055.302.75$0
Oct 20191653.472.42$39
Sep 20195555.052.66$146
Aug 20196353.112.30$145
Jul 20195256.272.46$128
Jun 20196652.782.49$164
May 20198358.482.74$227
Apr 20198862.632.75$242
Mar 201910256.803.06$312
Feb 20198850.852.79$246
Jan 20199946.033.23$320
Dec 20189746.594.19$406
Nov 201810552.934.24$445
Oct 20183961.443.40$133
Sep 20184459.543.11$137
Aug 20183859.403.07$117
Jul 20184165.142.93$120
Jun 20184260.183.08$129
May 20184965.382.90$142
Apr 20185463.842.90$157
Mar 20185861.222.79$162
Feb 20187161.782.77$196
Jan 20185062.874.01$200
Dec 20174857.272.92$140
Nov 20172855.423.12$87
Oct 20176849.292.98$203
Sep 20177447.523.09$228
Aug 20178345.373.00$249
Jul 20177543.873.09$232
Jun 20177842.493.09$241
May 20178145.373.26$264
Apr 20177847.933.21$251
Mar 20178246.772.98$245
Feb 20177950.452.95$233
Jan 20178649.413.42$294
Dec 201610048.763.72$372
Nov 20168742.492.64$230
Oct 201610146.193.09$312
Sep 20168441.553.10$260
Aug 20166141.442.92$178
Jul 20167341.622.92$213
Jun 20167545.352.69$201
May 20168042.521.99$159
Apr 20167236.561.99$143
Mar 20166933.011.79$124
Feb 20166026.472.06$124
Jan 20166027.352.36$142
Dec 20156332.362.00$126
Nov 20155938.792.17$128
Oct 20156043.552.43$146
Sep 20155942.992.76$163
Aug 20156540.162.87$187
Jul 20156448.152.95$188
Jun 20156156.152.88$176
May 20157055.212.96$207
Apr 20156849.822.71$184
Mar 20156642.892.93$194
Feb 20156644.662.98$196
Jan 20157143.433.10$220
Dec 20147354.693.59$262
Nov 20146970.464.25$293
Oct 20147278.303.90$281
Sep 20147386.164.05$295
Aug 20147689.394.04$307
Jul 20147996.564.18$330
Jun 20148098.164.74$379
May 20147494.734.73$350
Apr 20146995.944.81$332
Mar 20145395.895.06$268
Feb 20144897.406.19$297
Jan 20147990.404.86$384
Dec 20138491.824.35$366
Nov 20138288.853.74$307
Oct 20138697.423.78$325
Sep 201389104.113.72$331
Aug 201394104.253.52$331
Jul 201399102.523.72$368
Jun 20139294.403.93$362
May 20138894.834.15$365
Apr 20139393.964.28$398
Mar 20138893.623.91$344
Feb 20139591.233.42$325
Jan 201310691.603.42$363
Dec 201211286.773.42$383
Nov 201210186.953.62$366
Oct 201210389.383.40$350
Sep 201211794.672.92$341
Aug 201212392.662.91$358
Jul 201213385.133.02$402
Jun 201212679.822.52$317
May 201213491.612.49$333
Apr 2012129101.652.00$258
Mar 2012139105.052.22$309
Feb 2012132101.102.57$339
Jan 201214798.092.73$402
Dec 201115096.873.24$486
Nov 201115495.723.31$510
Oct 201116184.983.65$587
Sep 201116283.623.99$646
Aug 201115983.404.15$660
Jul 201116794.144.52$754
Jun 201117192.904.64$793
May 201118598.134.40$815
Apr 2011188105.964.33$815
Mar 201120896.364.06$844
Feb 201117485.644.18$727
Jan 201121886.504.59$1,000
Dec 201025085.734.35$1,087
Nov 201025580.843.80$968
Oct 201034978.103.51$1,225
Sep 201032772.633.98$1,301
Aug 201036573.684.42$1,613
Jul 201038572.554.74$1,824
Jun 201035470.364.91$1,738
May 201041871.124.24$1,770
Apr 201034981.694.12$1,439
Mar 201041678.394.39$1,826
Feb 201036873.585.44$2,003
Jan 201040374.365.96$2,404
Dec 200941271.445.48$2,259
Nov 200941374.593.75$1,549
Oct 200944672.544.11$1,833
Sep 200944165.543.06$1,352
Aug 200947067.423.22$1,513
Jul 200948761.133.46$1,687
Jun 200947566.163.90$1,850
May 200951254.743.93$2,010
Apr 200951546.773.59$1,848
Mar 200955442.144.06$2,249
Feb 200953532.814.63$2,479
Jan 200957735.865.37$3,099
Dec 200859437.105.98$3,550
Nov 200855155.496.86$3,780
Oct 200843975.246.92$3,039
Sep 2008245101.767.88$1,930
Aug 2008591114.228.48$5,013
Jul 2008457131.0811.39$5,205
Jun 2008326131.3313.03$4,249
May 2008407123.1711.57$4,711
Apr 2008526110.3110.45$5,499
Mar 2008610101.909.66$5,895
Feb 200860892.538.77$5,333
Jan 200877990.388.21$6,392
Dec 200783288.337.30$6,075
Nov 200740291.677.29$2,931
Oct 200743582.856.92$3,011
Sep 200744975.846.24$2,804
Aug 200735969.066.39$2,293
Jul 200739870.906.39$2,542
Jun 200743762.007.55$3,299
May 200765758.747.85$5,155
Apr 200759859.617.81$4,668
Mar 200774056.927.30$5,403
Feb 200781255.108.22$6,671
Jan 200796350.306.73$6,478
Dec 20061,63456.656.92$11,305
Nov 20061,43454.207.62$10,923
Oct 20061,03754.906.01$6,236
Sep 20061,57060.085.04$7,908
Aug 20061,77268.717.34$13,006
Jul 20061,15069.376.34$7,294
Jun 20061,20266.286.38$7,673
May 20061,86066.016.42$11,951
Apr 20062,79064.397.36$20,536
Mar 20061,91756.707.08$13,578
Feb 20061,37357.597.75$10,642
Jan 200667160.598.93$5,994

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Gas                   16 Mcf  × $  3.05 =        $49

────────────────────────────────────────────────────
Month total                                      $49

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/216886 is the state's own key, not one this site invented.